Tender Details
Particulars | Details |
---|---|
Title |
Day To Day Works For Shifting Of Pump Motor Sets, Extension/ Shifting Of Pipelines, Laying And Jointing Of Pipelines And Other Associated Works Related At Lower Kusmunda 2 Quarry Sump On As And When Required Basis For A Period Of One Year At Dep.
|
Description |
Day To Day Works For Shifting Of Pump Motor Sets, Extension/ Shifting Of Pipelines, Laying And Jointing Of Pipelines And Other Associated Works Related At Lower Kusmunda 2 Quarry Sump On As And When Required Basis For A Period Of One Year At Dep.
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_SECL_327084_1 |
Reference Number |
SECL/GM/DA/SO(EnM)/ e-tender/24-25/76 dtd-27/01/25 |
Tender Fee | 0 |
EMD | 89700 |
Tender Value | |
Place | Dipka Expansion Project, Dipka Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=339044 |
Start Date | January 29, 2025 15:30 |
End Date |
15/02/2025 ( Expired 86 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Bids for construction of intake, rwr , wtp at masi dam, pump house and connecting it with cwr for conjunctive use including o and m work for ten years after one year defect liability period for bisalpur-niwai- tonk wsp under jjm package-iii
Bids for construction of intake, rwr , wtp at masi dam, pump house and connecting it with cwr for conjunctive use including o and m work for ten years after one year defect liability period for bisalpur-niwai- tonk wsp under jjm package-iii
Read moreLaying of steel pipeline for connectivity of cng station at concor dadri
Laying and construction of underground steel pipeline network and associated works for connectivity of cng station at concor container depot dadri, gautam buddha nagar
Read moreRepair/replacement of pump sets, motor, panel, foot valves and allied works at afs yelahanka
Repair/replacement of pump sets, motor, panel, foot valves and allied works at afs yelahanka
Read moreOperation and maintenance of cranes, forklift, inspection vehicles, heavy vehicles, other machinery and attending miscellaneous works at alhw complex in dry dock for the period of one year (from 2025-26)
Operation and maintenance of cranes, forklift, inspection vehicles, heavy vehicles, other machinery and attending miscellaneous works at alhw complex in dry dock for the period of one year (from 2025-26)
Read moreDesign, engineering, construction, supply, erection, commissioning and testing of four number of natural draught cooling towers, cooling water pump house and associated works for ghavp unit 1 and 2 at vill gorakhpur, distt fatehabad, haryana.
Design, engineering, construction, supply, erection, commissioning and testing of four number of natural draught cooling towers, cooling water pump house and associated works for ghavp unit 1 and 2 at vill gorakhpur, distt fatehabad, haryana.
Read moreRepairing inc rewinding of existing vt pump with motor sets, er main switch electrical panel boards, suction line etc and other works of 0.55 mgd capacity surface water treatment plant at kulai under dws sub-division ambassa
Repairing inc rewinding of existing vt pump with motor sets, er main switch electrical panel boards, suction line etc and other works of 0.55 mgd capacity surface water treatment plant at kulai under dws sub-division ambassa
Read moreCross jointing by hot vulcanizing process in steel cord belting st 2000 1200 mm width in c4 conveyor of rls bocp as and when required for a period of one year
Cross jointing by hot vulcanizing process in steel cord belting st 2000 1200 mm width in c4 conveyor of rls bocp as and when required for a period of one year
Read moreWork of repair of 2 no vt pump sets at wtp for temporary works not included in the original chambal sawai madhopur nadauti project to supply 16 mld water to 109 villages of package ii of this project and partial supply to karauli and gangapur
Work of repair of 2 no vt pump sets at wtp for temporary works not included in the original chambal sawai madhopur nadauti project to supply 16 mld water to 109 villages of package ii of this project and partial supply to karauli and gangapur
Read moreBalance work of retrofitting piped water supply scheme under jal jeevan mission at village dulhai block pichhore distt shivpuri based on tube well including installation of electric submersible water motor pump, laying and jointing distribution pipe
Balance work of retrofitting piped water supply scheme under jal jeevan mission at village dulhai block pichhore distt shivpuri based on tube well including installation of electric submersible water motor pump, laying and jointing distribution pipe
Read moreShifting installation commissioning pump as well as laying fitting dismantling of different size pipeline extension shortenging of delivery pipes as per requirement depending water level up and down of sump water of bharatpur ocp for one year
Shifting installation commissioning pump as well as laying fitting dismantling of different size pipeline extension shortenging of delivery pipes as per requirement depending water level up and down of sump water of bharatpur ocp for one year
Read moreof your Industry type