Tender Details
Particulars | Details |
---|---|
Title |
(Re Tender) Adampur, Adampur, Bhanwan Das Urf Madha Ram Jyani Near Shamshan Ghat To Ghoda Bridge Along With Railway Line About 25ft Road West Side Of Adampur Village
|
Description |
(Re Tender) Adampur, Adampur, Bhanwan Das Urf Madha Ram Jyani Near Shamshan Ghat To Ghoda Bridge Along With Railway Line About 25ft Road West Side Of Adampur Village
|
Organisation | Government of Haryana |
Tender Id | 2023_HRY_323424_1 |
Reference Number |
2023D7F30B26 65CB 40AE A186 07CFD5C0FC9B699DEV |
Tender Fee | 5000 |
EMD | 1.25 Lakh |
Tender Value | |
Place | Executive Engineer Hisar |
Link | https://etenders.hry.nic.in |
Start Date | October 27, 2023 14:30 |
End Date |
03/11/2023 ( Expired 579 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of approach road with both side reinforced earth (re) wall to existing railway over bridge at railway km 446/625 under sen/mao section of krcl in the state of goa
For complete deion and other details, please refer to tender
Read moreDharnia- laying of rcc pipe line from adampur minor moga no 7992 right f/o sh. jogi ram s/o badhuram to sita ram s/o ladhuram at village dharnia,block fatehabad district fatehabad (d-plan) re tender
Dharnia- laying of rcc pipe line from adampur minor moga no 7992 right f/o sh. jogi ram s/o badhuram to sita ram s/o ladhuram at village dharnia,block fatehabad district fatehabad (d-plan) re tender
Read moreConstruction of rob on lc 88 on rewari-bhatinda railway line at km 135/4-5 on hisar - satrod road to south (dismental and re- errection of street light pole from road devider at intersection of satrod chowk with hisar-hansi road for 150 mtr each side
Construction of rob on lc 88 on rewari-bhatinda railway line at km 135/4-5 on hisar - satrod road to south (dismental and re- errection of street light pole from road devider at intersection of satrod chowk with hisar-hansi road for 150 mtr each side
Read moreRequest for proposal for jeypore -navarangpur new railway line project: construction of new bg railway line between ambaguda(excluding) (13.60 km) to navarangpur (including) (44.14 km) involving earthwork in formation in embankment/cutting, blanketing, side drains, catch water drains, minor bridges, major bridges(excluding indravati bridge), road over bridges (robs), road under bridges (rubs), protection works, p.way track works with contractor s own material supplies including supply of
For complete deion and other details, please refer to tender
Read moreD plan const. of brick paved rasta from f/o aman to f/o kiran pal in vill. manglai and nala along with phirni in vill. bhilpura and i/l pavers in shamshan ghat near main road in vill. sahibpura, block ambala-ii
D plan const. of brick paved rasta from f/o aman to f/o kiran pal in vill. manglai and nala along with phirni in vill. bhilpura and i/l pavers in shamshan ghat near main road in vill. sahibpura, block ambala-ii
Read moreConstruction of boundary wall at approach road west side at barauni top.
At barauni top we have 600 m of approach road which connects the top to the nh-31. this approach road is in used by the tls for general entry/ and emergency also. the road is bounded on the east side by the hpc boundary wall and chain link fencing on the west side towards the village area. this has led to several cases of encroachment by local people. fencing are regularly damaged and local people access the approach road in an unauthorized manner. this may cause near misses and accidents as locals often bring their children and cattles on the road. in order to avoid any untoward incident in near future, it is proposed to provide boundary wall along the approach road on the west side of the road to safe guard bpcl property. .
Read moreConstruction of ppc road interlocking line and rcc drain from ram nagar tiraha to west side tiraha near cooperative bank at np kishni
Construction of ppc road interlocking line and rcc drain from ram nagar tiraha to west side tiraha near cooperative bank at np kishni&#x0d
Read moreExecution of additional balance work for making of sub-bank side of 3rd line formation, minor bridge approach bank, protection work, construction of rcc work on station road approach, balance work in p.f no. 5 & 6, platform shelter work and other allied p. way works in connection with rntl-rljc section including ranital station yard under narayangarh-bhadrak 3rd line project of kharagpur division, south eastern railway. estimate no. 1792w/2019.
For complete deion and other details, please refer to tender
Read moreMaintenance of road from tsr boundary wall near shani mandir to railway boundary wall l 90.00 m and allied roads under amc ward no. 45 along with cc road l 60.00m and construction of drain l 330.00m from the house of sri nikhil das to the house of sr
Maintenance of road from tsr boundary wall near shani mandir to railway boundary wall l 90.00 m and allied roads under amc ward no. 45 along with cc road l 60.00m and construction of drain l 330.00m from the house of sri nikhil das to the house of sr
Read moreDrawing of lighting over head line 230 volt, 2 ph, 3 wire along with 230 volt, 200w led light from db road to new coal depot near parbatpur village of mohanpur colliery under salanpur area.
Drawing of lighting over head line 230 volt, 2 ph, 3 wire along with 230 volt, 200w led light from db road to new coal depot near parbatpur village of mohanpur colliery under salanpur area.
Read moreof your Industry type