Tender Details
Particulars | Details |
---|---|
Title |
Electrical Work
|
Description |
Providing Temporary Lighting 450 Nos 120 W Led For 2 Days On (19 04 2025 To 20 04 2025) At Hyder Guda Chaithanya Villas Colony Mallikarjuna Temple In Attapur Division (61) In (Rajendra Nagar Circle And Constituency In View Of Mallikarjuna Swamy Varshikosthavam
|
Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
Tender Id | 589153 |
Reference Number |
NIT. No: 1/EE Elect.)CMRZ/GHMC/AET/2025-26, Item No:01, dated: 17-04-2025. |
Tender Fee | 62 |
EMD | 1739 |
Tender Value | |
Place | TS |
Link | http://eprocurement.telangana.gov.in/ |
Start Date | April 17, 2025 19:30 |
End Date |
19/04/2025 ( Expired 3 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing, commissioning and training of electrical, plumbing and fire protection works for 19 underground stations from madhavaram milk colony station to royapettah govt hospital
Station including bored tunnel between stations (ch 76.000 to ch 17250.000) for corridor 3 of chennai metro rail project phase ii.
Read moreSupply,installation, testing, commissioning and training of electrical, fire alarm and detection, fire fighting, vac and bms works for nine elevated stations
Sholinganallur lake to sipcot 2 station including stabling lines, viaduct between the stations (ch 35044.000 to 44671.000) for corridor- 3 of chennai metro rail project phase-ii.
Read moreLandslide treatment work of 08 location on nh-07 under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work of 08 location on nh-07 under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreVac, tvs along with electrical and scada works for 16 ug stations in corridor-3 of phase-2 cmrl project including tunnel and ramp sections between the stations
Vac, tvs along with electrical and scada works for 16 ug stations in corridor-3 including tunnel and ramp sections between the stations
Read moreVac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 of phase-2 cmrl project including integration at occ level.
Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 including integration at occ level.
Read moreRectification and balance work of 8l delhi vadodara greenfield alignment section pkg-13 of nh 148n on epc mode under bharatmala pariyojana in the state of rajasthan on risk and cost of contractor
Rectification and balance work of 8l delhi vadodara greenfield alignment section pkg-13 of nh 148n on epc mode under bharatmala pariyojana in the state of rajasthan on risk and cost of contractor
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of bhimashankar- taleghar-wada-rajgurunagar road (nh-60 spur) in the state of maharashtra ham.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of bhimashankar- taleghar-wada-rajgurunagar road (nh-60 spur) in the state of maharashtra ham.
Read moreDesign and build of pedestrian skywalk at banashankari intersection including connectivity between banashankari metro station and ttmc building along with shifting of utilities, tree removal, landscaping, electrical (lt and ht) works etc. for bmrcl.
Design and build of pedestrian skywalk at banashankari intersection including connectivity between banashankari metro station and ttmc building along with shifting of utilities, tree removal, landscaping, electrical (lt and ht) works etc. for bmrcl.
Read moreAAAAAAAAAA
Login to viewBalance work of widening improvement to 2 lane lane with paved shoulder from km 27.150 to km 47.682 on dibrugarh to ledo section with proposed margherita and ledo bypass of nh 38 in tinsukia
Read moreof your Industry type