Tender Details

Particulars Details
Title
Four Laning Of Gyaraspur Rahatgarh Section Of Nh 146 From Design Chainage Km. 88.361 To Design Chainage At Km. 124.470 In The State Of Madhya Pradesh On Ham Mode.
Description
Four Laning Of Gyaraspur Rahatgarh Section Of Nh 146 From Design Chainage Km. 88.361 To Design Chainage At Km. 124.470 In The State Of Madhya Pradesh On Ham Mode.
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2024_NHAI_200898_1
Reference
Number
NHAI/HQ/MP/Gyaraspur- Rahatgarh/2024
Tender Fee 50000
EMD 4.71 Crore
Tender Value -
Place NHAI HQ
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=219832

Start Date July 10, 2024 14:30
End Date
Expired 25/11/2024

Expired 689 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)

4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)

Read more
Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)

Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)

Read more
Independent engineering services for four laning of madathukulam to pollachi section of nh-83 from design km 74/380 to km 116/950 of length-50.078 km on ham mode in the state of tamil nadu

Independent engineering services for four laning of madathukulam to pollachi section of nh-83 from design km 74/380 to km 116/950 of length-50.078 km on ham mode in the state of tamil nadu

Read more
Construction of 30.00m steel composite girder bridge at km 31.600 design chainage 243.46 on gangotri rishikesh section of nh34 on epc mode in the state of uttarakhand under epc mode

Construction of 30.00m steel composite girder bridge at km 31.600 design chainage 243.46 on gangotri rishikesh section of nh34 on epc mode in the state of uttarakhand under epc mode

Read more
Six-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode

Six-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode

Read more
Development of high speed ac gf highway from shamli gorakhpur from ch.466.000 to ch.510.700 in the state of uttar pradesh on ham mode package9 design length 44.700 km

Development of high speed ac gf highway from shamli gorakhpur from ch.466.000 to ch.510.700 in the state of uttar pradesh on ham mode package9 design length 44.700 km

Read more
Development of high-speed access controlled greenfield corridor from shamli gorakhpur from ch. 422.500 to ch.466.000 in the state of uttar pradesh on ham mode (package8) (design length 43.500 km.).

Development of high-speed access controlled greenfield corridor from shamli gorakhpur from ch. 422.500 to ch.466.000 in the state of uttar pradesh on ham mode (package8) (design length 43.500 km.).

Read more
Develop. of high speed ac gf corridor from shamli gorakhpur from ch. 579.950 to ch.662.400 in the state of uttar pradesh on ham mode package-11 design length 82.450 km

Develop. of high speed ac gf corridor from shamli gorakhpur from ch. 579.950 to ch.662.400 in the state of uttar pradesh on ham mode package-11 design length 82.450 km

Read more
Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-2) from design km 1423.000 sultanpura village to design km 1469.000 near ingui khurd village nh-27 in up on ham mode. (tl46.000 kms).

Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of jhansi orai section (pkg-2) from design km 1423.000 sultanpura village to design km 1469.000 near ingui khurd village nh-27 in up on ham mode. (tl46.000 kms).

Read more
Development of high speed access controlled greenfield highway from shamli-gorakhpur from ch. 662.400 to ch.745.594 in the state of uttar pradesh on ham mode (package-12) (design length 83.194 km)

Development of high speed access controlled greenfield highway from shamli-gorakhpur from ch. 662.400 to ch.745.594 in the state of uttar pradesh on ham mode (package-12) (design length 83.194 km)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise