Tender Details
Particulars | Details |
---|---|
Title |
36/Ee/O And M Ib/W And S/Kmda/2024 25 Sl 01
|
Description |
Supplying And Dosing Of Bleaching Powder Of Bcpl Or Dcm Make At 8 Nos .....Chamrail Gp Under Kona Faws Scheme For 365 Days
|
Organisation | KOLKATA METROPOLITAN DEVELOPMENT AUTHORITY | State Govt. and UT |
Tender Id | 2025_KMDA_827881_1 |
Reference Number |
36/EE/O and M-IB/W and S/KMDA/2024-25 |
Tender Fee | 0 |
EMD | 7665 |
Tender Value | |
Place | KOLKATA |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1843335 |
Start Date | March 18, 2025 00:25 |
End Date |
02/04/2025 ( Expired 37 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Jp/b862-201-pg-t-7490/1015 - steam generation system package for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Steam generation system package for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Read moreSurface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Read moreJp/b957-500-ma-t-6001/1016 - mounded bullet package of bina petchem and refinery expansion project(bprep) of m/s bharat petroleum corporation limited (bpcl)
Mounded bullet package of bina petchem and refinery expansion project(bprep) of m/s bharat petroleum corporation limited (bpcl)
Read moreDesign and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Design and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Read moreAAAAAAAAAA
Login to viewOperation and guarding of the pumping machinery and electrical installation of chlorination system at o.h.r no. 1 of raghunathpur w/s project under purulia mechanical division phe dte.
Read moreDesign, construction, establishment and development of processing plant and required development work and maintenance of engineered sanitary landfill site and o and m the 20 years having a minimum adequate capacity for rajsamand and scalable.........
Design, construction, establishment and development of processing plant and required development work and maintenance of engineered sanitary landfill site and o and m the 20 years having a minimum adequate capacity for rajsamand and scalable ........
Read moreAAAAAAAAAA
Login to viewAnnual o and m of jitpur zone-ii and katakobra zone- ii ( raipur ohr) piped water supply scheme in domkal block under murshidabad division phe dte
Read moreJp/b862-102-pl-t-4100/1014 automatic storage and retrieval system (as/rs) package for pdh-pp plant with ethane and propane handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Automatic storage and retrieval system (as/rs) package for pdh-pp plant with ethane and propane handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Read moreAAAAAAAAAA
Login to viewRestoration of kustaur railway station to chas chandankiary road at chainage 0.015 km due to damage caused by laying of pipe line by phed across the road under purulia highway division in the district of purulia.(ch. to deposit work)
Read moreAAAAAAAAAA
Login to viewSinking of 3 nos tw with replacement of 2nd t.w. by d.r. rig method, construction of 3nos 3.65 m x 3.0 m sr with sanitary and water supply arrangement, construction of 3 nos bw and connection of 3nos tubewell of dakshin rasulpur
Read moreof your Industry type