Design, Construction, Establishment And Development Of Processing Plant And Required Development Work And Maintenance Of Engineered Sanitary Landfill Site And O And M The 20 Years Having A Minimum Adequate Capacity For Rajsamand And Scalable.........
|
Description |
Design, Construction, Establishment And Development Of Processing Plant And Required Development Work And Maintenance Of Engineered Sanitary Landfill Site And O And M The 20 Years Having A Minimum Adequate Capacity For Rajsamand And Scalable ........
|
Organisation | DLB | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 12000 |
EMD | 13.6 Lakh |
Tender Value | |
Place | Rajsamand |
Link |
AAAAAAAAAA Login to view |
Start Date | May 06, 2025 14:30 |
End Date |
09/06/2025 ( 31 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, construction, establishment and development of processing plant and required development work and maintenance of engineered sanitary landfill site and o and m the 20 years having a minimum adequate capacity for rajsamand and scalable.........
Design, construction, establishment and development of processing plant and required development work and maintenance of engineered sanitary landfill site and o and m the 20 years having a minimum adequate capacity for rajsamand and scalable ........
Read moreSetting up of 50 tpd solid waste processing facilities including wet waste processing facility dry waste processing facility and sanitary landfill for processing inerts along with o and m of the facility for the duration of 7 plus 4 subject to rev
Setting up of 50 tpd solid waste processing facilities including wet waste processing facility dry waste processing facility and sanitary landfill for processing inerts along with o and m of the facility for the duration of 7 plus 4 subject to rev
Read moreDesign, supply, installation, testing and commissioning of grid connected ground mounted solar power plant of 25 mw (ac) with 40 percentage dc overload capacity at rampur colliery and samaleswari ocp, mcl and comprehensive o and m for ten years.
Design, supply, installation, testing and commissioning of grid connected ground mounted solar power plant of 25 mw (ac) with 40 percentage dc overload capacity at rampur colliery and samaleswari ocp, mcl and comprehensive o and m for ten years.
Read moreCreation of green barrier and buffer zones at achan landfill site srinagar. (o and m for three years)
Creation of green barrier and buffer zones at achan landfill site srinagar. (o and m for three years)
Read moreSelection of contractor to implement swm services on o/m basis of upsida industrial area panki site iv, kanpur on qcbs basis for a minimum period of 3 years and thereafter can be extended for two years(1year at a time on mutual agreement basis)
Selection of contractor to implement swm services on o/m basis of upsida industrial area panki site iv, kanpur on qcbs basis for a minimum period of 3 years and thereafter can be extended for two years(1year at a time on mutual agreement basis
Read moreSurvey design fabrication supply installation testing and commissioning of total 20 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 3 years
Survey design fabrication supply installation testing and commissioning of total 20 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract (cmc) for 3 years
Read moreConstruction of a shed for compost finishing and bagging section, compost storage section and development of a sanitary landfill site under sbm 2.0 at devrukh nagar panchayat solid waste processing center
Construction of a shed for compost finishing and bagging section, compost storage section and development of a sanitary landfill site under sbm 2.0 at devrukh nagar panchayat solid waste processing center
Read moreSelection of contractor to implement integrated swm services on o/m basis of upsida i.a. panki site-5, knp on qcbs basis for a minimum period of 3 years and thereafter can be extended for 2 years (1 year at a time on mutual agreement basis
Selection of contractor to implement integrated swm services on o/m basis of upsida i.a. panki site-5, knp on qcbs basis for a minimum period of 3 years and thereafter can be extended for 2 years (1 year at a time on mutual agreement basis
Read moreSelection of contractor to implement integrated swm services on o/m basis of upsida i.a. panki site-1, knp on qcbs basis for a minimum period of 3 years and thereafter can be extended for 2 years (1 year at a time on mutual agreement basis
Selection of contractor to implement integrated swm services on o/m basis of upsida i.a. panki site-1, knp on qcbs basis for a minimum period of 3 years and thereafter can be extended for 2 years (1 year at a time on mutual agreement basis
Read moreM/o of stp ( two year repair and maintenance work of various capacity non clog sewage submersible pump set, tpmo, transformer, ht and lt armoured cables and other allied wall at connected and open ugr in stp -50 compound) noida
M/o of stp ( two year repair and maintenance work of various capacity non clog sewage submersible pump set, tpmo, transformer, ht and lt armoured cables and other allied wall at connected and open ugr in stp -50 compound) noida