Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Upgradation Of Ludhiana Rahon Mdr 54 Under Crif Scheme 2023 24 Length 11.43 Km
|
| Description |
Upgradation Of Ludhiana Rahon Road Mdr 54 Under Crif Scheme 2023 24 Length 11.43 Km
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_MoRTH_776233_1 |
|
Reference Number |
Bid No. 23 Dated 09.10.2023 |
| Tender Fee | 20000 |
| EMD | 83.69 Lakh |
| Tender Value | |
| Place | Executive Engineer Provincial Division, Ludhiana |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | October 13, 2023 22:00 |
| End Date |
Expired
04/11/2023
Expired 963 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Upgradation improvement of dkhiah sutnga saipung pala upto semmasi road from 30.100 km to 58.10 km l 28.00 km under mlcip funded by the world bank
Upgradation improvement of dkhiah sutnga saipung pala upto semmasi road from 30.100 km to 58.10 km l 28.00 km under mlcip funded by the world bank
Read moreTender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Tender for constr impvt of extng rd sktt cl 9 to nhdl specn fm extng km 40pt00 to km 70pt00 design chainage km 40pt00 to km 68pt40 net length 28pt40 km on epc mode under pjt dpk in hp
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConstr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh
Constr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read more10/2023-24 dt. 15.06.2023
Upgradation work of garhakota jhagri kenkra sevas kanmad road length-15.50 km under crif scheme
Read moreUpgradation of amritsar majitha fatehgarh churian road mdr 64 under crif scheme 2022-23
Upgradation of amritsar majitha fatehgarh churian road mdr 64 under crif scheme 2022-23
Read more10/2023-24 dt.15.06.2023
Upgradation work of garhakota baleh road balance length of garhakota udaipur blaleh length 14.50 km under crif scheme
Read moreUpgradation of ab road to harsola-datoda upto khandwa road under crif scheme (epc method) length 16.16 km. i/c electrification work
Upgradation of ab road to harsola-datoda upto khandwa road under crif scheme (epc method) length 16.16 km. i/c electrification work
Read moreof your Industry type