Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mmnppna 23 24 263 (I) Construction Of Road Including Covered Drain At Ajachak Pally Remaining Last Portion In Ward No. 1,(Ii)construction Of Hard Paved Shoulder From Old Hospital Point To Bata Point In Hailakandi Town In Ward No. 12,(Iii)construction
|
| Description |
Mmnppna 23 24 263 (I) Construction Of Road Including Covered Drain At Ajachak Pally Remaining Last Portion In Ward No. 1,(Ii)construction Of Hard Paved Shoulder From Old Hospital Point To Bata Point In Hailakandi Town In Ward No. 12,(Iii)construction
|
| Organisation | Government of Assam |
| Tender Id | 2023_PWD_33789_15 |
|
Reference Number |
CE/DEV/TB/08/2023-24/34 |
| Tender Fee | 3370 |
| EMD | 3.37 Lakh |
| Tender Value | - |
| Place | O/o the Chief Engineer Roads, PWRD, Assam |
| Link |
View Original Tender Notice
https://assamtenders.gov.in |
| Start Date | November 23, 2023 19:30 |
| End Date |
Expired
30/11/2023
Expired 1046 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mmnppna_24_25_12 (i) construction of road including covered drain at ajachak pally remaining last portion in ward no. 1,(ii)construction of hard paved shoulder from old hospital point to bata point in hailakandi town in ward no. 12,(iii)construction
Mmnppna_24_25_12 (i) construction of road including covered drain at ajachak pally remaining last portion in ward no. 1,(ii)construction of hard paved shoulder from old hospital point to bata point in hailakandi town in ward no. 12,(iii)construction
Read moreSopd_g_23_24_24 strengthening andimprovement of i) silchar hailakandi road, ii) road from old hospital point to byepass, iii) hailakandi ratanpur road, (iv) road from lakhirbond to bowerghat, (v) circuit house road, (vi) road from bata point to
Sopd_g_23_24_24 strengthening andimprovement of i) silchar hailakandi road, ii) road from old hospital point to byepass, iii) hailakandi ratanpur road, (iv) road from lakhirbond to bowerghat, (v) circuit house road, (vi) road from bata point to
Read moreMmnppna_23_24_112 (i) construction of both side guard wall of longaikhal- starting from apanjan pally to silchar hailakandi road at c.r. avenue statue point via mahanambrata sarani, (ii) improvement of madan mohan road including rcc drains both sides
Mmnppna_23_24_112 (i) construction of both side guard wall of longaikhal- starting from apanjan pally to silchar hailakandi road at c.r. avenue statue point via mahanambrata sarani, (ii) improvement of madan mohan road including rcc drains both sides
Read moreConsultancy services for obtaining forest approval from forest department for up-gradation to 2 lane with paved shoulder from neechli oden at km 88.800 to bhatewar at km 142.028 of nh-162e remaining work
Consultancy services for obtaining forest approval from forest department for up-gradation to 2 lane with paved shoulder from neechli oden (nathdwara) at design km 88.800 to bhatewar at design km 142.028 of nh-162e remaining work
Read moreRemoval of at-grade junction at maker bypass fork cross point towards maker bazaar on 2-laning with paved shoulder of chhapra rewaghat muzaffarpur section of nh 102 (new nh-722) in the state of bihar.
Removal of at-grade junction at maker bypass fork cross point towards maker bazaar on 2-laning with paved shoulder of chhapra rewaghat muzaffarpur section of nh 102 (new nh-722) in the state of bihar.
Read moreConstruction of vup at sonho (junction point of sh 73 and nh 722) on 2-laning with paved shoulder of chhapra - rewaghat -muzaffarpur section of nh 102 (new nh -722) in the state of bihar on epc mode.
Construction of vup at sonho (junction point of sh 73 and nh 722) on 2-laning with paved shoulder of chhapra - rewaghat -muzaffarpur section of nh 102 (new nh -722) in the state of bihar on epc mode.
Read moreImprovement and widening to two laning with paved shoulder of nh 127b from km. 0.000 (end point of dhubri-phulbari bridge) to km 31.500 in the state of meghalaya on epc basis through jica oda loan phase-vii (pkg-1)
Improvement and widening to two laning with paved shoulder of nh 127b from km. 0.000 (end point of dhubri-phulbari bridge) to km 31.500 in the state of meghalaya on epc basis through jica oda loan phase-vii (pkg-1)
Read moreImprovement and widening to two laning with paved shoulder of nh 127b from km. 0.000 (end point of dhubri-phulbari bridge) to km 31.500 in the state of meghalaya on epc basis through jica oda loan phase-vii (pkg-1)
Improvement and widening to two laning with paved shoulder of nh 127b from km. 0.000 (end point of dhubri-phulbari bridge) to km 31.500 in the state of meghalaya on epc basis through jica oda loan phase-vii (pkg-1)
Read moreRemoval of at-grade junction at maker bypass fork cross point towards maker bazaar on 2-laning with paved shoulder of chhapra-rewaghat- muzaffarpur section of nh 102 (new nh -722) in the state of bihar on epc mode 2nd call.
Removal of at-grade junction at maker bypass fork cross point towards maker bazaar on 2-laning with paved shoulder of chhapra-rewaghat- muzaffarpur section of nh 102 (new nh -722) in the state of bihar on epc mode 2nd call.
Read moreof your Industry type