Tender Details

Particulars Details
Title
Increasing Capacity For Power Transformer Of 33,11 Kv S.S. Goithaha, Replacement Of 33 Vcb, Replacement Of Component In Different 33,11 Kv S.S. Interlinking Of 33 Kv Line In Switchyard, Replacement Of Earth Strip And Construction Of Earth Pit
Description
Increasing Capacity For Power Transformer Of 33,11 Kv S.S. Goithaha, Replacement Of 33 Vcb, Replacement Of Component In Different 33,11 Kv S.S. Interlinking Of 33 Kv Line In Switchyard, Replacement Of Earth Strip And Construction Of Earth Pit
Organisation Purvanchal Vidyut Vitran Nigam Limited Varanasi | State Govt. and UT
Tender Id 2024_PVVNV_919719_1
Reference
Number
87/UEDC-II(V)/2023-24
Tender Fee 3835
EMD 12000
Tender Value
Place UEDD-V/VI, VARANASI
Link
View Original Tender Notice

https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1588983

Start Date March 21, 2024 20:40
End Date
Expired 02/04/2024

Expired 818 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Increasing capacity of power transformer at sikandara sub station and construction of 33 kv line

Increasing capacity of power transformer at sikandara sub station and construction of 33 kv line

Read more
Supply of materials for construction of 33kv line and erection work, increasing capacity of power t/f installed at various sub-stations, repairing and replacement of 33 kv switchyard equipments, strengthening of 33 kv line etc. under edc pratapgar

Supply of materials for construction of 33kv line and erection work, increasing capacity of power t/f installed at various sub-stations, repairing and replacement of 33 kv switchyard equipments, strengthening of 33 kv line etc. under edc pratapgar

Read more
Supply of materials for construction of 33kv line and erection work, increasing capacity of power t/f installed at various sub-stations, repairing and replacement of 33 kv switchyard equipments, strengthening of 33 kv line etc. under edc fatehpur

Supply of materials for construction of 33kv line and erection work, increasing capacity of power t/f installed at various sub-stations, repairing and replacement of 33 kv switchyard equipments, strengthening of 33 kv line etc. under edc fatehpur

Read more
Work proposed 11 0.4 kv distribution transformer increasing capacity, 33 kv vcb work, switch yard work and strengthening work of 33 kv line work

Work proposed 11 0.4 kv distribution transformer increasing capacity, 33 kv vcb work, switch yard work and strengthening work of 33 kv line work

Read more
Erection of 33 kv line

Erection of 21km 33kv interlinking line from upper sileru power house(generation station) switchyard to 33/11kv dharakonda ss and to provide alternate supply to 33kv narsipatnam-chintapalli feeder in operation section chintapalli of operation sub-division chintapalli in operation division paderu of a.s.r district

Read more
Supply of de-centralized materials and work for increasing capacity power transformer, increasing capacity 11/0.4 kv substation, installation of 11/0.4 kv substation,replacement of damaged 33/ 11 kv line mirzapur in additional b.p 24-25 edd-ii mzp

Supply of de-centralized materials and work for increasing capacity power transformer, increasing capacity 11/0.4 kv substation, installation of 11/0.4 kv substation,replacement of damaged 33/ 11 kv line mirzapur in additional b.p 24-25 edd-ii mzp

Read more
Supply of materials for construction of 33 kv line, increasing capacity of power t/f installed at various sub-stations, repairing and replacement of 33 kv switchyard equipments etc. and installation of batter and battery charger under edc pratapgarh

Supply of materials for construction of 33 kv line, increasing capacity of power t/f installed at various sub-stations, repairing and replacement of 33 kv switchyard equipments etc. and installation of batter and battery charger under edc pratapgarh

Read more
33/2023-24/edcr increasing load capacity of overloaded transformer replacement of vcb jarjar wire construction of line under business plan, edd-milak, rampur.

33/2023-24/edcr increasing load capacity of overloaded transformer, replacement of vcb, jarjar wire construction of line under business plan, edd-milak, rampur.

Read more
Supply of materials for construction of 33 kv line, increasing capacity of power t/f installed at various sub-stations, repairing and replacement of 33 kv switchyard equipments etc. and installation of batter and battery charger under edc-ii, praya

Supply of materials for construction of 33 kv line, increasing capacity of power t/f installed at various sub-stations, repairing and replacement of 33 kv switchyard equipments etc. and installation of batter and battery charger under edc-ii, praya

Read more
survey installation testing and commissioning of 33kv line 33 by11kv different capacity additional ptrs 33 kv and 11 kv additional bay 11 kv line 11by0.433 kv distribution transformer and lt line under different schemes in onm circle panna

survey installation testing and commissioning of 33kv line 33 by11kv different capacity additional ptrs 33 kv and 11 kv additional bay 11 kv line 11by0.433 kv distribution transformer and lt line under different schemes in onm circle panna

Read more
Click Here to Download Dockets
of your Industry type