Tender Details
Particulars | Details |
---|---|
Title |
Ee/Pmgsy/Bul Adb 06/2023 24
|
Description |
Upgradation Of 1.Mdr 37 To Sathegaon 2.Sh 222 To Ratali Tq. Sindkhed Raja 3.Mdr 35 To Pimpalgaon Chilamkha 4.Sh 51 To Mankhed Road Tq. Deulgaon Raja
|
Organisation | Government of Maharashtra |
Tender Id | 2023_MMGSY_924434_3 |
Reference Number |
SE/BUL/ADB/NIT-36/2023-24 |
Tender Fee | 29500 |
EMD | 10.37 Lakh |
Tender Value | 1 |
Place | SE Office Amravati |
Link | https://mahatenders.gov.in |
Start Date | July 15, 2023 16:30 |
End Date |
26/07/2023 ( Expired 666 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreRehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreConstrcution of 200 feet wide concrete road from malerkotla road to sidhwan canal lohara bridge missing link 2 part c, ludhiana. including civil, public health, horticulture and electrical works including 05 years 1 plus 4 maintenance.
Constrcution of 200 feet wide concrete road from malerkotla road to sidhwan canal lohara bridge missing link 2 part c, ludhiana. including civil, public health, horticulture and electrical works including 05 years 1 plus 4 maintenance.
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreConstruction of rob (between com and gnd stations) at railway from km. 162/2 to 163/3 on jp-rgs section bypass road work near chomu mahla road from km. 0/000 to km. 4/100 etc. on epc mode
Construction of rob (between com and gnd stations) at railway from km. 162/2 to 163/3 on jp-rgs section bypass road work near chomu mahla road from km. 0/000 to km. 4/100 etc. on epc mode
Read moreConstruction of bituminous layer over pcc road from phase 3 e1 to phase 4 a-1-1 balidih industrial area jiada.
Construction of bituminous layer over pcc road from phase 3 e1 to phase 4 a-1-1 balidih industrial area jiada.
Read morePr of the road from pwd road at ujan dudpur to pwd road at ujan dudpur via biplab chakraborty house total length 2 00 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km to ch 1 00 km
Pr of the road from pwd road at ujan dudpur to pwd road at ujan dudpur via biplab chakraborty house total length 2 00 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km to ch 1 00 km
Read moreMtc of the road from kk road at natingcherra to halambasti via atharomuri under south unakoti v c total length 3 553 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km ch 1 78 km
Mtc of the road from kk road at natingcherra to halambasti via atharomuri under south unakoti v c total length 3 553 km during the year 2025 26 sh patch gsb patch metalling grouting carpeting etc from ch 0 00 km ch 1 78 km
Read morePeriodical repair of the road from aa road to darchawi market total length 2 50 km during the year 2025 26 sh patch soling patch metalling grouting carpeting etc from ch 1 50 km to ch 2 45 km
Periodical repair of the road from aa road to darchawi market total length 2 50 km during the year 2025 26 sh patch soling patch metalling grouting carpeting etc from ch 1 50 km to ch 2 45 km
Read moreImprovement of road from palku to sirduk (hrangkhawl para) via 1 no songtang, 2 no songtang and 3 no songtang under ridf xxx of nabard. (job no. tp/com/223/2024-25)
Improvement of road from palku to sirduk (hrangkhawl para) via 1 no songtang, 2 no songtang and 3 no songtang under ridf xxx of nabard. (job no. tp/com/223/2024-25)
Read moreof your Industry type