Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Removal Of Residual Crude Mixed Earth Inside The Dyke Area From Pt 01 And Pt 03 At Phbpl Paradip
|
| Description |
Removal Of Residual Crude Mixed Earth Inside The Dyke Area From Pt 01 And Pt 03 At Phbpl Paradip
|
| Organisation | Indian Oil Corporation Limited | Central Govt. Ministry/Department |
| Tender Id | 2023_IOCL_739224_1 |
|
Reference Number |
SERPL/PHBPL/OPS/2023/02 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | PHBPL Paradip |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1042180 |
| Start Date | December 26, 2023 16:30 |
| End Date |
Expired
08/01/2024
Expired 1012 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tender for collection of the debris, mixed earth, garbage, dry wet waste from inside chennai port premises and disposal at outside port premises
Tender for collection of the debris, mixed earth, garbage, dry wet waste from inside chennai port premises and disposal at outside port premises
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreExternal painting of crude oil storage tanks at phbpl paradip
External painting of crude oil storage tanks at phbpl paradip
Read moreSupply of rtg sets for crude oil tanks at phbpl paradip including supervision of installation and commissioning.
Ref. enquiry cum offer, boq, technical specifications, instrument datasheet and bill of materials.
Read moreMajor repair, maintenance and strengthening of dyke area of crude oil tanks at paradip, odisha
Major repair, maintenance and strengthening of dyke area of crude oil tanks at paradip, odisha
Read moreAnnual maintenance contract (amc) of rim seal system of 5 tanks (pt-16 to pt-20) at phbpl paradip
Annual maintenance contract (amc) of rim seal system of 5 tanks (pt-16 to pt-20) at phbpl paradip
Read moreRemoval of mill reject material mixed with or without earth from
Removal of mill reject material mixed with or without earth fromstage-iii project area
Read moreMtps i civil circle up keeping of ash dyke by removal of weeds and bushes and cleaning jungles on the bund top and attending allied works inside the dykes and up keeping of toilets in the sangilimuniappan kovil gate, silo gate and view point
Mtps i civil circle up keeping of ash dyke by removal of weeds and bushes and cleaning jungles on the bund top and attending allied works inside the dykes and up keeping of toilets in the sangilimuniappan kovil gate, silo gate and view point
Read moreMtps i civil circle up keeping of ash dyke by removal of weeds and bushes and cleaning jungles on the bund top and attending allied works inside the dykes and up keeping of toilets in the sangilimuniappan kovil gate, silo gate and view point
Mtps i civil circle up keeping of ash dyke by removal of weeds and bushes and cleaning jungles on the bund top and attending allied works inside the dykes and up keeping of toilets in the sangilimuniappan kovil gate, silo gate and view point
Read moreof your Industry type