Tender Details

Particulars Details
Title
Removal Of Residual Crude Mixed Earth Inside The Dyke Area From Pt 01 And Pt 03 At Phbpl Paradip
Description
Removal Of Residual Crude Mixed Earth Inside The Dyke Area From Pt 01 And Pt 03 At Phbpl Paradip
Organisation Indian Oil Corporation Limited | Central Govt. Ministry/Department
Tender Id 2023_IOCL_739224_1
Reference
Number
SERPL/PHBPL/OPS/2023/02
Tender Fee 0
EMD 0
Tender Value -
Place PHBPL Paradip
Link
View Original Tender Notice

https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1042180

Start Date December 26, 2023 16:30
End Date
Expired 08/01/2024

Expired 1012 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Tender for collection of the debris, mixed earth, garbage, dry wet waste from inside chennai port premises and disposal at outside port premises

Tender for collection of the debris, mixed earth, garbage, dry wet waste from inside chennai port premises and disposal at outside port premises

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
External painting of crude oil storage tanks at phbpl paradip

External painting of crude oil storage tanks at phbpl paradip

Read more
Supply of rtg sets for crude oil tanks at phbpl paradip including supervision of installation and commissioning.

Ref. enquiry cum offer, boq, technical specifications, instrument datasheet and bill of materials.

Read more
Major repair, maintenance and strengthening of dyke area of crude oil tanks at paradip, odisha

Major repair, maintenance and strengthening of dyke area of crude oil tanks at paradip, odisha

Read more
Annual maintenance contract (amc) of rim seal system of 5 tanks (pt-16 to pt-20) at phbpl paradip

Annual maintenance contract (amc) of rim seal system of 5 tanks (pt-16 to pt-20) at phbpl paradip&#x0d

Read more
Removal of mill reject material mixed with or without earth from

Removal of mill reject material mixed with or without earth fromstage-iii project area

Read more
Mtps i civil circle up keeping of ash dyke by removal of weeds and bushes and cleaning jungles on the bund top and attending allied works inside the dykes and up keeping of toilets in the sangilimuniappan kovil gate, silo gate and view point

Mtps i civil circle up keeping of ash dyke by removal of weeds and bushes and cleaning jungles on the bund top and attending allied works inside the dykes and up keeping of toilets in the sangilimuniappan kovil gate, silo gate and view point

Read more
Mtps i civil circle up keeping of ash dyke by removal of weeds and bushes and cleaning jungles on the bund top and attending allied works inside the dykes and up keeping of toilets in the sangilimuniappan kovil gate, silo gate and view point

Mtps i civil circle up keeping of ash dyke by removal of weeds and bushes and cleaning jungles on the bund top and attending allied works inside the dykes and up keeping of toilets in the sangilimuniappan kovil gate, silo gate and view point

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise