Tender Details

Particulars Details
Title
Tender For Collection Of The Debris, Mixed Earth, Garbage, Dry Wet Waste From Inside Chennai Port Premises And Disposal At Outside Port Premises
Description
Tender For Collection Of The Debris, Mixed Earth, Garbage, Dry Wet Waste From Inside Chennai Port Premises And Disposal At Outside Port Premises
Organisation Chennai Port Trust | Engineering Department,ChPT | MDO,Engg. Dept.,ChPT
Tender Id Login to view
Reference
Number
Login to view
Tender Fee -
EMD 13.62 Lakh
Tender Value 6.81 Crore
Place
Link Login to view
Start Date October 15, 2026 00:15
End Date
Open 03/11/2026

19 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of mrf plant (dry waste prpcessing), wet/mixed waste composting plant, common facilities and insfrastructure

Construction of mrf plant (dry waste prpcessing), wet/mixed waste composting plant, common facilities and insfrastructure

Read more
Plant machinery machine and equipment for mrf plant (dry waste prpcessing), wet/mixed waste composting plant, common facilities and insfrastructure specification atteched as per dpr

Plant machinery machine and equipment for mrf plant (dry waste prpcessing), wet/mixed waste composting plant, common facilities and insfrastructure specification atteched as per dpr

Read more
Running and maintenance work of plumbing and water supply in office building guest house security barrack and inside premises and painting of inside outside premises and flowering pot at mcl bhubaneswar for a period of two years

Running and maintenance work of plumbing and water supply in office building guest house security barrack and inside premises and painting of inside outside premises and flowering pot at mcl bhubaneswar for a period of two years

Read more
Request for proposal (rfp) for processing and disposal of the accumulated wet waste and accumulated dry waste at tirumala through bio-remediation and bio-mining as is where is basis

Request for proposal (rfp) for processing and disposal of the accumulated wet waste and accumulated dry waste at tirumala through bio-remediation and bio-mining as is where is basis

Read more
Cutting of grass, pruning of trees, shrub, bushes upto boundary including clearing the dry grass outside md land and filling of earth in both side of low lying area of runway at shibpur under (s) diglipur

Cutting of grass, pruning of trees, shrub, bushes upto boundary including clearing the dry grass outside md land and filling of earth in both side of low lying area of runway at shibpur under (s) diglipur

Read more
Facility management services - lumpsum based - as per sow & atc job for assistance/ breakdown maintenance of lifts situated inside and outside the plant premises as per sow & atc consumables to be provided by service provider (inclusive in contract..

Facility management services - lumpsum based - as per sow & atc job for assistance/ breakdown maintenance of lifts situated inside and outside the plant premises as per sow & atc consumables to be provided by service provider (inclusive in contract..

Read more
Annual clearance of road berm upto premix top level, removing of un-wanted excavated earth/ wet silt from berm and side drains, deep drains having road length of different carriage way 11km. cleaning of premises around estate civil electrical win

Annual clearance of road berm upto premix top level, removing of unwanted excavated earth wet silt from berm and side drains deep drains having road length of different carriage way 11km cleaning of premises around estate civilelect wi

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
As and as of boundary wall including main gates of wwt(v) premises bldg no p-21 inside naval dockyard, provision of new earth pits at nldc bldg (p-279/280/281), rukmini bldg(p-64), ts-1 bldg(p-01a), ts-ii bldg(p-02b) of transmitting station dolphin

As and as of boundary wall including main gates of wwt(v) premises bldg no p-21 inside naval dockyard, provision of new earth pits at nldc bldg (p-279/280/281), rukmini bldg(p-64), ts-1 bldg(p-01a), ts-ii bldg(p-02b) of transmitting station dolphin

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise