Tender Details

About Tender

๐Ÿ—๏ธ Construction Opportunity: 2 Lane Road Over Bridge (Rob) For Northern Railway ๐Ÿš†๐Ÿ›ฃ๏ธ The Ministry Of Railways, Specifically The Central Government's Northern Railway Division, Is Seeking Bids For The Construction Of A 2 Lane Road Over Bridge (Rob) At Kunda Harnamganj Yard On The Phaphamau Unchahar Section, Lucknow Division. ๐Ÿ“‘ ๐Ÿ“… Bid Submission Deadline: April 06, 2024, 11:30 Am ๐Ÿ’ฒ Earnest Money Deposit (Emd): Inr 24,60,400 This Project Includes The Rob Structure, Approaches, And Rail Portion, As Detailed In The Tender Document. Interested Contractors Must Submit Detailed Bids, Including Financial And Technical Proposals, By The Specified Deadline. Keywords: Construction, Road Over Bridge, Northern Railway, Ministry Of Railways, Government Tender, Earnest Money Deposit, Infrastructure Project, Civil Works
Particulars Details
Title
Construction Of 2 Lane Rob (End To End Including Rly Portion &Amp Approaches) In Lieu Of Lc No. 23 C In Kunda Harnamganj Yard On Phaphamau Unchahar Section Of Lucknow Division On Northern Railway
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 74115075
Reference
Number
2-Tender-CPM-C-BSB
Tender Fee 0
EMD 24.6 Lakh
Tender Value -
Place New Delhi
Link
View Original Tender Notice

https://www.ireps.gov.in/ireps/works/pdfdocs/042024/74115075/viewNitPdf_4509169.pdf

Start Date March 16, 2024 16:15
End Date
Expired 06/04/2024

Expired 922 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.

Construction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.

Read more
Sr (special repair) work providing safety railing on 2-lane rob and its approaches in lieu of existing level crossing (lc no. c-61) at km 165.550 on nh-89 in nagaur city

Sr (special repair) work providing safety railing on 2-lane rob and its approaches in lieu of existing level crossing (lc no. c-61) at km 165.550 on nh-89 in nagaur city

Read more
Vadodara division: construction of road over bridge including approaches in lieu of lc 299 at km 478/32-34 & lc 300 at km 482/6-8 on vadodara-geratpur section.

Vadodara division: construction of road over bridge including approaches in lieu of lc 299 at km 478/32-34 & lc 300 at km 482/6-8 on vadodara-geratpur section.

Read more
Construction of 2 lane rob including approaches in lieu of lc no.29-c at km 47/19-21 between sonik-unnao section in lucknow division on northern railway under dy. ce/c-iv/lucknow on northern railway.

Construction of 2 lane rob including approaches in lieu of lc no.29-c at km 47/19-21 between sonik-unnao section in lucknow division on northern railway under dy. ce/c-iv/lucknow on northern railway.

Read more
Tender for construction of the proposed road over bridge rob at rly. km. 460-13 ,15 in lieu of lc. no. 202 in between kur kpxr stations on kur psa main line along with limited height subway lhs and other allied works.

Tender for construction of the proposed road over bridge rob at rly. km. 460-13 ,15 in lieu of lc. no. 202 in between kur kpxr stations on kur psa main line along with limited height subway lhs and other allied works.

Read more
1) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg lc no.137 at km 457/300-400 by air pushing method between vanjipalaiyam and somanur stations. 2) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg. lc no.141 at km 463/23-25 by air pushing method between somanur and sulur road stations. 3) proposed 1x7.0x3.60m rcc pre-cast box subway in addition to pro. rob in lieu of exg. lc no.142 at km 466/21-23 by air push

1) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg lc no.137 at km 457/300-400 by air pushing method between vanjipalaiyam and somanur stations. 2) proposed 1x3.0x2.75m rcc pre-cast box pedestrian subway in addition to rob in lieu of exg. lc no.141 at km 463/23-25 by air pushing method between somanur and sulur road stations. 3) proposed 1x7.0x3.60m rcc pre-cast box subway in addition to pro. rob in lieu of exg. lc no.142 at km 466/21-23 by air push

Read more
Hyderabad division: sc-dhne section: 1) construction of proposed r.o.b in lieu of lc.no.60 at rly km.114/20-22 between mahabubnagar and manyamkonda stations. 2) proposed construction of 2 lane road over bridge in lieu of lc no.90a at rly km 166/500-600 between wanaprthy road(wpr) - sriram nagar (srnr) 3)proposed construction of 2 lane road over bridge in lieu of lc no 98 at km 186/500 -600 between sriramnagar (srnr)-gadwal (gwd)

Hyderabad division: sc-dhne section: 1) construction of proposed r.o.b in lieu of lc.no.60 at rly km.114/20-22 between mahabubnagar and manyamkonda stations. 2) proposed construction of 2 lane road over bridge in lieu of lc no.90a at rly km 166/500-600 between wanaprthy road(wpr) - sriram nagar (srnr) 3)proposed construction of 2 lane road over bridge in lieu of lc no 98 at km 186/500 -600 between sriramnagar (srnr)-gadwal (gwd)

Read more
S&t work inconnection with provision of 2-lane road over bridge (rob) in lieu of lc no: 116 at km: 933/08-10 between gurla-keshorai patan stations .[2026]

S&t work inconnection with provision of 2-lane road over bridge (rob) in lieu of lc no: 116 at km: 933/08-10 between gurla-keshorai patan stations .[2026]

Read more
Rob/st-34/assam/raha/balance work construction of rob at kakati gaon in replacement of railway lc gate no. st-34 at rly km 104/7-8 on raha kampur road under construction of robs on 50_50 cost sharing basis (balance work)

Rob/st-34/assam/raha/balance work construction of rob at kakati gaon in replacement of railway lc gate no. st-34 at rly km 104/7-8 on raha kampur road under construction of robs on 50_50 cost sharing basis (balance work)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise