Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of 2 Lane Rob (End To End Including Rly Portion &Amp Approaches) In Lieu Of Lc No. 51 B In Janghai Yard On Janghai Bhadohi Section Of Lucknow Division On Northern Railway
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 75677212 |
|
Reference Number |
3-Tender-CPM-C-BSB |
| Tender Fee | 0 |
| EMD | 25.49 Lakh |
| Tender Value | - |
| Place | New Delhi |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/072024/75677212/viewNitPdf_4605656.pdf |
| Start Date | June 15, 2024 16:26 |
| End Date |
Expired
06/07/2024
Expired 834 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.
Construction of road over bridge rob with approaches in lieu of railway crossing no. lc t24 at km. 1.160 at parali on nh361h in the state of maharashtra on epc mode.
Read moreSr (special repair) work providing safety railing on 2-lane rob and its approaches in lieu of existing level crossing (lc no. c-61) at km 165.550 on nh-89 in nagaur city
Sr (special repair) work providing safety railing on 2-lane rob and its approaches in lieu of existing level crossing (lc no. c-61) at km 165.550 on nh-89 in nagaur city
Read moreVadodara division: construction of road over bridge including approaches in lieu of lc 299 at km 478/32-34 & lc 300 at km 482/6-8 on vadodara-geratpur section.
Vadodara division: construction of road over bridge including approaches in lieu of lc 299 at km 478/32-34 & lc 300 at km 482/6-8 on vadodara-geratpur section.
Read moreOhe modification work in connection with provision of new rob in lieu of lc gate no. nn-105 at kamg nunder aden/east/apdj.
Ohe modification work in connection with provision of new rob in lieu of lc gate no. nn-105 at kamg nunder aden/east/apdj.
Read moreTender for construction of the proposed road over bridge rob at rly. km. 460-13 ,15 in lieu of lc. no. 202 in between kur kpxr stations on kur psa main line along with limited height subway lhs and other allied works.
Tender for construction of the proposed road over bridge rob at rly. km. 460-13 ,15 in lieu of lc. no. 202 in between kur kpxr stations on kur psa main line along with limited height subway lhs and other allied works.
Read moreHyderabad division: sc-dhne section: 1) construction of proposed r.o.b in lieu of lc.no.60 at rly km.114/20-22 between mahabubnagar and manyamkonda stations. 2) proposed construction of 2 lane road over bridge in lieu of lc no.90a at rly km 166/500-600 between wanaprthy road(wpr) - sriram nagar (srnr) 3)proposed construction of 2 lane road over bridge in lieu of lc no 98 at km 186/500 -600 between sriramnagar (srnr)-gadwal (gwd)
Hyderabad division: sc-dhne section: 1) construction of proposed r.o.b in lieu of lc.no.60 at rly km.114/20-22 between mahabubnagar and manyamkonda stations. 2) proposed construction of 2 lane road over bridge in lieu of lc no.90a at rly km 166/500-600 between wanaprthy road(wpr) - sriram nagar (srnr) 3)proposed construction of 2 lane road over bridge in lieu of lc no 98 at km 186/500 -600 between sriramnagar (srnr)-gadwal (gwd)
Read moreS&t work inconnection with provision of 2-lane road over bridge (rob) in lieu of lc no: 116 at km: 933/08-10 between gurla-keshorai patan stations .[2026]
S&t work inconnection with provision of 2-lane road over bridge (rob) in lieu of lc no: 116 at km: 933/08-10 between gurla-keshorai patan stations .[2026]
Read moreRob/st-34/assam/raha/balance work construction of rob at kakati gaon in replacement of railway lc gate no. st-34 at rly km 104/7-8 on raha kampur road under construction of robs on 50_50 cost sharing basis (balance work)
Rob/st-34/assam/raha/balance work construction of rob at kakati gaon in replacement of railway lc gate no. st-34 at rly km 104/7-8 on raha kampur road under construction of robs on 50_50 cost sharing basis (balance work)
Read moreCarrying out site survey, geo-technical investigation, preparation of preliminary alignment design and general arrangement drawing (gad) for construction of road over bridge (rob) in lieu of 12 nos. level crossing (lc) gate over konkan railway.
Carrying out site survey, geo-technical investigation, preparation of preliminary alignment design and general arrangement drawing (gad) for construction of road over bridge (rob) in lieu of 12 nos. level crossing (lc) gate over konkan railway.
Read moreConstruction of 4 robs: (i) 2 lane rob on cost sharing basis in lieu of level crossing no. 61-b (including lhs) at km 123/8-9 near mau aimma(mem) station on pratapgarh-phaphamau section of lko division of northern railway, (ii) 2 lane rob in lieu of level crossing no. 59/b (including lhs) on gajarola-muazzampur section of moradabad division of northern railway, (iii) 2 lane rob in lieu of lc no.32/a (including lhs) at k.m. 53.819 between kbe-sln railway station on ayc-sln section of lucknow d
Construction of 4 robs: (i) 2 lane rob on cost sharing basis in lieu of level crossing no. 61-b (including lhs) at km 123/8-9 near mau aimma(mem) station on pratapgarh-phaphamau section of lko division of northern railway, (ii) 2 lane rob in lieu of level crossing no. 59/b (including lhs) on gajarola-muazzampur section of moradabad division of northern railway, (iii) 2 lane rob in lieu of lc no.32/a (including lhs) at k.m. 53.819 between kbe-sln railway station on ayc-sln section of lucknow d
Read moreof your Industry type