Tender Details
Particulars | Details |
---|---|
Title |
C/O. 900 Mm Dia. Culvert Raft Works On Tohogaon Kanhalgaon Dhaba Road, Odr 46, Ch.3/300, 4/400 And 5/300 Km. Taluka Gondpipari
|
Description |
C/O. 900 Mm Dia. Culvert Raft Works On Tohogaon Kanhalgaon Dhaba Road, Odr 46, Ch.3/300, 4/400 And 5/300 Km. Taluka Gondpipari
|
Organisation | Government of Maharashtra |
Tender Id | 2023_CHAND_944255_23 |
Reference Number |
WORKS_ZP_CHANDRAPUR_4_23_24 |
Tender Fee | 2000 |
EMD | 50000 |
Tender Value | |
Place | E E WORKS ZP CHANDRAPUR |
Link | https://mahatenders.gov.in |
Start Date | September 13, 2023 22:30 |
End Date |
21/09/2023 ( Expired 610 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repair maintenance under mmsrry on kotla bassi malot suel road km. 3/0 to 4/0 (2) balghar chatwal landiara road km 0/0 to 1/0 and 3/0 to 4/0 (3) link road from didian to gurala km 0/0 to 2/0 (4) kaler to jambria da gharat km. 0/0 to 1/500 (5) kano
Repair maintenance under mmsrry on kotla bassi malot suel road km. 3/0 to 4/0 (2) balghar chatwal landiara road km 0/0 to 1/0 and 3/0 to 4/0 (3) link road from didian to gurala km 0/0 to 2/0 (4) kaler to jambria da gharat km. 0/0 to 1/500 (5) kano
Read moreRepair and maintenance of damages road and bridges (c/o link road khaltu to saroa to jankhuni km. 0/00 to 1/060) (sub-head f/c work from rd 0/210 to 1/060 and c/o 900mm dia hume pipe culvert at rd 0/180 and 0/600)
Repair and maintenance of damages road and bridges (c/o link road khaltu to saroa to jankhuni km. 0/00 to 1/060) (sub-head f/c work from rd 0/210 to 1/060 and c/o 900mm dia hume pipe culvert at rd 0/180 and 0/600)
Read moreGeneral improvement to meppayyur cheruvannur p a n n i m u k k u a v a l a a n d a p p r o a c h t o g u l i k a p u z h a b r i d g e r o a d b w k m 0 000 4 000 and 6 500 9 400 general civil work general civil work
O r m a t i o n w i d e n i n g s i d e p r o t e c t i o n w o r k a n d&#x0d bm and abcd bc concrete culvert and drainage works road safety&#x0d measures&#x0d
Read moreLaying of trenchless 1000 mm dia np-4 pipe and rcc jacking pipe with ms coller across ring road on drain no. 12 and connection of drain no. 12 and 12a near i.p. metro station under sub division-3 of division c and nd- roads, new delhi. 2nd recall
Laying of trenchless 1000 mm dia np-4 pipe and rcc jacking pipe with ms coller across ring road on drain no. 12 and connection of drain no. 12 and 12a near i.p. metro station under sub division-3 of division c and nd- roads, new delhi. 2nd recall
Read moreConstruction of sakav on msh 4 to tanashi vadade raipada joining to mdr 13 road odr 25 ch 4/00 and 6/250km taluka dahanu district palghar
Construction of sakav on msh 4 to tanashi vadade raipada joining to mdr 13 road odr 25 ch 4/00 and 6/250km taluka dahanu district palghar
Read moreConstruction of semri khurd to itarsi dolariya road, length 4.25 km. 1st call, pac rs. 479.55 lacs on road and bridge works sor 25.03.2022 (ammendment upto date), completion period 300 days i/c rainy season.
Construction of semri khurd to itarsi dolariya road, length 4.25 km. 1st call, pac rs. 479.55 lacs on road and bridge works sor 25.03.2022 (ammendment upto date), completion period 300 days i/c rainy season.
Read moreLaying of trenchless 1000 mm dia np-4 pipe and rcc jacking pipe with ms coller across ring road on drain no. 12 and connection of drain no. 12 and 12a near i.p. metro station under sub division-3 of division c and nd- roads, new delhi. recall
Laying of trenchless 1000 mm dia np-4 pipe and rcc jacking pipe with ms coller across ring road on drain no. 12 and connection of drain no. 12 and 12a near i.p. metro station under sub division-3 of division c and nd- roads, new delhi. recall
Read moreRenewal with ordinary repair work by p.c. on daulatpur link road (vr) in km. 2 (440), 3, 4, 5, 6 (300)
Renewal with ordinary repair work by p.c. on daulatpur link road (vr) in km. 2 (440), 3, 4, 5, 6 (300)
Read moreSub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Sub work for preparation of dpr under main work construction of two lane hlb across manjeera river in between andole, jogipet and ajjamarri village limit at km 3/0 to 3/4 and formation of approach road on either side from km 0/0 to 5/4 of andole to ajjamarri road in sangareddy district
Read moreA/r and m/o on churag to kalti road km. 0/00 to 4/00 (sh providing and laying built up spray grout in km. 2/00 to 3/00) a/r and m/o on chindi bakhras road km. 0/00 to 2/600 (sh providing and laying built up spray grout in km. 0/00 to 1/00)
A/r and m/o on churag to kalti road km. 0/00 to 4/00 (sh providing and laying built up spray grout in km. 2/00 to 3/00) a/r and m/o on chindi bakhras road km. 0/00 to 2/600 (sh providing and laying built up spray grout in km. 0/00 to 1/00)
Read moreof your Industry type