Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
D , Pro , Cons And Commissioning Modernized And Fully Automated Sewage Treatment Plant Of 8 Mld Capacity On Design Build Operate Dbo, Along With 6 Years Of Operation And Maintenance At Powai Abandoned Sewage Pumping Station In S Ward.
|
Description |
D , Pro , Cons And Commissioning&Amp#X0d
Modernized And Fully Automated Sewage Treatment Plant Of&Amp#X0d
8 Mld Capacity On Design Build Operate Dbo, Along With 6 Years Of Operation And Maintenance At Powai Abandoned Sewage Pumping Station In S Ward.
|
Organisation | Municipal Corporation of Greater Mumbai | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 32950 |
EMD | 68.89 Lakh |
Tender Value | |
Place | Powai |
Link |
AAAAAAAAAA Login to view |
Start Date | June 20, 2025 16:30 |
End Date |
27/06/2025 ( 6 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Read moreSstpp khandwa- proposal for installation of effluent treatment plant (etp) of 10 kld capacity including drawing, design, supply, construction, commissioning along with total four years of operation and maintenance (one year free and three years ....
Sstpp khandwa- proposal for installation of effluent treatment plant (etp) of 10 kld capacity including drawing, design, supply, construction, commissioning along with total four years of operation and maintenance (one year free and three years ....
Read moreDesign, engineering, manufacture, supply, delivery, erection, testing and commissioning of odour control system for the existing 46 sewage pumping station including operation and maintenance for the period of 5 years
Design, engineering, manufacture, supply, delivery, erection, testing and commissioning of odour control system for the existing 46 sewage pumping station including operation and maintenance for the period of 5 years
Read moreDesign, build, construct and commission sewage treatment plant (stp) along with co-treatment of faecal sludge-septage in seppa, east kameng district, ap
Design, build, construct and commission sewage treatment plant (stp) along with co-treatment of faecal sludge-septage in seppa, east kameng district, ap
Read moreD-, pro-, cons- and commissioning modernized and fully automated sewage treatment plant of 8 mld capacity on design build operate- dbo, along with 6 years of operation and maintenance at powai abandoned sewage pumping station in s ward.
D-, pro-, cons- and commissioning&#x0d modernized and fully automated sewage treatment plant of&#x0d 8 mld capacity on design build operate- dbo, along with 6 years of operation and maintenance at powai abandoned sewage pumping station in s ward.
Read moreDesign engineering constructing and commissioning of 200mld capacity expandable to 400 mld desalination plant based on sea water reverse osmosis technology and operation and maintenance for 20 years at manori mumbai
Design engineering constructing and commissioning of 200mld capacity expandable to 400 mld desalination plant based on sea water reverse osmosis technology and operation and maintenance for 20 years at manori mumbai
Read moreDesign, construction,supply, installation and commissioning of package type sewage treatment plant (based on mbr technology) within power plant area of bokaro thermal power station on epc basis
Design, construction,supply, installation and commissioning of package type sewage treatment plant (based on mbr technology) within power plant area of bokaro thermal power station on epc basis
Read moreOperation and maintenance of the 35 mld capacity sewage treatment plant at ward-38, benipur chaudry sarai talfi, including all labor, materials, and maintenance work, complete in all respects.
Operation and maintenance of the 35 mld capacity sewage treatment plant at ward-38, benipur chaudry sarai talfi, including all labor, materials, and maintenance work, complete in all respects.
Read moreConstruction, commissioning of faecal sludge treatment plant of capacity 10 kld at latehar town (jharkhand) and operation and maintenance including disludging operations for five years
Construction, commissioning of faecal sludge treatment plant of capacity 10 kld at latehar town (jharkhand) and operation and maintenance including disludging operations for five years
Read moreOperation and maintenance of sewage treatment plant and sewage pumping station at titwala east and titwala west for the period of three years. (2nd call)
Operation and maintenance of sewage treatment plant and sewage pumping station at titwala east and titwala west for the period of three years. (2nd call)
Read moreof your Industry type