Tender Details

Particulars Details
Title
Setting Up Of 200 Mt Construction And Demolition Waste Processing Facility In Municipal Area Of Kanpur Municipal Corporation.
Description
Design, Supply, Construction, Installation And Implementation Of 200 Tpd Construction And Demolition Waste Processing Plant With Operation And Maintenance Of Ten Years Period In Kanpur City (U.P) On Epc Contract Mode.
Organisation Kanpur Municipal Corporation, Kanpur, UP | State Govt. and UT
Tender Id 2023_NNKAN_823325_2
Reference
Number
CANDDPLANT/23-24
Tender Fee 11800
EMD 14 Lakh
Tender Value
Place KANPUR
Link
View Original Tender Notice

https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1557666

Start Date February 24, 2024 00:25
End Date
Expired 05/03/2024

Expired 868 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Appointment of an agency for conceptualizing and conducting heritage walk at brihanmumbai municipal corporation (bmc) headquarters

Appointment of an agency for conceptualizing and conducting heritage walk at brihanmumbai municipal corporation (bmc) headquarters

Read more
Cuddalore corporation - providing / generating / creating 2d / 3d maps using lidar and multi oblique angle 4 oblique plus 1 nadir camera using drone and dgps technology in all 45 wards of cuddalore city municipal corporation

Cuddalore corporation - providing / generating / creating 2d / 3d maps using lidar and multi oblique angle 4 oblique plus 1 nadir camera using drone and dgps technology in all 45 wards of cuddalore city municipal corporation &amp#x0d

Read more
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines

Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.

Read more
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Read more
Construction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808

Construction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808

Read more
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Read more
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Read more
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Setting up of 200mt construction and demolition waste processing facility in municipal area of kanpur nagar nigam.

Setting up of 200mt construction and demolition waste processing facility in municipal area of kanpur nagar nigam.

Read more
Setting up of 200mt construction and demolition waste processing facility in municipal area of kanpur municipal corporation.

Design, supply, construction, installation and implementation of 150tpd construction and demolition waste processing plant with operation and maintenance of ten years period in kanpur city (u.p) on epc contract mode.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise