Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Setting Up Of 200 Mt Construction And Demolition Waste Processing Facility In Municipal Area Of Kanpur Municipal Corporation.
|
| Description |
Design, Supply, Construction, Installation And Implementation Of 200 Tpd Construction And Demolition Waste Processing Plant With Operation And Maintenance Of Ten Years Period In Kanpur City (U.P) On Epc Contract Mode.
|
| Organisation | Kanpur Municipal Corporation, Kanpur, UP | State Govt. and UT |
| Tender Id | 2023_NNKAN_823325_2 |
|
Reference Number |
CANDDPLANT/23-24 |
| Tender Fee | 11800 |
| EMD | 14 Lakh |
| Tender Value | |
| Place | KANPUR |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1557666 |
| Start Date | February 24, 2024 00:25 |
| End Date |
Expired
05/03/2024
Expired 868 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Appointment of an agency for conceptualizing and conducting heritage walk at brihanmumbai municipal corporation (bmc) headquarters
Appointment of an agency for conceptualizing and conducting heritage walk at brihanmumbai municipal corporation (bmc) headquarters
Read moreCuddalore corporation - providing / generating / creating 2d / 3d maps using lidar and multi oblique angle 4 oblique plus 1 nadir camera using drone and dgps technology in all 45 wards of cuddalore city municipal corporation
Cuddalore corporation - providing / generating / creating 2d / 3d maps using lidar and multi oblique angle 4 oblique plus 1 nadir camera using drone and dgps technology in all 45 wards of cuddalore city municipal corporation &#x0d
Read moreProject management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConstruction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808
Construction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreSetting up of 200mt construction and demolition waste processing facility in municipal area of kanpur nagar nigam.
Setting up of 200mt construction and demolition waste processing facility in municipal area of kanpur nagar nigam.
Read moreSetting up of 200mt construction and demolition waste processing facility in municipal area of kanpur municipal corporation.
Design, supply, construction, installation and implementation of 150tpd construction and demolition waste processing plant with operation and maintenance of ten years period in kanpur city (u.p) on epc contract mode.
Read moreof your Industry type