Tender Details

Particulars Details
Title
12(11)/2025/Ae( E ) Ii/I/Hyd/499
Description
Providing Ducting And Exhaust Fan In Ee( E ) I Ii Toilets, At Nirman Bhavan, Koti, Hyderabad.
Organisation Central Public Works Department (CPWD) | Central Govt. Ministry/Department
Tender Id 104822
Reference
Number
12(11)/2025/AE( E )-II/I/HYD/499
Tender Fee 0
EMD 0
Tender Value
Place
Link https://etender.cpwd.gov.in/cppcpwdtenderview.html?tid=63707764246370776424313034383232243132283131292f323032352f414528204520292d49492f492f4859442f343939
Start Date March 01, 2025 23:03
End Date

11/03/2025 ( Expired 90 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Repair to bituminous roads and road furniture in technical and domestic area at dappar under age i dappar

Repair to bituminous roads and road furniture in technical and domestic area at dappar under age i dappar

Read more
Lot ii package hydromechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir

Lot ii package hydro mechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir, india

Read more

Daily operation of pumps for filling water to ug and oh reservoirs,&amp#x0d pumping out water from the basement and other allied works at&amp#x0d vidyut bhavan for two years (2025-2027)

Read more
Structural rehabilitation work and improvement of reservoir, dam, outlet and basic facilities of myntdu leshka stage-i dam in west jaintia hills district of meghalaya under drip-ii (package-viii)

Structural rehabilitation work and improvement of reservoir, dam, outlet and &amp#x0d basic facilities of myntdu leshka stage-i dam in west jaintia hills district of &amp#x0d meghalaya under drip-ii (package-viii)

Read more
A/r and m.o to residential builiding under division no-3 at nabha estate shimla (sh -providing and fixing cupboard, pvc flooring,wall and floor tiles , painting and distempering etc in no. b-3-10 at nabha estate shimla )

A/r and m.o to residential builiding under division no-3 at nabha estate shimla&amp#x0d (sh -providing and fixing cupboard, pvc flooring,wall and floor tiles , painting and distempering etc in no. b-3-10 at nabha estate shimla )&amp#x0d

Read more
Repair/ improvement of ext w/s pipeline, valves, nrv, cleaning/sanitization of ug/oh water reservoir, ug sumps incl tee section, bends , elbow and connected items in nofra, navy nagar, chunabhatti, rmsf and residential area under age e/m-ii karanja

Repair/ improvement of ext w/s pipeline, valves, nrv, cleaning/sanitization of ug/oh water reservoir, ug sumps incl tee section, bends , elbow and connected items in nofra, navy nagar, chunabhatti, rmsf and residential area under age e/m-ii karanja

Read more

Ward 03 kashipur road se conncet guddu ke bhavan se choti lalor ralve fatak tak vesh and cc road and nali nirman work.

Read more
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla

Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla

Read more
Sampling work to be carried our at sp i sp ii tcp and truck dispatch by the geology and quality control deptt at biom kirandul complex dantewada cg

Sampling work to be carried our at sp i sp ii tcp and truck dispatch by the geology and quality control deptt at biom kirandul complex dantewada cg

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise