Tender Details
Particulars | Details |
---|---|
Title |
Structural Rehabilitation Work And Improvement Of Reservoir, Dam, Outlet And Basic Facilities Of Myntdu Leshka Stage I Dam In West Jaintia Hills District Of Meghalaya Under Drip Ii (Package Viii)
|
Description |
Structural Rehabilitation Work And Improvement Of Reservoir, Dam, Outlet And &Amp#X0d
Basic Facilities Of Myntdu Leshka Stage I Dam In West Jaintia Hills District Of &Amp#X0d
Meghalaya Under Drip Ii (Package Viii)
|
Organisation | Meghalaya Power Generation Corporation Limited - World Bank Tenders | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 5000 |
EMD | 9.37 Lakh |
Tender Value | |
Place | Meghalaya |
Link |
AAAAAAAAAA Login to view |
Start Date | June 23, 2025 15:30 |
End Date |
08/07/2025 ( 30 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Lot-iii electro-mechanical works package of 240 mw (2x120mw) uri-i stage-ii h.e project
Lot-iii electro-mechanical works package of 240 mw (2x120mw) uri-i stage-ii h.e project, baramulla district of ut of j and k, india
Read moreLot ii package hydromechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir
Lot ii package hydro mechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir, india
Read moreStructural rehabilitation work and improvement of reservoir, dam, outlet and basic facilities of myntdu leshka stage-i dam in west jaintia hills district of meghalaya under drip-ii (package-viii)
Structural rehabilitation work and improvement of reservoir, dam, outlet and &#x0d basic facilities of myntdu leshka stage-i dam in west jaintia hills district of &#x0d meghalaya under drip-ii (package-viii)
Read moreLot i package civil works package for 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir
Lot i civil works comprising of hrt including adits, surge shaft including adits, pressure shaft including adits, underground p/h cavern, bus ducts, underground transformer cavern, underground dt gate operation cavern and others as per scope of work.
Read moreImprovement and asphalting work from thal satsiling motor road to rin in constituency didihat of district pithoragarh (stage-2) under the state plan.
Improvement and asphalting work from thal satsiling motor road to rin in constituency didihat of district pithoragarh (stage-2) under the state plan.
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreRehabilitation and improvement of main spillway baigul dam (mechanical works) under drip-ii in udham singh nagar
Rehabilitation and improvement of main spillway baigul dam (mechanical works) under drip-ii in udham singh nagar
Read moreRemaining work on risk and cost of rehabilitation work of mdr, odr vr (non patchable) under package no. rj-02-04-a/ np/plan/2017-18 in alwar district
Remaining work on risk and cost of rehabilitation work of mdr, odr vr (non patchable) under package no. rj-02-04-a/ np/plan/2017-18 in alwar district
Read moreRaising height of barvi dam rehabilitation work providing electrification to all amenities at tondali i and ii and samajmandir mohghar ii -- 2nd call
Raising height of barvi dam rehabilitation work providing electrification to all amenities at tondali i and ii and samajmandir mohghar ii -- 2nd call
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreof your Industry type