Tender Details

Particulars Details
Title
Structural Rehabilitation Work And Improvement Of Reservoir, Dam, Outlet And Basic Facilities Of Myntdu Leshka Stage I Dam In West Jaintia Hills District Of Meghalaya Under Drip Ii (Package Viii)
Description
Structural Rehabilitation Work And Improvement Of Reservoir, Dam, Outlet And &Amp#X0d Basic Facilities Of Myntdu Leshka Stage I Dam In West Jaintia Hills District Of &Amp#X0d Meghalaya Under Drip Ii (Package Viii)
Organisation Meghalaya Power Generation Corporation Limited - World Bank Tenders | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 5000
EMD 9.37 Lakh
Tender Value
Place Meghalaya
Link

AAAAAAAAAA

Login to view
Start Date June 23, 2025 15:30
End Date

08/07/2025 ( 30 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Lot-iii electro-mechanical works package of 240 mw (2x120mw) uri-i stage-ii h.e project

Lot-iii electro-mechanical works package of 240 mw (2x120mw) uri-i stage-ii h.e project, baramulla district of ut of j and k, india

Read more
Lot ii package hydromechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir

Lot ii package hydro mechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir, india

Read more
Structural rehabilitation work and improvement of reservoir, dam, outlet and basic facilities of myntdu leshka stage-i dam in west jaintia hills district of meghalaya under drip-ii (package-viii)

Structural rehabilitation work and improvement of reservoir, dam, outlet and &amp#x0d basic facilities of myntdu leshka stage-i dam in west jaintia hills district of &amp#x0d meghalaya under drip-ii (package-viii)

Read more
Lot i package civil works package for 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir

Lot i civil works comprising of hrt including adits, surge shaft including adits, pressure shaft including adits, underground p/h cavern, bus ducts, underground transformer cavern, underground dt gate operation cavern and others as per scope of work.

Read more
Improvement and asphalting work from thal satsiling motor road to rin in constituency didihat of district pithoragarh (stage-2) under the state plan.

Improvement and asphalting work from thal satsiling motor road to rin in constituency didihat of district pithoragarh (stage-2) under the state plan.

Read more
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.

Read more
Rehabilitation and improvement of main spillway baigul dam (mechanical works) under drip-ii in udham singh nagar

Rehabilitation and improvement of main spillway baigul dam (mechanical works) under drip-ii in udham singh nagar

Read more
Remaining work on risk and cost of rehabilitation work of mdr, odr vr (non patchable) under package no. rj-02-04-a/ np/plan/2017-18 in alwar district

Remaining work on risk and cost of rehabilitation work of mdr, odr vr (non patchable) under package no. rj-02-04-a/ np/plan/2017-18 in alwar district

Read more
Raising height of barvi dam rehabilitation work providing electrification to all amenities at tondali i and ii and samajmandir mohghar ii -- 2nd call

Raising height of barvi dam rehabilitation work providing electrification to all amenities at tondali i and ii and samajmandir mohghar ii -- 2nd call

Read more
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise