Tender Details

Particulars Details
Title
Up Gradation To Two Four Lane With Paved Shoulder Configuration Akabeda To Kasturmeta In Km 65.600 To 70.453 4.760 Km Of Nh 130 D (Part 3)
Description
Up Gradation To Two Four Lane With Paved Shoulder Configuration Akabeda To Kasturmeta In Km 65.600 To 70.453 4.760 Km Of Nh 130 D (Part 3)
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2025_MoRTH_845285_1
Reference
Number
03/CE/NH/TC/44-26/2024 (3rd Call)
Tender Fee 11800
EMD 33.86 Lakh
Tender Value
Place Kasturmeta
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=888587

Start Date January 21, 2025 00:25
End Date
Expired 10/02/2025

Expired 528 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Read more
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Read more
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines

Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.

Read more
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Read more
Up-gradation to two-four lane with paved shoulder configuration akabeda to kasturmeta in km 65.600 to 70.453 - 4.760 km of nh-130d (part-3)

Up-gradation to two-four lane with paved shoulder configuration akabeda to kasturmeta in km 65.600 to 70.453 - 4.760 km of nh-130d (part-3)

Read more
Up-gradation to two/four lane with paved shoulder configuration akabeda to kasturmeta in km 65.600 to 70.453 total 4.760 km of nh-130d (part-3)

Up-gradation to two/four lane with paved shoulder configuration akabeda to kasturmeta in km 65.600 to 70.453 total 4.760 km of nh-130d (part-3)

Read more
Up-gradation to two lane - four lane with paved shoulder configuration of akabeda to kasturmeta in km 65.600 to 70.453 - 4.760 km of nh-130d (part-3)

Up-gradation to two lane - four lane with paved shoulder configuration of akabeda to kasturmeta in km 65.600 to 70.453 - 4.760 km of nh-130d (part-3)

Read more
Up-gradation to two lane-four lane with paved shoulder configuration of gotajamhari to akabeda in km 58.100 to 65.600 - 7.50 km of nh-130d (part-2)

Up-gradation to two lane-four lane with paved shoulder configuration of gotajamhari to akabeda in km 58.100 to 65.600 - 7.50 km of nh-130d (part-2)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise