Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ed/04/Pand G/25 26/03
|
| Description |
Plantation With Gardening At South Side Entrance Gate Of Sarat Sadan, Under H.M.C.
|
| Organisation | MUNICIPAL AFFAIRS DEPARTMENT | State Govt. and UT |
| Tender Id | 2025_MAD_846069_3 |
|
Reference Number |
ED/04/PandG/25-26 |
| Tender Fee | 1500 |
| EMD | 6692 |
| Tender Value | |
| Place | HMC AREA |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1888086 |
| Start Date | May 14, 2025 23:30 |
| End Date |
Expired
31/05/2025
Expired 416 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Plantation and maintenance of plants at maharana pratap khel gaon for 1-year (2026-2027) 2811
Plantation and maintenance of plants at maharana pratap khel gaon for 1-year (2026-2027) 2811
Read moreAnnual maintenance contract of ofc network in durgapur intracity and last mile connectivity in durgapur and other districts of south bengal (excluding kolkata and surrounding) under ertcc
Annual maintenance contract of ofc network in durgapur intracity and last mile connectivity in durgapur and other districts of south bengal (excluding kolkata and surrounding) under ertcc
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreProvision of arboriculture and associated work at certain location at af station arjan singh under ge p af panagarh
Provision of arboriculture and associated work at certain location at af station arjan singh under ge p af panagarh
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreEd/09/pandg/23-24/01
Seating arrangement and planter box for plantation of trees at main entrance in sarat sadan.
Read moreWb-hmc/nit/ed-037/l/2023-24
Electrical beautification of sarat sadan entrance area with led decorative, spot, bollard, post top, flood ,garden lights etc at sarat sadan under howrah municipal corporation.
Read moreConstruction of entrance gate and display board at dakaita south side rehab site under rajmahal area.
Construction of entrance gate and display board at dakaita south side rehab site under rajmahal area.
Read moreWb-hmc/tn/ed/ss/03/23-24/02
Underground drainage system of sarat sadan project office and childrens park within the campus of sarat sadan auditorium under hmc.
Read moreof your Industry type