Tender Details

Particulars Details
Title
Annual Maintenance Plan 1 For The Year 2025 26 On Mohal Soh To Pwd Workshop Km 0/00 To 01/00 (Sh Providing And Laying G Iii And 25 Mm Thick Bitumen Concrete In Km. 0/00 To 1/00 (Otmnp
Description
Annual Maintenance Plan 1 For The Year 2025 26 On Mohal Soh To Pwd Workshop Km 0/00 To 01/00 (Sh Providing And Laying G Iii And 25 Mm Thick Bitumen Concrete In Km. 0/00 To 1/00 (Otmnp
Organisation PWD | State Govt. and UT
Tender Id 2025_PWD_102935_1
Reference
Number
PW/KD/TA/2024-25-15548-57 date 24.03.2025
Tender Fee 500
EMD 22000
Tender Value
Place Bhuntar
Link https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=151119
Start Date March 26, 2025 15:30
End Date

02/04/2025 ( Expired 18 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of road length approx. 2.30 km from innao tiniali to well no. kmc 01 via kumchai eps by providing and laying 80 mm thick interlocking concrete paver block grade m30 with preparation of base course by 100 mm gsb and 150 mm wbm including supply of all materials except cement.

Development of road length approx. 2.30 km from innao tiniali to well no. kmc 01 via kumchai eps by providing and laying 80 mm thick interlocking concrete paver block grade m30 with preparation of base course by 100 mm gsb and 150 mm wbm including supply of all materials except cement.

Read more
Strengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore - villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu

Strengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore-villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu

Read more
Improvement of amarpur rd block road from gate no-1 to gate no-2 (l-0.450 km) under amarpur rd block during the year 2025-26.sh- widening, gsb,wbm-ii, wbm-iii, pmc(paver machine) and road marking and furniture etc

Improvement of amarpur rd block road from gate no-1 to gate no-2 (l-0.450 km) under amarpur rd block during the year 2025-26.sh- widening, gsb,wbm-ii, wbm-iii, pmc(paver machine) and road marking and furniture etc

Read more
A/r and m/o on chamunallah to bagshar road km. 0/00 to 3/350 (sh providing and laying built up spray grout in km. 1/00 to 3/350) and a/r and m/o on special repair on shimla mandi via tattapani road km. 55/500 to 90/00(sh providing and laying built u

A/r and m/o on chamunallah to bagshar road km. 0/00 to 3/350 (sh providing and laying built up spray grout in km. 1/00 to 3/350) and a/r and m/o on special repair on shimla mandi via tattapani road km. 55/500 to 90/00(sh providing and laying built u

Read more
Periodic maintenance of padhar nauhli uperli road (hp0804mdr05630402-03) mdr roads under annual maintenance plan for the year 2025-26.

Providing and laying built-up spray grout, tack coat, bituminous concrete 25 mm thick and thermoplastic strip in km 8/0 to 9/0 and 9/0 to 10/0

Read more
Periodic maintenace of link no ii to officers residential colony in chilgari road km 0/000 to 1/500 under amp 2025-26 rural road in district kangra hp

Sh- providing and laying 25mm thick bitumens concrete laying with paver finisher and hot applied thermoplastic compound in km 1/000 to 1/500

Read more
Mtc. of road from rabindranagar to shibnagar at ch 2.25 km under jampui hill sub-division, pwd(rnb) during the year 2025-26 sh- construction of rcc protection wall, plcing of filter media, back fillinh etc. (length 20.10 mtr).

Mtc. of road from rabindranagar to shibnagar at ch 2.25 km under jampui hill sub-division, pwd(rnb) during the year 2025-26 sh- construction of rcc protection wall, plcing of filter media, back fillinh etc. (length 20.10 mtr).

Read more
Mtc. of kanchanpur-jalabassa road under jampui hill sub-division, pwd(rnb) during the year 2025-26 sh- construction of rcc protection wall, sal piling, laying of filter bed, back filling etc. at ch 3.90 km near santipur pump house (length 18.30 mtr)

Mtc. of kanchanpur-jalabassa road under jampui hill sub-division, pwd(rnb) during the year 2025-26 sh- construction of rcc protection wall, sal piling, laying of filter bed, back filling etc. at ch 3.90 km near santipur pump house (length 18.30 mtr)

Read more
Widening of the road from jalabasa kanchanpur dmc part from ch. 5.655 km to 6.938 km l 1.283 km under damcherra sub division pwd r and b during the year 2025 26 sh excavation, construction of granular sub base, wbm etc.

Widening of the road from jalabasa kanchanpur dmc part from ch. 5.655 km to 6.938 km l 1.283 km under damcherra sub division pwd r and b during the year 2025 26 sh excavation, construction of granular sub base, wbm etc.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise