Tender Details

Particulars Details
Title
Improvement Of Sh Way 47 To Goregaon Sawanga To Mdr Road (Odr37) In Ch 8/700 To 9/700 Tq. Warud 3 Call
Description
Improvement Of Sh Way 47 To Goregaon Sawanga To Mdr Road (Odr37) In Ch 8/700 To 9/700 Tq. Warud 3 Call
Organisation RDD-CEO-AMRAVATI | State Govt. and UT
Tender Id 2023_AMRAV_947717_74
Reference
Number
NO/E-TENDER/ ZP/WD/AMT/NIT10/2CALL/2023-24
Tender Fee 560
EMD 0
Tender Value
Place WARUD
Link https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1758521
Start Date February 14, 2024 16:40
End Date

15/02/2024 ( Expired 456 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik

Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik

Read more
Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand

Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand

Read more
Strengthening road safety works including improvement and routine o and m of delhi-gurgaon section of nh-48 other works along the project highway from km. 14.300 to 42.000 (rao tula ram marg in delhi to kherki dhaula fp in haryana) in delhi haryana

Strengthening road safety works including improvement and routine o and m of delhi-gurgaon section of nh-48 other works along the project highway from km. 14.300 to 42.000 (rao tula ram marg in delhi to kherki dhaula fp in haryana) in delhi haryana

Read more
Construction work of drain and interlocking road in ward 52 mantola meera hussaini from house number 17/50 to house number 17/47, in imli wali gali from house number 18/235 to house number 18/246 dalav ghar mantola, in kue wali gali from house number

Construction work of drain and interlocking road in ward 52 mantola meera hussaini from house number 17/50 to house number 17/47, in imli wali gali from house number 18/235 to house number 18/246 dalav ghar mantola, in kue wali gali from house number

Read more
Consultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km

Consultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km

Read more
Improvement and maintainance of nh-61 to purna aabadi kanadkheda vr-36 road.0/00 to 3/250 tq. purna and dist. parbhani.

Improvement and maintainance of nh-61 to purna aabadi kanadkheda vr-36 road.0/00 to 3/250 tq. purna and dist. parbhani.

Read more
Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode

Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode.

Read more
Repair and maintenance of jalgaon jamod nandura road nh 161h (ch.0.00 to 25.00 in the state of maharashtra. (at risk and cost of contractor)

Repair and maintenance of jalgaon jamod nandura road nh 161h (ch.0.00 to 25.00 in the state of maharashtra. (at risk and cost of contractor)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise