Tender Details
Particulars | Details |
---|---|
Title |
Re Construction Of Lbc 7 Of Champamati Irrigation Project (Major) And R.C.C. Canal Of Choulmari Baragaon Fis At Kamardanga Village Under Contingency Fund
|
Description |
Re Construction Of Lbc 7 Of Champamati Irrigation Project (Major) And R.C.C. Canal Of Choulmari Baragaon Fis At Kamardanga Village Under Contingency Fund
|
Organisation | Bodoland Territorial Council | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 3400 |
EMD | 3.32 Lakh |
Tender Value | |
Place | Sidli |
Link |
AAAAAAAAAA Login to view |
Start Date | May 08, 2025 15:30 |
End Date |
27/05/2025 ( 19 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Protection work to sump well and headwork of supply channel of solar lift irrigation at lalung thasgam (under the lift irrigation scheme of lalung and gontabsa thasgam
Protection work to sump well and headwork of supply channel of solar lift irrigation at lalung thasgam (under the lift irrigation scheme of lalung and gontabsa thasgam
Read moreMaintenance of existing borewell, rain water harvesting pits, installation of new borewells and construction of new rain water harvesting system at mkpr-mvpi (excluding) of line-7, mkd, mksq, mkpr rss, dkv rss, ina rss.
Maintenance of existing borewell, rain water harvesting pits, installation of new borewells and construction of new rain water harvesting system at mkpr-mvpi (excluding) of line-7, mkd, mksq, mkpr rss, dkv rss, ina rss.
Read moreConstruction of railway rob at km. 3.485 along parali bypass road on nh 548b in the state of maharashtra. work under contractors risk and cost.
Construction of railway rob at km. 3.485 along parali bypass on deogaon fata _pathari _sonpeth_parali_ambajogai_renapur fata_latur_omerga road nh 548b in the state of maharashtra. work under contractors risk and cost.
Read moreConstruction of c.c. and bt road balance road work at different ward, amarwara under balance amount of mmas ii
Construction of c.c. and bt road balance road work at different ward, amarwara under balance amount of mmas ii
Read moreConstruction of flood protection wall, rain water harvesting, ramps at 66 kv s/s kulrian under o and m division mansa
Construction of flood protection wall, rain water harvesting, ramps at 66 kv s/s kulrian under o and m division mansa
Read moreWbphed/ee/md/niet_16 of 2025-2026, sl. no. 10
Construction of boundary wall, box culvert approch road and laying of dedicated/ parallel pipeline of tulshihatta zone-ii piped water supply scheme at harishchandrapur-i block of malda district under malda division, phe dte, govt. of west bengal.
Read moreSupply and stacking of stone chips 13.20 mm, stone chips 11.20 mm, stone chips 6.70 mm and sand at km 100 (hmp site) on sairang-tuipuibari road for re-surfacing work approved for fy 2025-26 under 74 rcc/24 brtf of project pushpak in mizoram state
Supply and stacking of stone chips 13.20 mm, stone chips 11.20 mm, stone chips 6.70 mm and sand at km 100 (hmp site) on sairang-tuipuibari road for re-surfacing work approved for fy 2025-26 under 74 rcc/24 brtf of project pushpak in mizoram state
Read moreConstruction of school building including residential quarters a type 24 numbers quarters , b type 12 numbers quarters and c type 04 number quarters at village punwat, tehsil-wani, district yavatmal under wcl, wani area.
Construction of school building including residential quarters a type 24 numbers quarters , b type 12 numbers quarters and c type 04 number quarters at village punwat, tehsil-wani, district yavatmal under wcl, wani area.
Read moreConstruction of one no store stack yard with partly open and partly shed one scrap yard at kakdwip 132 kv substation under behala area office wbsetcl
Construction of one no store stack yard with partly open and partly shed one scrap yard at kakdwip 132 kv substation under behala area office wbsetcl
Read moreDesign and construction of 02 major psc box girder bridges at km 115.300 (dudhar 120 m), km 100.00 (gambhir 100 m), and 01 major steel superstructure bridges at km 97.350 (sedka 60 m) alongwith its approaches, incl collection of hydraulic data, ssi,
Design and construction of 02 major psc box girder bridges at km 115.300 (dudhar 120 m), km 100.00 (gambhir 100 m), and 01 major steel superstructure bridges at km 97.350 (sedka 60 m) alongwith its approaches, incl collection of hydraulic data, ssi,
Read moreof your Industry type