Tender Details
Particulars | Details |
---|---|
Title |
Shifting And I.T.C Of Spared 01 No. 2 X 1.50 Tr High Sensible Ac Units From Iop Room At Auraiya To Ntr Equipment At Dampier Nagar, Mathura And Providing Electrical Works For Renovation Of Inspection Quarter At T.E. Bldg Dampier Nagar, Oa Mathura.
|
Description |
Shifting And I.T.C Of Spared 01 No. 2 X 1.50 Tr High Sensible Ac Units From Iop Room At Auraiya To Ntr Equipment At Dampier Nagar, Mathura And Providing Electrical Works For Renovation Of Inspection Quarter At T.E. Bldg Dampier Nagar, Oa Mathura.
|
Organisation | Central Public Procurement Portal 1 |
Tender Id | 2023_BSNL_777913_1 |
Reference Number |
42/EEE/BSNL/ED/GZB/2023-24 |
Tender Fee | 177 |
EMD | 1326 |
Tender Value | |
Place | Electrical Division, Ghaziabad |
Link | https://eprocure.gov.in |
Start Date | October 25, 2023 23:00 |
End Date |
16/11/2023 ( Expired 552 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Sitc of 9 x 3 tr ductable split ac units in ntr trans room, oa trans room and switch room at tel exchange gonda under ba ayodhya sub head- extension of power supply, distribution box, tpmcbs and closure of air path
Sitc of 9 x 3 tr ductable split ac units in ntr trans room, oa trans room and switch room at tel exchange gonda under ba ayodhya sub head- extension of power supply, distribution box, tpmcbs and closure of air path
Read moreSitc of 4 nos 2.0 tr inverter split ac units at room no 106, renovation ei work networking lan cabling, computer power and allied electrical works for room no 106 and 114 yogayog bhawan, kolkata.
Sitc of 4 nos 2.0 tr inverter split ac units at room no 106, renovation ei work networking lan cabling, computer power and allied electrical works for room no 106 and114 yogayog bhawan, kolkata.
Read moreRepairing of split ac units in ntr equipement at old t.e. bldg mainpuri.
Repairing of split ac units in ntr equipement at old t.e. bldg mainpuri.
Read moreS.i.t.c. of 6x7 tr microprocessor based high precision ac units at 4 g mini data centre t.e. bldg. shastri nagar, meerut. (sh- dismantling of existing life expired package ac units and associated work).
S.i.t.c. of 6x7 tr microprocessor based high precision ac units at 4 g mini data centre t.e. bldg. shastri nagar, meerut. (sh- dismantling of existing life expired package ac units and associated work).
Read moreDismantling, shifting and installation two nos. of 2 x 1.5 tr high sensible split a/c units from second floor switch room in main t.e. bldg. aligarh to main t.e. bldg. hathras.
Dismantling, shifting and installation two nos. of 2 x 1.5 tr high sensible split a/c units from second floor switch room in main t.e. bldg. aligarh to main t.e. bldg. hathras.
Read moreS.i.t.c. of 6 x 7 tr microprocessor based high precision ac units at 4 g mini data centre t.e. bldg. shastri nagar, meerut. (sh- dismantling of existing life expired package ac units and associated work)
S.i.t.c. of 6 x 7 tr microprocessor based high precision ac units at 4 g mini data centre t.e. bldg. shastri nagar, meerut. (sh- dismantling of existing
 life expired package ac units and associated work).
Read moreReplacement of defective evd of 1 no 7.5 tr high precision type ac package units at te bldg circus transmission sw room recovered from central te under area ctd, kolkata
Replacement of defective evd of 1 no 7.5 tr high precision type ac package units at te bldg circus transmission sw room recovered from central te under area ctd, kolkata
Read moreShifting and itc of spared 02 nos. split ac units from cdr room (108) to one network control room (202) at tax bhawan agra and i.t.c of 02 x1.50 tr split ac units in renovation of conference hall at cto compound agra.
Shifting and itc of spared 02 nos. split ac units from cdr room (108) to one
 network control room (202) at tax bhawan agra and i.t.c of 02 x1.50 tr
 split ac units in renovation of conference hall at cto compound agra.
Read moreShifting and i.t.c of spared 01 no. 2 x 1.50 tr high sensible ac units from iop room at auraiya to ntr equipment at dampier nagar, mathura and providing electrical works for renovation of inspection quarter at t.e. bldg dampier nagar, oa mathura.
Shifting and i.t.c of spared 01 no. 2 x 1.50 tr high sensible ac units from iop room at auraiya to ntr equipment at dampier nagar, mathura and providing electrical works for renovation of inspection quarter at t.e. bldg dampier nagar, oa mathura.
Read moreSitc of 3 x 7 tr high precision type package a.c. units in ntr bldg ac plant at t.e. cantt, varanasi. (sh- associated work)
Sitc of 3 x 7 tr high precision type package a.c. units in ntr bldg ac plant at t.e. cantt, varanasi. (sh- associated work)
Read moreof your Industry type