Tender Details

Particulars Details
Title
Wbphed/ Ee/Hd/N Ie T 26 Of 2023 24
Description
Additional Sinking Of 2 (Two) Nos. 250 X 150 Mm Dia And 230 M Deep Tubewell Drilling By Direct Rotary Method With Upvc Pipes All Complete At Balichack Pwss Sm/18885 Of Amta I Block In Uluberia Sub Division, Under Howrah Division P.H.E. Dte.
Organisation PHE | State Govt. and UT
Tender Id 2024_PHED_673461_8
Reference
Number
WBPHED/ EE/HD/NIeT_26 OF 2023-24
Tender Fee 0
EMD 60000
Tender Value
Place HOWRAH
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1463964
Start Date February 23, 2024 23:30
End Date

11/03/2024 ( Expired 429 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Sinking of 23 nos tube well of for each tube well approximate length for housing pipe 300 mm dia length 50 m, well pipe 200 mm dia 60 m, strainer 200 mm dia length 24 m, blank pipe 200 mm dia length 6 m. by direct rotary rig method using upvc pipes

Sinking of 23 nos tube well of for each tube well approximate length for housing pipe 300 mm dia length 50 m, well pipe 200 mm dia 60 m, strainer 200 mm dia length 24 m, blank pipe 200 mm dia length 6 m. by direct rotary rig method using upvc pipes

Read more
Wbphed/ ee/hd/niet-01 of 2025-26

Additional tube well of 250 x 150 mm dia and 230 m deep by direct rotary method with upvc pipes all complete at vill- moyrachack of amta-ii block under uttar dakhin bhatora pwss under uluberia sub-division, under howrah division p.h.e. dte.

Read more
Wbphed/ee/hd/niet-30 of 2024-25

Additional laying of pipeline with interconnection of augmentation of mankur deulgram pwss of bagnan-i block in uluberia sub-division, under howrah division p.h.e. dte.

Read more
Sinking of 23 nos tube well of for each tube well approximate length for housing pipe 300 mm dia length 50 m, well pipe 200 mm dia 60 m, strainer 200 mm dia length 24 m, blank pipe 200 mm dia length 6 m. by direct rotary rig method using upvc pipes

Sinking of 23 nos tube well of for each tube well approximate length for housing pipe 300 mm dia length 50 m, well pipe 200 mm dia 60 m, strainer 200 mm dia length 24 m, blank pipe 200 mm dia length 6 m. by direct rotary rig method using upvc pipes

Read more
Construction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district samba of samba province under jal jeevan mission

Construction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district samba of samba province under jal jeevan mission

Read more
Construction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district samba of samba province under jal jeevan mission

Construction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district samba of samba province under jal jeevan mission

Read more
Sinking of 20 nos tube well of size 300x200 mm dia. and 146 mtr. deep by direct rotary rig method using upvc pipes. boundary wall 40 mtr each with one number gate for each tube well at zone -1,2 and 3 size -(10 x 10) sqm each. pump room as per de

Sinking of 20 nos tube well of size 300x200 mm dia. and 146 mtr. deep by direct rotary rig method using upvc pipes. boundary wall 40 mtr each with one number gate for each tube well at zone -1,2 and 3 size -(10 x 10) sqm each. pump room as per de

Read more
National hydrology project sh drilling of 2 two borewell by direct rotary method for shifting of borewells coming under the alignment of four lane road project from pinjore to swarghat at sandholi and bagbania under hydrology sub division nahan

National hydrology project sh drilling of 2 two borewell by direct rotary method for shifting of borewells coming under the alignment of four lane road project from pinjore to swarghat at sandholi and bagbania under hydrology sub division nahan

Read more
Sinking of one nos 250 x 150 mm dia. x 190 mtr. depth deep tube well by direct rotary method for dumri nekrasuli and its adjoining mouzas pipe water supply scheme within sankrail block under jhargram division, p.h.e. dte.

Sinking of one nos 250 x 150 mm dia. x 190 mtr. depth deep tube well by direct rotary method for dumri nekrasuli and its adjoining mouzas pipe water supply scheme within sankrail block under jhargram division, p.h.e. dte.

Read more
Construction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district jammu of jammu province under jal jeevan mission

Construction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district jammu of jammu province under jal jeevan mission

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise