Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Wbphed/ Ee/Hd/N Ie T 26 Of 2023 24
|
Description |
Additional Sinking Of 2 (Two) Nos. 250 X 150 Mm Dia And 230 M Deep Tubewell Drilling By Direct Rotary Method With Upvc Pipes All Complete At Balichack Pwss Sm/18885 Of Amta I Block In Uluberia Sub Division, Under Howrah Division P.H.E. Dte.
|
Organisation | PHE | State Govt. and UT |
Tender Id | 2024_PHED_673461_8 |
Reference Number |
WBPHED/ EE/HD/NIeT_26 OF 2023-24 |
Tender Fee | 0 |
EMD | 60000 |
Tender Value | |
Place | HOWRAH |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1463964 |
Start Date | February 23, 2024 23:30 |
End Date |
11/03/2024 ( Expired 484 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
1938_bd_niet_11_of_2025-26
Sinking of 1 no. deep tubewell by d.r. rig method at pump house no. - 2 of habra municipal zone -ii water supply scheme within the jurisdiction of habra sub-division, under barasat division, p.h.e. dte.
Read moreWbphed/ ee/hd/niet-06 of 2025-26
Sinking of 1 (one) no. additional t.well size (250 x 150 mm) dia and 240 m deep, drilling by direct rotary method with upvc pipes all complete at haturia kandarpopur pwss of bagnan-i block in uluberia sub-division under howrah division p.h.e. dte.
Read moreWbphed/ee/hd/niet-05 of 2025-26
Construction of boundary wall, approach road at hw site, 2nd, 3rd 4th tw site with laying of pipeline at different places of augmentation paschim khalna pwss of amta-ii block in uluberia sub-division, under howrah division p.h.e. dte.
Read moreSinking of 23 nos tube well of for each tube well approximate length for housing pipe 300 mm dia length 50 m, well pipe 200 mm dia 60 m, strainer 200 mm dia length 24 m, blank pipe 200 mm dia length 6 m. by direct rotary rig method using upvc pipes
Sinking of 23 nos tube well of for each tube well approximate length for housing pipe 300 mm dia length 50 m, well pipe 200 mm dia 60 m, strainer 200 mm dia length 24 m, blank pipe 200 mm dia length 6 m. by direct rotary rig method using upvc pipes
Read moreWbphed/ ee/hd/niet-01 of 2025-26
Additional tube well of 250 x 150 mm dia and 230 m deep by direct rotary method with upvc pipes all complete at vill- moyrachack of amta-ii block under uttar dakhin bhatora pwss under uluberia sub-division, under howrah division p.h.e. dte.
Read moreWbphed/ee/hd/niet-30 of 2024-25
Additional laying of pipeline with interconnection of augmentation of mankur deulgram pwss of bagnan-i block in uluberia sub-division, under howrah division p.h.e. dte.
Read moreSinking of 23 nos tube well of for each tube well approximate length for housing pipe 300 mm dia length 50 m, well pipe 200 mm dia 60 m, strainer 200 mm dia length 24 m, blank pipe 200 mm dia length 6 m. by direct rotary rig method using upvc pipes
Sinking of 23 nos tube well of for each tube well approximate length for housing pipe 300 mm dia length 50 m, well pipe 200 mm dia 60 m, strainer 200 mm dia length 24 m, blank pipe 200 mm dia length 6 m. by direct rotary rig method using upvc pipes
Read moreConstruction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district samba of samba province under jal jeevan mission
Construction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district samba of samba province under jal jeevan mission
Read moreConstruction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district samba of samba province under jal jeevan mission
Construction of 250 mm dia. production tube wells by any suitable method (reverse/direct/dual rotary) using mud-rotary drilling rig for 01 water supply scheme (01 no. tube well) of district samba of samba province under jal jeevan mission
Read moreSinking of 20 nos tube well of size 300x200 mm dia. and 146 mtr. deep by direct rotary rig method using upvc pipes. boundary wall 40 mtr each with one number gate for each tube well at zone -1,2 and 3 size -(10 x 10) sqm each. pump room as per de
Sinking of 20 nos tube well of size 300x200 mm dia. and 146 mtr. deep by direct rotary rig method using upvc pipes. boundary wall 40 mtr each with one number gate for each tube well at zone -1,2 and 3 size -(10 x 10) sqm each. pump room as per de
Read moreof your Industry type