Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Removal Of Existing Gi Sheet Cladding
|
| Description |
Removal Of Existing Gi Sheet Cladding
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_464720_1 |
|
Reference Number |
SE M II O M NCTPS II 80 24 25 |
| Tender Fee | 0 |
| EMD | 6500 |
| Tender Value | - |
| Place | SE MECH II NCTPS II |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=552236 |
| Start Date | July 20, 2024 23:00 |
| End Date |
Expired
29/07/2024
Expired 802 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreDate: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Read moreRemoval of existing gi sheet cladding and lrb wool mattresses
Removal of existing gi sheet cladding and lrb wool mattresses
Read moreOt 59 gi cladding sheet
Removal replacement of wornout damaged dislodged gi cladding sheets and insulation wool mattresses in hfo tanks 1 2 and hsd tank at roof top and hfo bottom top heaters and oil lines at foph area
Read moreChp1 gi cladding sheet iv phase
Mtps-ii-mech-ii - chp-i division - providing gi sheet cladding arrangement (fourth phase) on the northern side of jt-7 to pr the deposit of coal particles emanating from conveyor 3a/b cross over to pch eastern side to the nearby village.
Read moreMtps2 chp1 providing gi sheet cladding arrangementsecond phase
Mtps2 chp1 providing gi sheet cladding arrangement second phase
Read moreMtps2 chp1 providing gi sheet cladding arrangement third phase
Mtps2 chp1 providing gi sheet cladding arrangement third phase
Read moreRemoval of existing structural members, weldmesh partitions, ac sheet weather shed and gi sheet cladding etc. and fixing the same for replacement of power transformer no.2 at kussara rss.
Removal of existing structural members, weldmesh partitions, ac sheet weather shed and gi sheet cladding etc. and fixing the same for replacement of power transformer no.2 at kussara rss.
Read moreof your Industry type