Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Chp1 Gi Cladding Sheet Iv Phase
|
| Description |
Mtps Ii Mech Ii Chp I Division Providing Gi Sheet Cladding Arrangement (Fourth Phase) On The Northern Side Of Jt 7 To Pr The Deposit Of Coal Particles Emanating From Conveyor 3 A/B Cross Over To Pch Eastern Side To The Nearby Village.
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_521471_1 |
|
Reference Number |
OT30/24-25 |
| Tender Fee | 0 |
| EMD | 26000 |
| Tender Value | - |
| Place | MTPS-II / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=620605 |
| Start Date | January 29, 2025 22:30 |
| End Date |
Expired
13/02/2025
Expired 606 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of acp panel and pre-coated gi sheet
Procurement of acp panel and pre-coated gi sheet
Read moreSupply of aluminium sheets for insulation cladding of boiler
Supply of aluminium sheets for insulation cladding of boiler
Read moreShifting of transformer and dg set at state cyber crime bldg phase-iv, sas nagar
Shifting of transformer and dg sets at state cyber crime building at phase-iv s.a.s. nagar
Read moreAmc for four nos lifts (phase-ii) at type-ii and type-iv sf accn at dwarka
Amc for four nos lifts (phase-ii) at type-ii and type-iv sf accn at dwarka
Read moreAmc for statcon make battery chargers installed for dc system of unit-i to iv, 400kv switchyard phase-i and ii, plcc of phase-i and ii and silo area phase-i, ctpp, chhabra.
Amc for statcon make battery chargers installed for dc system of unit-i to iv, 400kv switchyard phase-i and ii, plcc of phase-i and ii and silo area phase-i, ctpp, chhabra.
Read moreDismantling of old chain link fencing and providing compound wall allround kpcl quarters at bhep colony- phase iv
Replacement of damaged chain-link fencing with construction of a compound wall with barbed wire on top along the boundary of bhadra colony for a balance length of 410m.
Read moreRepair replacement of gi di water pipe lines and allied connected works at phase i under ge i r and d west bengaluru
Repair replacement of gi di water pipe lines and allied connected works at phase i under ge i r and d west bengaluru
Read moreProviding and fixing external vitrified floor tiles at ground floor corridor, natural stone flooring at porch, fixing pvc gutter to existing gi sheet roofing sheet and other allied works at aneexe building, cpmg office, trivandrum.
Providing and fixing external vitrified floor tiles at ground floor corridor, natural stone flooring at porch, fixing pvc gutter to existing gi sheet roofing sheet and other allied works at aneexe building, cpmg office, trivandrum.
Read moreSpl repair/ replacement of ac sheet to gi sheet and allied wks in ta-14, ta-15 and ta-19 at mil stn dhana under spl repair wks (bldg) for the financial year 2026-27
Spl repair/ replacement of ac sheet to gi sheet and allied wks in ta-14, ta-15 and ta-19 at mil stn dhana under spl repair wks (bldg) for the financial year 2026-27
Read moreof your Industry type