Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Sr Work Of Sihapar Ghghasara Road Km 3 To Sihapar Eit Bhaththa To Ramjeet Harijan House Link Road In Distt Gorakhpur Fy 2023 24
|
| Description |
Sr Work Of Sihapar Ghghasara Road Km 3 To Sihapar Eit Bhaththa To Ramjeet Harijan House Link Road In Distt Gorakhpur Fy 2023 24
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_CEGKP_858190_55 |
|
Reference Number |
432/5Lekha Date 19.10.2023 |
| Tender Fee | 944 |
| EMD | 2.74 Lakh |
| Tender Value | |
| Place | ee pd pwd Gorakhpur |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | November 02, 2023 14:30 |
| End Date |
Expired
08/11/2023
Expired 965 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Under district sultanpur, construction of interlocking road from surjan purwa link road to hariram prajapati house in bangarkala, karaudikala, lot no 3
Under district sultanpur, construction of interlocking road from surjan purwa link road to hariram prajapati house in bangarkala, karaudikala, lot no 3&#x0d
Read moreConstruction of missing link road from bhojusar upadhiyan to degan km 0/0 to 9/00
Construction of missing link road from bhojusar upadhiyan to degan km 0/0 to 9/00
Read more7) construction of bt road gandher to chacha khedi km 2/0 to 3/00
7) construction of bt road gandher to chacha khedi km 2/0 to 3/00
Read moreWidening and strengthening of pilibhit basti marg (nh 730) km 150 to khamariya link road (bu agri logistic sylo)
Widening and strengthening of pilibhit basti marg (nh 730) km 150 to khamariya link road (bu agri logistic sylo)
Read moreConstruction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road
Construction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreVkm/2025/516,r/o (repair of mrtalling of various road road in thanthewal mohal (sh p/l pach work (bc) in km. 0/000 to 0/260)
Vkm/2025/516,r/o (repair of mrtalling of various road road in thanthewal mohal (sh p/l pach work (bc) in km. 0/000 to 0/260)
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreWork related to operation of completed jjm schemes for maintaining water supply in fy 2025-26 under sub division aburoad,dn aburoad
Work related to operation of completed jjm schemes for maintaining water supply in fy 2025-26 under sub division aburoad,dn aburoad
Read moreRepair work of power channel road from mes bridge to fore bay and link road up to fagpur gate by means of premix carpet and bituminous macadam
Repair work of power channel road from mes bridge to fore bay and link road up to fagpur gate by means of premix carpet and bituminous macadam
Read moreof your Industry type