Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Consultancy Services For Authority Engineer For Supervision Of 2 Lane Paved Shoulder / 4 Laning Of Damoh Jabalpur Section Of Nh 34 In Madhya Pradesh From Damoh (Design Ch.0.000km) To Jabera (Design Ch.43.500) (Pl 43.500 Km) Under Nh(o) On Epc Mode
|
| Description |
Consultancy Services For Authority Engineer For Supervision Of 2 Lane Paved Shoulder / 4 Laning Of Damoh Jabalpur Section Of Nh 34 In Madhya Pradesh From Damoh (Design Ch.0.000km) To Jabera (Design Ch.43.500) (Pl 43.500 Km) Under Nh(o) On Epc Mode
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2025_NHAI_233364_1 |
|
Reference Number |
MPDIV-23012/1/2025 -MP Division (e-279924) |
| Tender Fee | 5000 |
| EMD | 0 |
| Tender Value | - |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=264003 |
| Start Date | April 22, 2025 21:30 |
| End Date |
Expired
20/08/2025
Expired 424 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Engagement of user fee agency through e-tender at aliyapur fee plaza at km. 43.500 of two laning with paved shoulder of kanpur to kabrai section of nh-86 from km.7.430 to km.130.100 in the state of uttar pradesh
Engagement of user fee agency through e-tender at aliyapur fee plaza at km. 43.500 of two laning with paved shoulder of kanpur to kabrai section of nh-86 from km.7.430 to km.130.100 in the state of uttar pradesh
Read moreWidening and strengthening of stretch from hansdiha (design ch 92.380 km) to chopa more (design km 129.370) of nh-133 to 4 lane with paved shoulder in the state of jharkhand under epc mode
Widening and strengthening of stretch from hansdiha (design ch 92.380 km) to chopa more (design km 129.370) of nh-133 to 4 lane with paved shoulder in the state of jharkhand under epc mode
Read moreIndependent engineer services for supervision of (i) 4 - laning of existing 2- lane galgalia-bahadurganj section from design ch. 0.000 to design ch. 49.000 (ii) 4 - laning of existing 2- lane bahadurganj - araria section design ch. 49.000 t
Independent engineer services for supervision of (i) 4 - laning of existing 2- lane galgalia-bahadurganj section from design ch. 0.000 to design ch. 49.000 (ii) 4 - laning of existing 2- lane bahadurganj - araria section design ch. 49.000 t
Read moreWidening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)
Widening and upgradation of existing highway from khagaria (design ch. 270.000) to purnea (design ch. 413.529) section of nh 31 and nh 231 to 4 lane with paved shoulders under nh (o) on bot (toll) in the state of bihar (2 nd call)
Read more4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
Read moreUpgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.
Upgradation to two lane with paved shoulder of porbandar bhanvad jamjodhpur kalavad section of nh-151k from design km 0.000 to design km 119.500 in the state of gujarat on ham.
Read moreSix-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode
Six-laning of vijayawada-machilipatnam section of nh-65 from design ch.4.000 to ch.63.695 (length 59.695 km) in the state of andhra pradesh under hybrid annuity mode
Read moreShort term operation and maintenance for 4 2 laning with paved shoulder of rajganj govindpur chas west bengal border section of nh 32 from km 0.000 to km 56.889 in the state of jharkhand
Short term operation and maintenance for 4 2 laning with paved shoulder of rajganj govindpur chas west bengal border section of nh 32 from km 0.000 to km 56.889 in the state of jharkhand
Read moreO and m including routine maintenance and incident management of 4 laning of existing 2 lane with paved shoulder road from talwandi bhai to ferozepur on nh-05 (old nh-95) from km 170.000 to km 194.040 in the state of punjab.
O and m including routine maintenance and incident management of 4 laning of existing 2 lane with paved shoulder road from talwandi bhai to ferozepur on nh-05 (old nh-95) from km 170.000 to km 194.040 in the state of punjab.
Read moreConstruction of the lonar bypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Construction of the lonarbypass from design km 0.00 to km 5.06 having two lane with paved shoulder configuration on nh 548c in the state of maharashtra on epc mode
Read moreof your Industry type