Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Nuppl/Gtps Application Of Castable Refractory Through Gunning Method In Unit 2 Bottom Ash Hopper.
|
| Description |
Nuppl/Gtps Application Of Castable Refractory Through Gunning Method In Unit 2 Bottom Ash Hopper.
|
| Organisation | Neyveli Uttar Pradesh Power Limited (NUPPL) | Public Sector Undertakings |
| Tender Id | 2526020003 |
|
Reference Number |
2526020003 |
| Tender Fee | 0 |
| EMD | 1.25 Lakh |
| Tender Value | - |
| Place | Kanpur |
| Link |
View Original Tender Notice
https://procure.nlcindia.in/specification/tender/2526020003 |
| Start Date | May 01, 2025 00:30 |
| End Date |
Expired
07/05/2025
Expired 525 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.
Tggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.
Read moreRectification of existing pa fan motor concrete bed of unit 1 1b and dismantling partition wall in between mill floor and bottom ash hopper of unit 1
Rectification of existing pa fan motor concrete bed of unit 1 1b and dismantling partition wall in between mill floor and bottom ash hopper of unit 1
Read moreTtps mechii ahp painting of unitiii bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr el during the forthcoming annual overhaul
Ttps mechii ahp painting of unitiii bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr el during the forthcoming annual overhaul
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - overhauling work of bottom ash hopper system and dfa system of unit no 10 btps obra power house equipment service provider
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - overhauling work of bottom ash hopper system and dfa system of unit no 10 btps obra power house equipment service provider
Read moreKtps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg
Ktps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg
Read moreNuppl/gtps- ahp package- supply & application of castable refractory for unit-3 bottom ash hopper.
Nuppl/gtps- ahp package- supply & application of castable refractory for unit-3 bottom ash hopper.
Read moreFixing of scaffolding and replacement of castable refractory in bottom ash hopper of ash handling plant
Fixing of scaffolding and replacement of castable refractory in bottom ash hopper of ash handling plant during overhauling of unit 7, 2x500mw, dtps, anpara
Read moreFixing of scaffolding and replacement of castable refractory in bottom ash hopper of ash handling plant
Fixing of scaffolding and replacement of castable refractory in bottom ash hopper of ash handling plant during overhauling of unit 7, 2x500mw, dtps, anpara
Read moreof your Industry type