Tender Details
Particulars | Details |
---|---|
Title |
Planting Of Trees On Both Side Of Road At Msh 4 To Jalwai Khunawade To Mdr 6 Road, Mdr 5 Km. 0/00 To 13/050 Km Taluka Dahnu, Dist. Palghar, And Maintain And Nurture For 3 Year.
|
Description |
Planting Of Trees On Both Side Of Road At Msh 4 To Jalwai Khunawade To Mdr 6 Road, Mdr 5 Km. 0/00 To 13/050 Km Taluka Dahnu, Dist. Palghar, And Maintain And Nurture For 3 Year.
|
Organisation | Public Works Region | State Govt. and UT |
Tender Id | 2024_PWR_1104181_3 |
Reference Number |
PWD/PAL/24-25/Notice_No_112 |
Tender Fee | 1680 |
EMD | 1.04 Lakh |
Tender Value | |
Place | DAHANU |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1928215 |
Start Date | October 04, 2024 19:00 |
End Date |
09/10/2024 ( Expired 244 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreStrengthening of chamkar sahib neelon doraha road to morinda-chamkaur sahib road via village kandhola road (odr), length 6.63 km under 5054 rb-10 roads (fy 2025-26) in district rupnagar including 5 years maintenace (1 year dlp and 4 years
Strengthening of chamkar sahib neelon doraha road to morinda-chamkaur sahib road via village kandhola road (odr), length 6.63 km under 5054 rb-10 roads (fy 2025-26) in district rupnagar including 5 years maintenace (1 year dlp and 4 years
Read moreRectification works by attending patchup to the existing damaged 457.5 e bt road from unit 4 and 5 entrance to jt 3 building towards south side at ttps
Rectification works by attending patchup&#x0d to the existing damaged 457.5 e bt road from unit 4 and 5&#x0d entrance to jt 3 building towards south side at ttps
Read moreAssisting day to day maintenance of mech. work (belt joint making, belt structure alignment, top roller, bottom roller, stool, channel etc replacement and repairing) of tb-1, tb-2, tb-3, tb-4, tb-5 and tb-6 for a period of one year at churi colliery
Assisting day to day maintenance of mech. work (belt joint making, belt structure alignment, top roller, bottom roller, stool, channel etc replacement and repairing) of tb-1, tb-2, tb-3, tb-4, tb-5 and tb-6 for a period of one year at churi colliery
Read more1. improvements to road from km 0/75 to 2/25 4/8 to 5/4 of allur to main road nandikotkur in nandyal district. 2. improvements to road from km 0/0 to 10/6 of brahmanakotkur midthur road in nandyal district.
1. improvements to road from km 0/75 to 2/25 4/8 to 5/4 of allur to main road nandikotkur in nandyal district. 2. improvements to road from km 0/0 to 10/6 of brahmanakotkur midthur road in nandyal district.
Read more1) improvements to nh5 to rekhadevapuram via kesarapada, arjunapuram from km 0/0 to 6/520 in srikakulam district 2) improvements to kanchili railway feeder to bhogabeni via gopavaram from km 4/5 to 6/0 in srikakulam district
1)improvements to nh5-rekhadevipuram (via) kesarapada,arjunapuram from km 0/0-6/520 in in srikakulam district 2) improvements to kanchili railway feeder to bhogabeni via gopavaram road from km 4/5 to 6/0 in srikakulam district
Read moreImprovements to road from km.3/0 - 5/4 of mukkamalla - owk road in nandyal district
Improvements to road from km.3/0 - 5/4 of mukkamalla - owk road in nandyal district
Read moreConstruction of retaining wall on narwana to tohana road (mdr-111) at km 15.45 to 15.75 (both side) in jind distt. (road id 6732) (mdr-111)
Construction of retaining wall on narwana to tohana road (mdr-111) at km 15.45 to 15.75 (both side) in jind distt. (road id 6732) (mdr-111)
Read moreof your Industry type