Tender Details

About Tender

🏗️ Invitation For Bids: Construction Of Mdr 27 Jambhali To Nilkantheshwar Road 🛣️ The Central Road And Building Department, Rural Development And Panchayati Raj (Rdd Mmgsy), State Government And Ut, Invites Bids For The Construction Of The Remaining Length Of The Mumbai Dhule Ratnagiri (Mdr) 27, Jambhali To Nilkantheshwar Road, From Km 1/00 To 1/650 In Tal. Haveli, District Pune. 📅 Bid Submission Deadline: July 11, 2024, 5:00 Pm Tender Fee: Inr 5000 Earnest Money Deposit (Emd): Inr 150000 Interested Contractors Must Submit Detailed Bids, Including Technical And Financial Proposals, In Accordance With The Project Specifications And Guidelines. Keywords: Construction, Road Infrastructure, Mdr 27, Jambhali To Nilkantheshwar Road, Tal. Haveli, District Pune, Government Tender, Bid Submission, Emd, Tender Fee
Particulars Details
Title
Construction Of Road In Remaining Length Of Mdr 27 Jambhali To Nilkantheshwar Road From Km 1/00 To 1/650 Tal. Haveli Dist. Pune
Description
Construction Of Road In Remaining Length Of Mdr 27 Jambhali To Nilkantheshwar Road From Km 1/00 To 1/650 Tal. Haveli Dist. Pune
Organisation CE RDD MMGSY | State Govt. and UT
Tender Id 2024_MMGSY_1045278_2
Reference
Number
NOTICE INVITING TENDER No. 02 /2024-25
Tender Fee 5000
EMD 1.5 Lakh
Tender Value
Place Haveli
Link https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1825520
Start Date June 27, 2024 16:30
End Date

11/07/2024 ( Expired 351 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Develop. of 4l badvel to nellore highway from badvel gopavaram vill on nh-67 ch.630.960 to guruvindapudi vill on nh16 ch.739.094 in ap on bot mode for a total length of 108.134 km

Develop. of 4l badvel to nellore highway from badvel gopavaram vill on nh-67 ch.630.960 to guruvindapudi vill on nh16 ch.739.094 in ap on bot mode for a total length of 108.134 km

Read more
Consultancy services for detailed project report (dpr) for construction of 4/6-lane ring road / bypass (180 km) to decongest nh-66 in the state of goa.

Consultancy services for detailed project report (dpr) for construction of 4/6-lane ring road / bypass (180 km) to decongest nh-66 in the state of goa.

Read more
Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham

Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham

Read more
Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.

Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.

Read more
Const. of 4lane elevated corridor including approaches from old pune naka to boramani naka on nh65 in solapur city on ham in maharashtra (km 0.050 to km 9.710)

Const. of 4lane elevated corridor including approaches from old pune naka to boramani naka on nh65 in solapur city on ham in maharashtra (km 0.050 to km 9.710)

Read more
Consultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh

Consultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh

Read more
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Read more
Rehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).

Rehabilitation and upgradation of umred-nagbhir section from km 48-400 to 96-700 (excluding bhiwapur city portion from km 68-370 to km 70-770 and rub) of nh-353d to 4lps configuration in the state of maharashtra on ham mode (total length-45. 834 km).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise