Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Widening Of Exis 2 L To 4 L Divided Carriageway With Ps From Km243.800 To Km270.500 Of Nh 39(rewa To Churhat Tunnel North Portal Excluding Churhat Tunnel)and From Km286.200 To Km 313.700 Of Nh39(churhat To Sidhi Sec)l 54.20 Km Under Nh(o) In Mp On Ham
|
| Description |
Widening Of Exis 2 L To 4 L Divided Carriageway With Ps From Km243.800 To Km270.500 Of Nh 39(rewa To Churhat Tunnel North Portal Excluding Churhat Tunnel)and From Km286.200 To Km 313.700 Of Nh39(churhat To Sidhi Sec)l 54.20 Km Under Nh(o) In Mp On Ham
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2025_NHAI_242402_1 |
|
Reference Number |
MPDIV/16 /2024-NHAI- RO Bhopal (266127) |
| Tender Fee | 1 Lakh |
| EMD | 9 Crore |
| Tender Value | - |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=276629 |
| Start Date | July 24, 2025 18:30 |
| End Date |
Expired
30/10/2025
Expired 310 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ie services for widening of existing 2-4 lane divided carriageway with paved shoulder from km243.800-km270.500 of nh39 (rewa to churhat tunnel) and from km286.200-km313.700 of nh 39 (churhat to sidhi) (54.20 km) under nh(o) in the state of mp on ham
Ie services for widening of existing 2-4 lane divided carriageway with paved shoulder from km243.800-km270.500 of nh39 (rewa to churhat tunnel) and from km286.200-km313.700 of nh 39 (churhat to sidhi) (54.20 km) under nh(o) in the state of mp on ham
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreIndependent engineering services for operation and maintenance of churhat bypass section including tunnel on rewa-sidhi section of nh 75e from ch. 33.200 to ch. 55.400 design length 15.350 km. in the state of mp on hybrid annuity mode.
Independent engineering services for operation and maintenance of churhat bypass section including tunnel on rewa-sidhi section of nh 75e from ch. 33.200 to ch. 55.400 design length 15.350 km. in the state of mp on hybrid annuity mode.
Read moreConstruction of road tunnel with its approaches from shiv murti interchange on nh-248bb /nh-48 to nelson mandela marg (nh-148ae) in delhi on epc mode. (ch. 0.000 to 4.983)
Construction of road tunnel with its approaches from shiv murti interchange on nh-248bb /nh-48 to nelson mandela marg (nh-148ae) in delhi on epc mode. (ch. 0.000 to 4.983)
Read moreEngagement of user fee collection agency on the basis of cb through etender for sonvarsa fp at km 58.800 for the use of four lane section of churhat by-pass section of rewa-sidhi-section of nh-75e (new nh39) in the state of madhya pradesh
Engagement of user fee collection agency on the basis of cb through etender for sonvarsa fp at km 58.800 for the use of four lane section of churhat by-pass section of rewa-sidhi-section of nh-75e (new nh39) in the state of madhya pradesh
Read moreConsultancy services for preparation of detailed project report for construction of 2-lane tunnel between sonprayag nh-107 and kalimath (sh-96) including approach road up to chunni bend on nh-107a total length23 km including 7 km of tunnel in the st
Consultancy services for preparation of detailed project report for construction of 2-lane tunnel between sonprayag nh-107 and kalimath (sh-96) including approach road up to chunni bend on nh-107a total length23 km including 7 km of tunnel in the st
Read moreConsultancy services for preparation of detailed project report for construction of 2-lane tunnel between sonprayag nh-107 and kalimath (sh-96) including approach road up to chunni bend on nh-107a total length23 km including 7 km of tunnel in the st
Consultancy services for preparation of detailed project report for construction of 2-lane tunnel between sonprayag nh-107 and kalimath (sh-96) including approach road up to chunni bend on nh-107a total length23 km including 7 km of tunnel
Read moreConstruction of 33kv bay at 132/33 kv khellani dedicated to uni-directional khellani-tunnel of length 1.574 on nh-244
Construction of 33kv bay at 132/33 kv khellani dedicated to uni-directional khellani-tunnel of length 1.574 on nh-244
Read moreConstruction of 33kv bay at 132/33 kv khellani dedicated to uni-directional khellani-tunnel of length 1.574 on nh-244
Construction of 33kv bay at 132/33 kv khellani dedicated to uni-directional khellani-tunnel of length 1.574 on nh-244
Read moreof your Industry type