Tender Details
Particulars | Details |
---|---|
Title |
Epc Improvement Of Manor Wada Road (Sh 34) From Km. 29/550 To Km. 53/800 And Wada Bhiwandi Road (Sh 35) From Km. 49/000 To Km. 89/070, Tal Bhiwandi, Dist Thane)
|
Description |
Epc Improvement Of Manor Wada Road (Sh 34) From Km. 29/550 To Km. 53/800 And Wada Bhiwandi Road (Sh 35) From Km. 49/000 To Km. 89/070, Tal Bhiwandi, Dist Thane)
|
Organisation | Public Works Region | State Govt. and UT |
Tender Id | 2024_PWR_1074837_1 |
Reference Number |
NIT_NO_03_FOR_2024_25 EPC |
Tender Fee | 94900 |
EMD | 7.77 Crore |
Tender Value | |
Place | Thane |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1875632 |
Start Date | August 23, 2024 21:30 |
End Date |
20/09/2024 ( Expired 239 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreStrengthening road safety works including improvement and routine o and m of delhi-gurgaon section of nh-48 other works along the project highway from km. 14.300 to 42.000 (rao tula ram marg in delhi to kherki dhaula fp in haryana) in delhi haryana
Strengthening road safety works including improvement and routine o and m of delhi-gurgaon section of nh-48 other works along the project highway from km. 14.300 to 42.000 (rao tula ram marg in delhi to kherki dhaula fp in haryana) in delhi haryana
Read moreRehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Read moreConstruction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreConsultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.
Read moreMtc of road from sanyasi mura to bagaban chowdhury end pointduring the year 2025-26 / sh patch grouting,wbm-iii, carpeting ,seal coat etc.( ch. 0.00 to 2.50 k.m and ch. 4.20 to 5.40 km)
Mtc of road from sanyasi mura to bagaban chowdhury end pointduring the year 2025-26 / sh patch grouting,wbm-iii, carpeting ,seal coat etc.( ch. 0.00 to 2.50 k.m and ch. 4.20 to 5.40 km)
Read moreMtc. of road ing from vip road(near natunnagar grabank) to kataltali-gandhigram road(narayan bhowmik house) and vip road at durjoynagar(near vegetable shops) to hatipara road(l-1.20 km), during the year 2025- 26./sh side berm dressing, wbm-3
Mtc. of road ing from vip road(near natunnagar grabank) to kataltali-gandhigram road(narayan bhowmik house) and vip road at durjoynagar(near vegetable shops) to hatipara road(l-1.20 km), during the year 2025- 26./sh side berm dressing, wbm-3
Read moreof your Industry type