Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing 37 5 Mld Mps And 15 Mld Stp Based On Sbr Technology With Tertiary Treatment For 15 Mld Flow Including Transformer Dg Set Etc Construction Of Stp In Sector 14 P Ii Hisar Providing And Laying Of Hdpe Pipe Lines Of Various Size For Sup
|
| Description |
Providing 37 5 Mld Mps And 15 Mld Stp Based On Sbr Technology With Tertiary Treatment For 15 Mld Flow Including Transformer Dg Set Etc Construction Of Stp In Sector 14 P Ii Hisar Providing And Laying Of Hdpe Pipe Lines Of Various Size For Sup
|
| Organisation | Government of Haryana |
| Tender Id | 2023_HBC_290145_1 |
|
Reference Number |
JOB NO.88.2023 |
| Tender Fee | 5000 |
| EMD | 3.01 Lakh |
| Tender Value | - |
| Place | Executive Engineer HSVP Division No II Hisar |
| Link |
View Original Tender Notice
https://etenders.hry.nic.in |
| Start Date | June 13, 2023 22:40 |
| End Date |
Expired
03/07/2023
Expired 1204 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Others - grey water reuse-15 mld tertiary treatment plant at stp muttathara, thiruvananthapuram
Design engineering, procurement, construction, erection, commissioning and operation and maintenance for a period of 5 years after successful commissioning of 15 mld treatment plant for tertiary treatment of sewage effluent at stp muttathara tvpm
Read moreDesign, construction, supply, installation, testing and commissioning of 5.2 mld stp based on sbr with tertiary treatment and providing sewer network in belgaria township including 5 years operation and maintenance (2 years dlp)
Design, construction, supply, installation, testing and commissioning of 5.2 mld stp based on sbr with tertiary treatment and providing sewer network in belgaria township including 5 years operation and maintenance (2 years dlp)
Read moreConstruction of stp of cap. of 20 mld and const. of mps cap. of 45 mld peak flow including 5 years o and m and all other alied works at ferozepur town distt ferozepur under amrut 2.0 scheme.
Construction of stp of cap. of 20 mld and const. of mps cap. of 45 mld peak flow including 5 years o and m and all other alied works at ferozepur town distt ferozepur under amrut 2.0 scheme.
Read moreInterception and diversion i and d of sewerage network, mps, 1 mld stp and fstp at fatehgarh panjtur distt. moga
Interception and diversion i and d of sewerage network, mps, 1 mld stp and fstp at fatehgarh panjtur distt. moga
Read moreInterception and diversion i and d of sewerage network,mps 2 mld stp and fstp at nihal singh wala distt. moga
Interception and diversion i and d of sewerage network,mps 2 mld stp and fstp at nihal singh wala distt. moga
Read moreInstallation of ocms ms inlet electromagnetic flow meter in 28.05 mld stp in tanjavur city municipal corporation
Installation of ocms ms inlet electromagnetic flow meter in 28.05 mld stp in tanjavur city municipal corporation
Read moreProviding laying cutting testig of sewer rcc np 3 with hdpe lining and rising main d i k 9 pipe cont m h chamber hatch box mps and survey design supply and soil testing const inst comm of 20 mld stp cum 60 kld fstp inclluding o and m gurdaspur
Providing laying cutting testnig of sewer rcc np 3 with hdpe lining and rising main d i k 9 pipe cont m h chamber hatch box mps and survey design supply and soil testing const inst comm of 20 mld stp cum 60 kld fstp including o and m gurdaspur
Read moreProviding laying of sewer construction of ips mps laying of rising main and construction installing and commissioning of 5.5 mld stp plant cum 17 kld fstp based on and all other works contingent there to at gharuan distt sas nagar sbm 2 scheme
Providing laying of sewer construction of ips mps laying of rising main and construction installing and commissioning of 5.5 mld stp plant cum 17 kld fstp based on and all other works contingent there to at gharuan distt sas nagar sbm 2 scheme
Read moreEpc and performance run followed by o and m of stp of 50 mld capacity based on sbr technology at nevta including 3 months trial run and 1 year o and m and after with 10 years o and m for ward 65 66 67 bhankrota and surrounding nearby areas upto nevta
Epc and performance run followed by o and m of stp of 50 mld capacity based on sbr technology at nevta including 3 months trial run and 1 year o and m and after with 10 years o and m for ward 65 66 67 bhankrota and surrounding nearby areas upto nevta
Read moreProviding 37.5 mld mps and 15 mld stp based on sbr technology with tertiary treatment for 15 mld flow including transformer d.g. set. etc. construction of stp in sector 14p ii, hisar. providing and laying of hdpe pipe lines of various size for supply
Providing 37.5 mld mps and 15 mld stp based on sbr technology with tertiary treatment for 15 mld flow including transformer d.g. set. etc. construction of stp in sector 14p ii, hisar. providing and laying of hdpe pipe lines of various size for supply
Read moreof your Industry type