| Particulars | Details |
|---|---|
| Title |
Providing Laying Cutting Testig Of Sewer Rcc Np 3 With Hdpe Lining And Rising Main D I K 9 Pipe Cont M H Chamber Hatch Box Mps And Survey Design Supply And Soil Testing Const Inst Comm Of 20 Mld Stp Cum 60 Kld Fstp Inclluding O And M Gurdaspur
|
| Description |
Providing Laying Cutting Testnig Of Sewer Rcc Np 3 With Hdpe Lining And Rising Main D I K 9 Pipe Cont M H Chamber Hatch Box Mps And Survey Design Supply And Soil Testing Const Inst Comm Of 20 Mld Stp Cum 60 Kld Fstp Including O And M Gurdaspur
|
| Organisation | Department of Local Government | Punjab Water Supply and Sewerage Board | Division - Gurdaspur |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 1000 |
| EMD | 81.89 Lakh |
| Tender Value | - |
| Place | Punjab |
| Link | Login to view |
| Start Date | October 01, 2026 19:30 |
| End Date |
Open
22/10/2026
10 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing laying of sewer construction of ips mps laying of rising main and construction installing and commissioning of 5.5 mld stp plant cum 17 kld fstp based on and all other works contingent there to at gharuan distt sas nagar sbm 2 scheme
Providing laying of sewer construction of ips mps laying of rising main and construction installing and commissioning of 5.5 mld stp plant cum 17 kld fstp based on and all other works contingent there to at gharuan distt sas nagar sbm 2 scheme
Read moreProv and laying sew. const of mh chambers, intake chamber/mps including pumping machinery pipes and specials rising main hatch box vertical shaft and const. of 2.50 mld stp cum fstp (06 kld) based on any proven tech.at devigarh
Prov and laying sew. const of mh chambers, intake chamber/mps including pumping machinery pipes and specials rising main hatch box vertical shaft and const. of 2.50 mld stp cum fstp (06 kld) based on any proven tech.at devigarh
Read moreProv. and laying sew. const of mh chamber intake chamber mps including pumping machinery pipes and specials rising main hatch box vertical shaft and cons. of 2.50 mld stp cum fstp of 06 kld based on any proven tech. at devigarh
Prov. and laying sew. const of mh chamber intake chamber mps including pumping machinery pipes and specials rising main hatch box vertical shaft and cons. of 2.50 mld stp cum fstp of 06 kld based on any proven tech. at devigarh
Read moreProv and laying of sew upvc and rcc np3 with hdpe lining and rising main pipe line di k9 const of mh hatch box mps ips intake chamber and stp 5 mld with 15 kld fstp and sixty months o and m works at sujanpur town district pathankot
Prov and laying of sew upvc and rcc np3 with hdpe lining and rising main pipe line di k9 const of mh hatch box mps ips intake chamber and stp 5 mld with 15 kld fstp and sixty months o and m works at sujanpur town district pathankot
Read moreProv and laying of sew upvc and rcc np3 with hdpe lining and rising main pipe line di k9 const of mh hatch box mps ips intake chamber and stp 5 mld with 15 kld fstp and sixty months o and m works at sujanpur town district pathankot
Prov and laying of sew upvc and rcc np3 with hdpe lining and rising main pipe line di k9 const of mh hatch box mps ips intake chamber and stp 5 mld with 15 kld fstp and sixty months o and m works at sujanpur town district pathankot
Read moreProv and laying of sew upvc and rcc np3 with hdpe lining and rising main pipe line di k9 const of mh hatch box mps ips intake chamber and stp 5 mld with 15 kld fstp and sixty months o and m works at sujanpur town district pathankot
Prov and laying of sew upvc and rcc np3 with hdpe lining and rising main pipe line di k9 const of mh hatch box mps ips intake chamber and stp 5 mld with 15 kld fstp and sixty months o and m works at sujanpur town district pathankot
Read moreSurvey, soil testing, design, supply and construction, installation, commissioning of 3 mld stp cum 9 kld fstp, rcc np3 sewer and mps at dhanaula under sbm 2.0
Survey, soil testing, design, supply and construction, installation, commissioning of 3 mld stp cum 9 kld fstp, rcc np3 sewer and mps at dhanaula under sbm 2.0
Read moreSurvey, soil testing, design, supply and construction, installation, commissioning of 3 mld stp cum 9 kld fstp, rcc np3 sewer and mps at dhanaula under sbm 2.0
Survey, soil testing, design, supply and construction, installation, commissioning of 3 mld stp cum 9 kld fstp, rcc np3 sewer and mps at dhanaula under sbm 2.0
Read moreSurvey, soil testing, design, supply and construction, installation, commissioning of 3 mld stp cum 9 kld fstp, rcc np3 sewer and mps at dhanaula under sbm 2.0
Survey, soil testing, design, supply and construction, installation, commissioning of 3 mld stp cum 9 kld fstp, rcc np3 sewer and mps at dhanaula under sbm 2.0
Read morePart-a prov. sew. scheme, restoration of roads, const. of mps, stp cum fstp, rising main and offtake chamber at mehatpur town, distt. jalandhar (under swachh bharat mission 2.0). part-b stp1no. capacity 2.00mld cum 6kld fstp.
Part-a prov. sew. scheme, restoration of roads, const. of mps, stp cum fstp, rising main and offtake chamber at mehatpur town, distt. jalandhar (under swachh bharat mission 2.0). part-b stp1no. capacity 2.00mld cum 6kld fstp.
Read moreof your Industry type