Tender Details

Particulars Details
Title
Providing Laying Cutting Testig Of Sewer Rcc Np 3 With Hdpe Lining And Rising Main D I K 9 Pipe Cont M H Chamber Hatch Box Mps And Survey Design Supply And Soil Testing Const Inst Comm Of 20 Mld Stp Cum 60 Kld Fstp Inclluding O And M Gurdaspur
Description
Providing Laying Cutting Testnig Of Sewer Rcc Np 3 With Hdpe Lining And Rising Main D I K 9 Pipe Cont M H Chamber Hatch Box Mps And Survey Design Supply And Soil Testing Const Inst Comm Of 20 Mld Stp Cum 60 Kld Fstp Including O And M Gurdaspur
Organisation Department of Local Government | Punjab Water Supply and Sewerage Board | Division - Gurdaspur
Tender Id Login to view
Reference
Number
Login to view
Tender Fee 1000
EMD 81.89 Lakh
Tender Value -
Place Punjab
Link Login to view
Start Date October 01, 2026 19:30
End Date
Open 22/10/2026

10 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Providing laying of sewer construction of ips mps laying of rising main and construction installing and commissioning of 5.5 mld stp plant cum 17 kld fstp based on and all other works contingent there to at gharuan distt sas nagar sbm 2 scheme

Providing laying of sewer construction of ips mps laying of rising main and construction installing and commissioning of 5.5 mld stp plant cum 17 kld fstp based on and all other works contingent there to at gharuan distt sas nagar sbm 2 scheme

Read more
Prov and laying sew. const of mh chambers, intake chamber/mps including pumping machinery pipes and specials rising main hatch box vertical shaft and const. of 2.50 mld stp cum fstp (06 kld) based on any proven tech.at devigarh

Prov and laying sew. const of mh chambers, intake chamber/mps including pumping machinery pipes and specials rising main hatch box vertical shaft and const. of 2.50 mld stp cum fstp (06 kld) based on any proven tech.at devigarh

Read more
Prov. and laying sew. const of mh chamber intake chamber mps including pumping machinery pipes and specials rising main hatch box vertical shaft and cons. of 2.50 mld stp cum fstp of 06 kld based on any proven tech. at devigarh

Prov. and laying sew. const of mh chamber intake chamber mps including pumping machinery pipes and specials rising main hatch box vertical shaft and cons. of 2.50 mld stp cum fstp of 06 kld based on any proven tech. at devigarh

Read more
Prov and laying of sew upvc and rcc np3 with hdpe lining and rising main pipe line di k9 const of mh hatch box mps ips intake chamber and stp 5 mld with 15 kld fstp and sixty months o and m works at sujanpur town district pathankot

Prov and laying of sew upvc and rcc np3 with hdpe lining and rising main pipe line di k9 const of mh hatch box mps ips intake chamber and stp 5 mld with 15 kld fstp and sixty months o and m works at sujanpur town district pathankot

Read more
Prov and laying of sew upvc and rcc np3 with hdpe lining and rising main pipe line di k9 const of mh hatch box mps ips intake chamber and stp 5 mld with 15 kld fstp and sixty months o and m works at sujanpur town district pathankot

Prov and laying of sew upvc and rcc np3 with hdpe lining and rising main pipe line di k9 const of mh hatch box mps ips intake chamber and stp 5 mld with 15 kld fstp and sixty months o and m works at sujanpur town district pathankot

Read more
Prov and laying of sew upvc and rcc np3 with hdpe lining and rising main pipe line di k9 const of mh hatch box mps ips intake chamber and stp 5 mld with 15 kld fstp and sixty months o and m works at sujanpur town district pathankot

Prov and laying of sew upvc and rcc np3 with hdpe lining and rising main pipe line di k9 const of mh hatch box mps ips intake chamber and stp 5 mld with 15 kld fstp and sixty months o and m works at sujanpur town district pathankot

Read more
Survey, soil testing, design, supply and construction, installation, commissioning of 3 mld stp cum 9 kld fstp, rcc np3 sewer and mps at dhanaula under sbm 2.0

Survey, soil testing, design, supply and construction, installation, commissioning of 3 mld stp cum 9 kld fstp, rcc np3 sewer and mps at dhanaula under sbm 2.0

Read more
Survey, soil testing, design, supply and construction, installation, commissioning of 3 mld stp cum 9 kld fstp, rcc np3 sewer and mps at dhanaula under sbm 2.0

Survey, soil testing, design, supply and construction, installation, commissioning of 3 mld stp cum 9 kld fstp, rcc np3 sewer and mps at dhanaula under sbm 2.0

Read more
Survey, soil testing, design, supply and construction, installation, commissioning of 3 mld stp cum 9 kld fstp, rcc np3 sewer and mps at dhanaula under sbm 2.0

Survey, soil testing, design, supply and construction, installation, commissioning of 3 mld stp cum 9 kld fstp, rcc np3 sewer and mps at dhanaula under sbm 2.0

Read more
Part-a prov. sew. scheme, restoration of roads, const. of mps, stp cum fstp, rising main and offtake chamber at mehatpur town, distt. jalandhar (under swachh bharat mission 2.0). part-b stp1no. capacity 2.00mld cum 6kld fstp.

Part-a prov. sew. scheme, restoration of roads, const. of mps, stp cum fstp, rising main and offtake chamber at mehatpur town, distt. jalandhar (under swachh bharat mission 2.0). part-b stp1no. capacity 2.00mld cum 6kld fstp.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise