Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Stp Of Cap. Of 20 Mld And Const. Of Mps Cap. Of 45 Mld Peak Flow Including 5 Years O And M And All Other Alied Works At Ferozepur Town Distt Ferozepur Under Amrut 2.0 Scheme.
|
| Description |
Construction Of Stp Of Cap. Of 20 Mld And Const. Of Mps Cap. Of 45 Mld Peak Flow Including 5 Years O And M And All Other Alied Works At Ferozepur Town Distt Ferozepur Under Amrut 2.0 Scheme.
|
| Organisation | Department of Local Government | Punjab Water Supply and Sewerage Board | Division - Ferozpur |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | 1000 |
| EMD | 29.97 Lakh |
| Tender Value | 4.62 Crore |
| Place | Punjab |
| Link | Login to view |
| Start Date | July 30, 2026 22:30 |
| End Date |
Open
21/10/2026
7 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Interception and diversion i and d of sewerage network, mps, 1 mld stp and fstp at fatehgarh panjtur distt. moga
Interception and diversion i and d of sewerage network, mps, 1 mld stp and fstp at fatehgarh panjtur distt. moga
Read moreInterception and diversion i and d of sewerage network,mps 2 mld stp and fstp at nihal singh wala distt. moga
Interception and diversion i and d of sewerage network,mps 2 mld stp and fstp at nihal singh wala distt. moga
Read moreImprovement of operational efficiency of stp units by providing necessary items at various components at 0.6 mld stp at safilguda as part of 2nd phase of jal hi amrit reforms incentive utilization of stps under amrut 2.0 under sd-ii, project division no.-i
Improvement of operational efficiency of stp units by providing necessary items at various components at 0.6 mld stp at safilguda as part of 2nd phase of jal hi amrit reforms incentive utilization of stps under amrut 2.0 under sd-ii, project division no.-i
Read moreProviding laying of sewer construction of ips mps laying of rising main and construction installing and commissioning of 5.5 mld stp plant cum 17 kld fstp based on and all other works contingent there to at gharuan distt sas nagar sbm 2 scheme
Providing laying of sewer construction of ips mps laying of rising main and construction installing and commissioning of 5.5 mld stp plant cum 17 kld fstp based on and all other works contingent there to at gharuan distt sas nagar sbm 2 scheme
Read moreImprovement and strengthening of processing units by providing necessary arrangements/repairs at 10 mld stp at peddacheruvu as part of 2nd phase of jal hi amrit 2.0 reforms incentives utilization of stps under amrut 2.0 under project division-i, amberpet
Improvement and strengthening of processing units by providing necessary arrangements/repairs at 10 mld stp at peddacheruvu as part of 2nd phase of jal hi amrit 2.0 reforms incentives utilization of stps under amrut 2.0 under project division-i, amberpet
Read moreProviding laying cutting testig of sewer rcc np 3 with hdpe lining and rising main d i k 9 pipe cont m h chamber hatch box mps and survey design supply and soil testing const inst comm of 20 mld stp cum 60 kld fstp inclluding o and m gurdaspur
Providing laying cutting testnig of sewer rcc np 3 with hdpe lining and rising main d i k 9 pipe cont m h chamber hatch box mps and survey design supply and soil testing const inst comm of 20 mld stp cum 60 kld fstp including o and m gurdaspur
Read moreProviding necessary mechanical equipments for aeration unit and components/items in main electrical panels etc to improve operational and energy efficiency of 30 mld stp nallacheruvu as part of 2nd phase of jal hi amrit 2.0 reforms incentives utilization of stps under amrut 2.0 under project division-i, amberpet
Providing necessary mechanical equipments for aeration unit and components/items in main electrical panels etc to improve operational and energy efficiency of 30 mld stp nallacheruvu as part of 2nd phase of jal hi amrit 2.0 reforms incentives utilization of stps under amrut 2.0 under project division-i, amberpet
Read more6 mld stp cum fstp at dibrugarh under amrut
Construction of 6&#x0d mld stp cum fstp mbbr technology at &#x0d dibrugarh under &#x0d amrut 2 including &#x0d 5 years operation and maintenance on epc mode
Read moreof your Industry type