Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Sajaldhara At Jaynabad With Solar Panel
|
| Description |
Construction Of Sajaldhara At Jaynabad With Solar Panel
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_ZPHD_570805_2 |
|
Reference Number |
08/ 15TH FC(Tied) / 2023-24 |
| Tender Fee | 3000 |
| EMD | 23400 |
| Tender Value | - |
| Place | NANDANPUR GP |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | September 16, 2023 23:30 |
| End Date |
Expired
30/09/2023
Expired 1101 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreConst of sajaldhara with solar panel at tarakganj s 24
Const of sajaldhara with solar panel at tarakganj s 24
Read moreConstruction installation of sajaldhara water purification prakalpa with solar panel at garaimari -xii
Construction installation of sajaldhara water purification prakalpa with solar panel at garaimari -xii
Read moreConstruction and installation of mini sajaldhara with solar panel at garaiimari sansad xv
Construction and installation of mini sajaldhara with solar panel at garaiimari sansad xv
Read moreSolar sajaldhara
Installation of solar sajaldhara infront the house of nusraf mondal at durlaverpara.
Read moreSolar sajaldhara
Installation of solar sajaldhara at sahebrampur sardarpara sajaldhara under choapara gp
Read moreInstallation of mini sajaldhara with solar panel at mobarakpur under chhitka gp sansad no 24.
Installation of mini sajaldhara with solar panel at mobarakpur under chhitka gp sansad no 24.&#x0d
Read moreConstruction installation of sajaldhara water purification prakalpa with solar panel near the l o swasan sarkar at kanthalia sansad-xvii
Construction installation of sajaldhara water purification prakalpa with solar panel near the l o swasan sarkar at kanthalia sansad-xvii
Read moreof your Industry type