Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Independent Engineer Services For Construction Of Salempur Bypass To Four Lane With Paved Shoulder Configuration From Km 64.000 Of Nh 727 A To Km 61.500 Of Nh 727 B ,Design Length Of 14.700 Km Under Hybrid Annuity Mode (Ham) In The State Of Up
|
| Description |
Independent Engineer Services For Construction Of Salempur Bypass To Four Lane With Paved Shoulder Configuration From Km 64.000 Of Nh 727 A To Km 61.500 Of Nh 727 B ,Design Length Of 14.700 Km Under Hybrid Annuity Mode (Ham) In The State Of Up
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_MoRTH_780406_1 |
|
Reference Number |
CE-RO/LKO/NH(O)/24/NH-SB (727Aand727B)/2022-23/IE |
| Tender Fee | 5000 |
| EMD | 0 |
| Tender Value | - |
| Place | Chief Engineer - Regional Office,MoRTH Lucknow |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | November 10, 2023 00:25 |
| End Date |
Expired
17/01/2024
Expired 1002 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Consultancy services for independent engineer for 4 laning of muzaffarpur sitamarhi sonbarsa section of nh 22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham) (2nd call)
Read more4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
4-laning of muzaffarpur- sitamarhi- sonbarsa section of nh-22 (design ch. km. 0.000 to design ch. km. 82.551 total length 82.551 km) in the state of bihar on hybrid annuity mode (ham)
Read moreConsultancy services of independent engineer services for widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode in the state of odisha
Consultancy services of independent engineer services for widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode in the state of odisha
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConsultancy services for independent engineer for construction of 4 lane elevated corridor including approaches from old pune naka to boramani naka on nh 65 in solapur city on ham in the state of maharashtra.
Consultancy services for independent engineer for construction of 4 lane elevated corridor including approaches from old pune naka to boramani naka on nh 65 in solapur city on ham in the state of maharashtra.
Read moreConstruction of 6l gf ac indore eastern bypass starting from dc km 64.000 near pirkaradiya village and ending at dc km 113.000 on nh 347bg near village simrol/datoda pkg 1 of indore and dewas district in madhya pradesh on ham mode. l 49.00 km
Construction of 6l gf ac indore eastern bypass starting from dc km 64.000 near pirkaradiya village and ending at dc km 113.000 on nh 347bg near village simrol/datoda pkg 1 of indore and dewas district in madhya pradesh on ham mode. l 49.00 km
Read more4-6 laning of kharar-ludhiana section of nh-95 (new nh-05) from km. 10.185 to km. 86.199 samrala chowk, ludhiana in the state of punjab on hybrid annuity mode (ham) - execution of pending overlay and maintenance works at risk and cost of the concessi
4-6 laning of kharar-ludhiana section of nh-95 (new nh-05) from km. 10.185 to km. 86.199 samrala chowk, ludhiana in the state of punjab on hybrid annuity mode (ham) - execution of pending overlay and maintenance works at risk and cost of the concessi
Read moreIndependent engineer services during operation n maintenance period for 6 laning of kaliagura to baunsagar (od 5) and baunsagar to baraja of nh 130 cd raipur vishakapatnam economic corridor on ham in the state of odisha
Independent engineer services during operation n maintenance period for 6 laning of kaliagura to baunsagar (od 5) and baunsagar to baraja of nh 130 cd raipur vishakapatnam economic corridor on ham in the state of odisha
Read moreIndependent engineering services for four laning of madathukulam to pollachi section of nh-83 from design km 74/380 to km 116/950 of length-50.078 km on ham mode in the state of tamil nadu
Independent engineering services for four laning of madathukulam to pollachi section of nh-83 from design km 74/380 to km 116/950 of length-50.078 km on ham mode in the state of tamil nadu
Read moreIe services for const of 6l gf ac indore eastern bypass starting from design km 64.000 near pirkaradiya vill and ending at design km 113.000 on nh 347bg near vill simrol datoda pkg1 of indore n dewas district in mp on ham mode l 49.00 km
Ie services for const of 6l gf ac indore eastern bypass starting from design km 64.000 near pirkaradiya vill and ending at design km 113.000 on nh 347bg near vill simrol datoda pkg1 of indore n dewas district in mp on ham mode l 49.00 km
Read moreof your Industry type