Tender Details

Particulars Details
Title
Widening And Strengthening Of Nh 48 Kanwaliyas To Dhanop Kerot Km 18/700 To 46/300 Upto Mdr 154 And Hlb On Khari River Along With Cd Work
Description
Widening And Strengthening Of Nh 48 Kanwaliyas To Dhanop Kerot Km 18/700 To 46/300 Upto Mdr 154 And Hlb On Khari River Along With Cd Work
Organisation PWD - CE AND AS | State Govt. and UT
Tender Id 2025_CEPWD_453959_1
Reference
Number
NIT-26/2024-25 PWD ZONE AJMER
Tender Fee 7500
EMD 75.96 Lakh
Tender Value
Place SHAHPURA
Link https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=814859
Start Date March 21, 2025 15:00
End Date

22/04/2025 ( Expired 21 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Read more
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode

Read more
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.

Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.

Read more
Strengthening of existing stretch from km 101/880 to 105/300 of nh-167bg inkavali town along with one-time improvement of bypassed stretch of jaladanki town from km 91/770 to 94/300 on epc mode in spsr nellore district in the state of andhra pradesh

Strengthening of existing stretch from km 101/880 to 105/300 of nh-167bg inkavali town along with one-time improvement of bypassed stretch of jaladanki town from km 91/770 to 94/300 on epc mode in spsr nellore district in the state of andhra pradesh

Read more
Maintenance work of jabalpur bhopal section of nh-12 from bareli to goharganj (bineka village) km. 193.000 to km. 255.300 to four lane with paved shoulder with provision of rigid pavement on epc mode under nhdp-iii (package iv) on the risk and cost o

Maintenance work of jabalpur bhopal section of nh-12 from bareli to goharganj (bineka village) km. 193.000 to km. 255.300 to four lane with paved shoulder with provision of rigid pavement on epc mode under nhdp-iii (package iv) on the risk and cost o

Read more
Rehabilitation of bodhal bridge (at km 95.380) and chambal major bridge (at km 112.00) with widening of approaches from km 111/00 to km 111/864 on nh-552 ext. in the state of rajasthan (job no. nh-552 extn./rj/2024-25/856)

Rehabilitation of bodhal bridge (at km 95.380) and chambal major bridge (at km 112.00) with widening of approaches from km 111/00 to km 111/864 on nh-552 ext. in the state of rajasthan (job no. nh-552 extn./rj/2024-25/856)

Read more
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.

Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.

Read more
Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including

Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including

Read more
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode

Read more
Widening and strengthening work from halena to baroda meo mdr-357 km18/0 to 21/800 and 25/800 to 28/700 and 44/300 to 64/700

Widening and strengthening work from halena to baroda meo mdr-357 km18/0 to 21/800 and 25/800 to 28/700 and 44/300 to 64/700

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise