Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Tm Unit Ii Renewal Of Piston Seal Piston Rod Packing In Hp Lp Bypass Valves And Its Spray Valves Actuators Including Servicing Of Oil Filters During Coh Of 2024 25
|
Description |
Mtps I Tm Unit Ii Renewal Of Piston Seal Piston Rod Packing In Hp Lp Bypass Valves And Its Spray Valves Actuators Including Servicing Of Oil Filters During Coh Of 2024 25
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_488596_1 |
Reference Number |
CE / MTPS-I / SE / M-I / TM /OT. 180 / 2024-25 |
Tender Fee | 0 |
EMD | 2500 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=580686 |
Start Date | September 26, 2024 23:30 |
End Date |
10/10/2024 ( Expired 193 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Replacement servicing of various hp drain valves, lp valve, lp valve of oil and water line and repairing of basket of aph hot intermediate basket, cutting of plates from scrapyard and painting work at various places during oh6 ctps ptpp
Replacement servicing of various hp drain valves, &#x0d lp valve, lp valve of oil and water line and repairing of basket of aph hot intermediate basket, &#x0d cutting of plates from scrapyard and painting work at various places during oh6 ctps ptpp
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Read moreTtps mech ii tm i unit i ii iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves and hp heaters for the period from 01 04 25 to 31 03 26
Ttps mech ii tm i unit i ii iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves and hp heaters for the period from 01 04 25 to 31 03 26
Read moreDeputation of field service engineer for supervision during overhauling of hp bypass stop, control valves (imi bopp and reuther make) and hp bypass spray valves of unit-1, 660 mw (kwu design) at ntpc-north karanpura site, jharkhand .
Deputation of field service engineer for supervision during overhauling of hp bypass stop, control valves (imi bopp and reuther make) and hp bypass spray valves of unit-1, 660 mw (kwu design) at ntpc-north karanpura site, jharkhand .
Read moreService contract for servicing of hp and lp valves, safety valves and hp and lp bypass valves during unit-5 oh in jan-2026 under tmd, stps
Service contract for servicing of hp and lp valves, safety valves and hp and lp bypass valves during unit-5 oh in jan-2026 under tmd, stps
Read moreMtps i bm pressure parts units i and ii boiler prive breakdown maintenance of boiler pressure parts hp lp valves burner tilt mechanism oil gun cleaning soot blower operation cleaning and allied works
Mtps i bm pressure parts units i and ii boiler prive breakdown maintenance of boiler pressure parts hp lp valves burner tilt mechanism oil gun cleaning soot blower operation cleaning and allied works
Read moreMtps i bm pressure parts units iii and iv boiler prive breakdown maintenance of boiler pressure parts hp lp valves burner tilt mechanism oil gun cleaning soot blower operation cleaning and allied works
Mtps i bm pressure parts units iii and iv boiler prive breakdown maintenance of boiler pressure parts hp lp valves burner tilt mechanism oil gun cleaning soot blower operation cleaning and allied works
Read moreTtps mech ii bm unit iv v attending breakdown works in hp valves actuators safety valves wb lrsb prds etc and cleaning of i ii pass boiler structures from 0 metre to 56 metre elevation in unit iv v boiler for the period from 01 04 2025 to 31 03 2026
Ttps mech ii bm unit iv v attending breakdown works in hp valves actuators safety valves wb lrsb prds etc and cleaning of i ii pass boiler structures from 0 metre to 56 metre elevation in unit iv v boiler for the period from 01 04 2025 to 31 03 2026
Read moreMtps i tm ii unit i complete inspection and reconditioning of axial piston pump of hp lp bypass system oil supply unit
Mtps i tm ii unit i complete inspection and reconditioning of axial piston pump of hp lp bypass system oil supply unit
Read moreProcurement of parker make solenoid operated poppet valves for hp and lp bypass system installed in 2x660 mw, unit 3 and 4, sstpp, mppgcl, dongalia/pt-3095/etni-ii
Procurement of parker make solenoid operated poppet valves for hp and lp bypass system installed in 2x660 mw, unit 3 and 4, sstpp, mppgcl, dongalia
Read moreof your Industry type