Tender Details
Particulars | Details |
---|---|
Title |
Ttps Mech Ii Tm I Unit I Renewel Of Piston Seals Piston Rod Packings In Hp Lp Bypass Valves And Its Spray Valves Actuators Including Servicing Of Oil Filters During The Forthcoming Overhaul
|
Description |
Ttps Mech Ii Tm I Unit I Renewel Of Piston Seals Piston Rod Packings In Hp Lp Bypass Valves And Its Spray Valves Actuators Including Servicing Of Oil Filters During The Forthcoming Overhaul
|
Organisation | Government of Tamil Nadu |
Tender Id | 2023_EB_336073_1 |
Reference Number |
SE/M-II /TTPS/ No.234/2023-24 |
Tender Fee | 0 |
EMD | 3100 |
Tender Value | |
Place | O/o SE M II / TTPS |
Link | https://tntenders.gov.in |
Start Date | July 05, 2023 19:30 |
End Date |
25/07/2023 ( Expired 668 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ktps-v-tm-supervisory charges for 2 no of service engineers for overhauling of hp bypass main valves(bp1bp2) (model:ars100), hp bypass spray valves(bpe1,bpe2 bd) (model:e32s) and hp bypass oil supply units (model:ov 32 b) in unit-ix during aoh 2025-26.
Ktps-v-tm- supervisory charges for 2 no of service engineers for overhauling of hp bypass main valves(bp1 and bp2) (model:ars100), hp bypass spray valves(bpe1,bpe2 and bd) (model:e32s) and hp bypass oil supply units (model:ov 32 b) in unit-ix during aoh 2025-26.-reg.
Read moreMtpsi tm unit i renewal of piston seal piston rod packing in hp lp bypass valves and its spray valves actuators including servicing of oil filters during aoh of 2025 26
Mtpsi tm unit i renewal of piston seal piston rod packing in hp lp bypass valves and its spray valves actuators including servicing of oil filters during aoh of 2025 26
Read moreMtps i tm unit i complete overhauling of hp bypass lp bypass spray valves oil supply unit during aoh 2025 2026
Mtps i tm unit i complete overhauling of hp bypass lp bypass spray valves oil supply unit during aoh 2025 2026
Read moreTtps mech ii tm i unit i ii iii breakdown works in turbine lub oil system seal oil system such as mot lub oil seal oil pumps coolers etc for the period from 01 04 2025 to 31 03 2026
Ttps mech ii tm i unit i ii iii breakdown works in turbine lub oil system seal oil system such as mot lub oil seal oil pumps coolers etc for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii tm i unit i ii iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves and hp heaters for the period from 01 04 25 to 31 03 26
Ttps mech ii tm i unit i ii iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves and hp heaters for the period from 01 04 25 to 31 03 26
Read moreTtps mech ii tm i unit i ii iii breakdown works in main turbine system such as ejectors control valves critical pipe lines etc for the period from 01 04 2025 to 31 03 2026
Ttps mech ii tm i unit i ii iii breakdown works in main turbine system such as ejectors control valves critical pipe lines etc for the period from 01 04 2025 to 31 03 2026
Read moreService contract for servicing of hp and lp valves, safety valves and hp and lp bypass valves during unit-5 oh in jan-2026 under tmd, stps
Service contract for servicing of hp and lp valves, safety valves and hp and lp bypass valves during unit-5 oh in jan-2026 under tmd, stps
Read moreTtps mech ii bm unit iv v attending breakdown works in hp valves actuators safety valves wb lrsb prds etc and cleaning of i ii pass boiler structures from 0 metre to 56 metre elevation in unit iv v boiler for the period from 01 04 2025 to 31 03 2026
Ttps mech ii bm unit iv v attending breakdown works in hp valves actuators safety valves wb lrsb prds etc and cleaning of i ii pass boiler structures from 0 metre to 56 metre elevation in unit iv v boiler for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii bm unit i ii iii attending breakdown works in hp valves actuators safety valves wb lrsb prds etc in unit i ii iii boiler for the period from 01 04 2025 to 31 03 2026
Ttps mech ii bm unit i ii iii attending breakdown works in hp valves actuators safety valves wb lrsb prds etc in unit i ii iii boiler for the period from 01 04 2025 to 31 03 2026
Read moreMtps i tm ii unit i complete inspection and reconditioning of axial piston pump of hp lp bypass system oil supply unit
Mtps i tm ii unit i complete inspection and reconditioning of axial piston pump of hp lp bypass system oil supply unit
Read moreof your Industry type