Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Tm Unit Ii Complete Overhauling Of Hp Bypass Lp Bypass Spray Valves Oil Supply Unit During Coh 2024 2025
|
Description |
Mtps I Tm Unit Ii Complete Overhauling Of Hp Bypass Lp Bypass Spray Valves Oil Supply Unit During Coh 2024 2025
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_488645_1 |
Reference Number |
CE / MTPS-I / SE / M-I / TM /OT. 181 / 2024-25 |
Tender Fee | 0 |
EMD | 3200 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=580717 |
Start Date | September 26, 2024 23:30 |
End Date |
10/10/2024 ( Expired 239 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Overhauling of electrical and pneumatic actuators, sadc system, swas system,turbovisory equipments ,hp/lp bypass ,dozing system, flame scanners, igniters, solenoid valves, hot air gate, pneumatic damper/ power cylinder, hydra stepsvibration monitorin
Overhauling of electrical and pneumatic actuators, sadc system, swas system,turbovisoryequipments ,hp/lp bypass ,dozing system, flame scanners, igniters, solenoid valves, hot air gate, pneumatic damper/ power cylinder, hydra steps vibration monitori
Read moreApplication and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Application and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Read moreOverhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Overhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Read moreWork contract for round the clock complete operation and maintenance of ash handling system of unit 1 to 4 (4 x 210 mw) of ph-i and ph-ii at sgtps, mppgcl, birsinghpur
Work contract for round the clock complete operation and maintenance of ash handling system of unit 1 to 4 (4 x 210 mw) of ph-i and ph-ii at sgtps, mppgcl, birsinghpur
Read moreProcurement of castable firecrete refractory for insulation work of inside bottom ash hopper unit 3 during overhauling in 2025 26 for sgtpp wbpdcl
Procurement of castable firecrete refractory for insulation work of inside bottom ash hopper unit 3 during overhauling in 2025 26 for sgtpp wbpdcl.
Read moreAnnual mtc. of govt. office building of teliamura sub-division no. i, teliamura sub-division no. ii, kalyanpur sub-divisoin and mungiakami sub division, pwd(randb) and govt. residencial quarter within teliamura pwd complex during the year 2025-26.
Annual mtc. of govt. office building of teliamura sub-division no. i, teliamura sub-division no. ii, kalyanpur sub-divisoin and mungiakami sub division, pwd(randb) and govt. residencial quarter within teliamura pwd complex during the year 2025-26.
Read moreSupply of cs pipes for hp heaters drip line drains to expander in unit i
Supply of cs pipes for hp heaters drip line drains to expander in unit i
Read moreFdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb
Fdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb
Read moreSupply of sleeves for pump intermediate head shaft of vertical type cwp in unit i and ii
Sleeves for pump intermediate head shaft of vertical type cwp in unit i and ii
Read moreMtps i mill plant unit i applying two layers ceramic wear coat eromat at mill outlet elbow released from unit i during annual overhaul 2025 26
Mtps i mill plant unit i applying two layers ceramic wear coat eromat at mill outlet elbow released from unit i during annual overhaul 2025 26
Read moreof your Industry type