Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Tm Unit I Renewal Of Piston Seal And Piston Rod Packing In Hp Lp Bypass Valves And Its Spray Valves Actuators Including Servicing Of Oil Filters During Aoh Of 2024 25
|
Description |
Mtps I Tm Unit I Renewal Of Piston Seal And Piston Rod Packing In Hp Lp Bypass Valves And Its Spray Valves Actuators Including Servicing Of Oil Filters During Aoh Of 2024 25
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_453728_1 |
Reference Number |
CE / MTPS-I / SE / M-I / TM / OT. 20 / 2024-25 |
Tender Fee | 0 |
EMD | 2100 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=539950 |
Start Date | June 12, 2024 18:30 |
End Date |
26/06/2024 ( Expired 323 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Overhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Overhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Read moreMtps i tm i dismantling inspection and overhauling of pennwalt centrifuges 4a 4b in unit iv during coh 2025 26
Mtps i tm i dismantling inspection and overhauling of pennwalt centrifuges 4a 4b in unit iv during coh 2025 26
Read moreMtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop
Mtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop
Read moreMtps i tm i unit iv removal and re insulation of 210mw lmw design turbine and its auxiliaries during coh 2025 26
Mtps i tm i unit iv removal and re insulation of 210mw lmw design turbine and its auxiliaries during coh 2025 26
Read moreMtps tm unit i cleaning and painting of and outer portion of receiver tanks of 1 2 for instrument air and service air and renewal of manhole door gaskets and overhauling of safety valves of receiver tanks overhauling of silica gel type airdrie
Mtps tm unit i cleaning and painting of and outer portion of receiver tanks of 1 2 for instrument air and service air and renewal of manhole door gaskets and overhauling of safety valves of receiver tanks overhauling of silica gel type air drie
Read moreMtps i tm unit i cleaning hydraulic testing of lub oil coolers working oil coolers dismantling cleaning and assembling of suction strainers of bfps ceps renewal of bfp leak off line and suction discharge flange gaskets
Mtps i tm unit i cleaning hydraulic testing of lub oil coolers working oil coolers dismantling cleaning and assembling of suction strainers of bfps ceps renewal of bfp leak off line and suction discharge flange gaskets
Read moreMtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps
Mtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps
Read moreMtps i ca cws i renewal of the existing damaged pvc fills with new fills rearranging the hanging fills along with ss grp grid in cooling tower i during aoh 2025 2026 of unit i
Mtps i ca cws i renewal of the existing damaged pvc fills with new fills rearranging the hanging fills along with ss grp grid in cooling tower i during aoh 2025 2026 of unit i
Read moreKtps-v-tm-supervisory charges for 2 no of service engineers for overhauling of hp bypass main valves(bp1bp2) (model:ars100), hp bypass spray valves(bpe1,bpe2 bd) (model:e32s) and hp bypass oil supply units (model:ov 32 b) in unit-ix during aoh 2025-26.
Ktps-v-tm- supervisory charges for 2 no of service engineers for overhauling of hp bypass main valves(bp1 and bp2) (model:ars100), hp bypass spray valves(bpe1,bpe2 and bd) (model:e32s) and hp bypass oil supply units (model:ov 32 b) in unit-ix during aoh 2025-26.-reg.
Read moreMtpsi tm unit i renewal of piston seal piston rod packing in hp lp bypass valves and its spray valves actuators including servicing of oil filters during aoh of 2025 26
Mtpsi tm unit i renewal of piston seal piston rod packing in hp lp bypass valves and its spray valves actuators including servicing of oil filters during aoh of 2025 26
Read moreof your Industry type