Tender Details
Particulars | Details |
---|---|
Title |
Job 2 Construction Of Link Road Marwari To Joh Via Sandhani Km. 0 0 To 3 870 Including Bridge On Swan River At Rd 0 142 Sub Head Construction Of Bridge Sub Structure, Super Structure, Approaches And M.T In Bridge Approaches Under Nabard Ridf Xxx
|
Description |
Job 2 Construction Of Link Road Marwari To Joh Via Sandhani Km. 0 0 To 3 870 Including Bridge On Swan River At Rd 0 142 Sub Head Construction Of Bridge Sub Structure, Super Structure, Approaches And M.T In Bridge Approaches Under Nabard Ridf Xxx
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2024_PWD_96741_1 |
Reference Number |
Job 2 Construction of link road Marwari to Joh via Sandhani Km. 0-0 to 3-870 including bridge on |
Tender Fee | 5000 |
EMD | 17.73 Lakh |
Tender Value | |
Place | Daulatpur Chowk |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=142023 |
Start Date | December 19, 2024 15:30 |
End Date |
08/01/2025 ( Expired 124 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Improvement of brick soled road from k-a road (at manikbhandar rcc bridge) to lamboo-mayachari road via paul para under ridf xxx of nabard. (job no. tp/com/219/2024-25)
Improvement of brick soled road from k-a road (at manikbhandar rcc bridge) to lamboo-mayachari road via paul para under ridf xxx of nabard
Read moreConstruction of bridge(super structure) on kali river meerut-badaun marg (sh-18) urban area km-72 to 78 shikarpur bypass district bulandshahr
Construction of bridge(super structure) on kali river meerut-badaun marg (sh-18) urban area km-72 to 78 shikarpur bypass district bulandshahr
Read moreBalance work for construction of rcc br.no.4/1 on road from nh-39 to old nd road via balipathar shyam gaon over river dhansiri at neparpatty ferry ghat including approaches and protection works under mlcsna under ridf-xxv of nabard for 2019-20
Balance work for construction of rcc br.no.4/1 on road from nh-39 to old nd road via balipathar shyam gaon over river dhansiri at neparpatty ferry ghat including approaches and protection works under mlcsna under ridf-xxv of nabard for the year 2019-
Read moreConstruction of 58 20 mtr span steel truss bridge over sundru khad to connect village janglikh at rd 0 980 sh c o steel truss super structure including abutment and bed block with approach on both sides
Construction of 58 20 mtr span steel truss bridge over sundru khad to connect village janglikh at rd 0 980 sh c o steel truss super structure including abutment and bed block with approach on both sides
Read moreConstruction of link road from sarahar to gawal km 0/000 to 2/060 under mnp sub head wideing of road from existing width to 5/7 mtr wide road in km. 0/000 to 0/785 and formation cutting 5/7 mtr wide in km. 0/785 to 1/195
Construction of link road from sarahar to gawal km 0/000 to 2/060 under mnp sub head wideing of road from existing width to 5/7 mtr wide road in km. 0/000 to 0/785 and formation cutting 5/7 mtr wide in km. 0/785 to 1/195
Read moreUpgradation of link road from barring to tibok, othang and yangthang km. 0/00 to 9/215 under nabard-ridf-xxx sh rofd, mt, retaining wall, breast wall, cd work, v-shape drain, parapets, wire crate and sign board etc.
Upgradation of link road from barring to tibok, othang and yangthang km. 0/00 to 9/215 under nabard-ridf-xxx sh rofd, mt, retaining wall, breast wall, cd work, v-shape drain, parapets, wire crate and sign board etc.
Read moreConstruction of new link road sharinh wala saidan to toor, length 1.50 km. including maintenance of road for 5 year (one year defects liability period plus four year maintenance period) a.c. guruharsahai, distt fzr (under nabard ridf-xxx)
Construction of new link road sharinh wala saidan to toor, length 1.50 km. including maintenance of road for 5 year (one year defects liability period plus four year maintenance period) a.c. guruharsahai, distt fzr (under nabard ridf-xxx)
Read moreConstruction up-gradation of link road from oddinallah to dhawansh km 0/00 to 1/00 sub-head providing and laying tarring in km 0/000 to 1/00
Construction up-gradation of link road from oddinallah to dhawansh km 0/00 to 1/00 sub-head providing and laying tarring in km 0/000 to 1/00
Read moreConstruction of link road from gp chouli aganwadi centre to nichali chouli via dhiman basti km. 0/0 to 1/150 (sh c/o 6.00 mtr span rcc slab culvert at rd 1/055) under otmnp
Construction of link road from gp chouli aganwadi centre to nichali chouli via dhiman basti km. 0/0 to 1/150 (sh c/o 6.00 mtr span rcc slab culvert at rd 1/055) under otmnp
Read moreConstruction of 40 mtr span psct beam bridge over maslana khad on link road jowar maslana jaman kwali via guliar at rd 0/894 ic both side approaches sh const of rwall gsb wmm and bc for approaches under mmgsy
Balance work for construction of 40 mtr span psct beam bridge over maslana khad on link road jowar maslana jaman kwali via guliar at rd 0/894 ic both side approaches sh const of rwall gsb wmm and bc for approaches under mmgsy
Read moreof your Industry type