Tender Details

Particulars Details
Title
Job 2 Construction Of Link Road Marwari To Joh Via Sandhani Km. 0 0 To 3 870 Including Bridge On Swan River At Rd 0 142 Sub Head Construction Of Bridge Sub Structure, Super Structure, Approaches And M.T In Bridge Approaches Under Nabard Ridf Xxx
Description
Job 2 Construction Of Link Road Marwari To Joh Via Sandhani Km. 0 0 To 3 870 Including Bridge On Swan River At Rd 0 142 Sub Head Construction Of Bridge Sub Structure, Super Structure, Approaches And M.T In Bridge Approaches Under Nabard Ridf Xxx
Organisation PWD | State Govt. and UT
Tender Id 2024_PWD_96741_1
Reference
Number
Job 2 Construction of link road Marwari to Joh via Sandhani Km. 0-0 to 3-870 including bridge on
Tender Fee 5000
EMD 17.73 Lakh
Tender Value
Place Daulatpur Chowk
Link https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=142023
Start Date December 19, 2024 15:30
End Date

08/01/2025 ( Expired 149 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Improvement of road from ganaur shahpur road to khanpur via saiya khera kailana dubeta kasandi rd 0.00 to 16.15 km id 6083 ) (under nabard scheme ridf xxx

Improvement of road from ganaur shahpur road to khanpur via saiya khera kailana dubeta kasandi rd 0.00 to 16.15 km id 6083 ) (under nabard scheme ridf xxx

Read more
Construction of high level bridge single span steel truss 36.00 m eff. over sirhind canal x-ing gobindpura to bathinda-talwandi road via bhucho kalan at rd 7.60 km including approaches under pmgsy-iii (batch-i) package no pb-02 046, block nathana, di

Construction of high level bridge single span steel truss 36.00 m eff. over sirhind canal x-ing gobindpura to bathinda-talwandi road via bhucho kalan at rd 7.60 km including approaches under pmgsy-iii (batch-i) package no pb-02 046, block nathana, di

Read more
Improvement of brick soled road from k-a road (at manikbhandar rcc bridge) to lamboo-mayachari road via paul para under ridf xxx of nabard. (job no. tp/com/219/2024-25)

Improvement of brick soled road from k-a road (at manikbhandar rcc bridge) to lamboo-mayachari road&amp#x0d via paul para under ridf xxx of nabard

Read more
Job 1 construction of and m.t of link road bhera malkada to panjora via baba balak nath temple including 1 no. bridge km. 0-0 to 8-635 sub head formation cutting , retaining wall , cross drainage work, gsb, wmm, 30mm thick sdbc, c.c. pavement, u

Job 1 construction of and m.t of link road bhera malkada to panjora via baba balak nath temple including 1 no. bridge km. 0-0 to 8-635 sub head formation cutting , retaining wall , cross drainage work, gsb, wmm, 30mm thick sdbc, c.c. pavement, u

Read more
Job 2 construction of boul jhamber lam upto takka bridge mohalla batia harizen from km. 0-0 to 8-745 sub head 5-7 meter wide formation cutting, retaining wall, cross drainage work, p.l gsb, w.m.m. and 30mm thick bituminous concrete, c.c. pavement, u

Job 2 construction of boul jhamber lam upto takka bridge mohalla batia harizen from km. 0-0 to 8-745 sub head 5-7 meter wide formation cutting, retaining wall, cross drainage work, p.l gsb, w.m.m. and 30mm thick bituminous concrete, c.c. pavement, u

Read more
Construction and m.t of rama mandir to bane di hatti via andora upperla, jattan-da- beehra from km. 0-0 to 3-225 including 1 no. bridge over amb khad at rd 0-450 on pucca paroh andora road in district una h.p under nabard ridf-xxx

Construction and m.t of rama mandir to bane di hatti via andora upperla, jattan-da- beehra from km. 0-0 to 3-225 including 1 no. bridge over amb khad at rd 0-450 on pucca paroh andora road in district una h.p under nabard ridf-xxx

Read more
Repair and maintenance of damages road and bridges (c/o link road khaltu to saroa to jankhuni km. 0/00 to 1/060) (sub-head f/c work from rd 0/210 to 1/060 and c/o 900mm dia hume pipe culvert at rd 0/180 and 0/600)

Repair and maintenance of damages road and bridges (c/o link road khaltu to saroa to jankhuni km. 0/00 to 1/060) (sub-head f/c work from rd 0/210 to 1/060 and c/o 900mm dia hume pipe culvert at rd 0/180 and 0/600)

Read more
Construction of link road nh 154 to dhanotu via bad basti km 0/000 to 3/670 in district kangra (hp) under nabard ridf-xxx (nabard)

Sh formation cutting, passing places, retaining walls, cross drainage work, providing and laying granular sub base, wbm-ii, wbm-iii, tarring work, cement concrete pavement, side drain and parapets) including five year maintenance after completion

Read more
Construction of bridge(super structure) on kali river meerut-badaun marg (sh-18) urban area km-72 to 78 shikarpur bypass district bulandshahr

Construction of bridge(super structure) on kali river meerut-badaun marg (sh-18) urban area km-72 to 78 shikarpur bypass district bulandshahr

Read more
Balance work for construction of rcc br.no.4/1 on road from nh-39 to old nd road via balipathar shyam gaon over river dhansiri at neparpatty ferry ghat including approaches and protection works under mlcsna under ridf-xxv of nabard for 2019-20

Balance work for construction of rcc br.no.4/1 on road from nh-39 to old nd road via balipathar shyam gaon over river dhansiri at neparpatty ferry ghat including approaches and protection works under mlcsna under ridf-xxv of nabard for the year 2019-

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise