Tender Details
Particulars | Details |
---|---|
Title |
Howrah Division Trr(p) Kan Snt Up Sbg 7.719 Km To 8.500 Km &Amp 62.400 Km To 63.256 Km Total Trr(p) 1.637 Km ,
Ctr(p) Nht Bdag Dn Sbg 129 Km To 129.520 Km = 0.52 Km
Trr(s) Kan Snt Up Loop Line 0.00 100 = 1.00 Km ,
Tfr Work In Kan Snt Dn Sbg 1 3.500 = 2.500 Km &Amp Dn Sbg 0.00 1.00 = 1.00 Km &Amp Nht Bdag Dn Sbg 121 129 = 8 Km, 130 131 = 1 Km, Up Sbg 113 120 = 7 Km Total Tfr 19.5 Km
&Amp Tbr 7.410 Km In The Following Locations
Kan Snt Up Sbg 60.015
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 73162825 |
Reference Number |
300_2023-24 |
Tender Fee | 0 |
EMD | 2.18 Lakh |
Tender Value | |
Place | Kolkata |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/022024/73162825/viewNitPdf_4457776.pdf |
Start Date | January 25, 2024 19:17 |
End Date |
19/02/2024 ( Expired 427 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
S&t work in connection with:- (a) mldt division tph-rjl sl trr(p)= 1.29 km & trrp bgp-jmp up 305.112-305.621 = 0.509 km, (b) tinpahar - rajmahal (sl) - tsr(p) - 3.000 tkm, (c) tfr- sl 97.4-114.37=18.97 km in section of mdle-dumka and trr(p) 0.580km in section of bhle-baka, (d) new farakka - malda (up & dn) - tsr(p) - 4.252 tkm, (e) new farakka - malda town (dn) - trr(p) - 0.500 tkm, (f) malda division - ctr(s) - 51.750 tkm, (g) malda division - trr(s) -14.976 tkm, (h) jamalpur - ki
For complete deion and other details, please refer to tender
Read more(i) spj (ex) - mfp-hjp(ex) section : through fittings renewal (tfr) = 16.399 km. (ii) spj (ex) - mfp (up) section : trr/p = 0.90 tkm (iii) bju-bca-spj(ex)-mfp section : glued joint renewal with 60 kg. = 79 nos. & (iv) between hajipur (ex) - muzaffarpur (up & dn) section : tbr with deep screening of ballast 300 mm with bcm (total = 16.544 km.) under jurisdiction of sr. den/3/see.
For complete deion and other details, please refer to tender
Read more1) ctr(s) 1.19 tr. km of line no.7 at santaldih station in rukni- bhojudih section 2)trr(s) for 16.121 tkm under den(north)/adra 3) trr(p) manually for km 384.999-385.347(dn) in ksx-bksc and km 313.635-314.189(dn) in bje-vaa for total 0.902 tr km 4) tbr manually for 9.408 tkm under den(north)/adra 5) layout correction of crossover at santaldih,mohuda, sudamdih yard by t-28 machine. 6) casual sleeper renewal- 6934 nos. bksc-rjb, bje-vaa, adra-gmo and rui-bje section.
For complete deion and other details, please refer to tender
Read moreSecunderabad division -sw-(i) sc-wd & vkb-prli section (dn line): ctr (p) of exg. 52kg/60kg/72uts/90uts rails on psc5 sleepers 1540nos/km density with new 60kg/90uts rails on psc6 wide sleepers 1660 nos./km including recoupment and increasing of ballast cushion to 35 cm. and deep screening of ballast for a total length of 1.377kms. sw-(ii) sc-wd section (up & dn line): trr (p) of exg. 52kg/90uts rails on psc6 sleepers 1660nos/km density with new 60kg r260 grade rails (lwr) for a total
For complete deion and other details, please refer to tender
Read moreHowrah division: ctr(s) - 0.9 tkm. in the location:she - tak, tak up loop-1 0 - 0.900 = 0.900 km, trr(p) - 7.272 tkm. in the location: bly - bdc -up ml 25.018 - 29.170 = 4.152 km, she - gogt dn 33.719 - 35.019 = 1.300 km, up 33.700 - 35.520 = 1.820 km & tfr - 9.186 tkm in location she - gogt dn 18.700 - 21.974 = 3.274 km, dn 26 - 27 = 1 km, sl 35.588 - 37 = 1.412 km, sl 44 - 46 = 2 km, sl 52 - 53.500 = 1.500 km & tbr- 8.084 tkm in she - gogt sl 41.447 - 41.812 = 0.365 km, 47.422 - 47.9
For complete deion and other details, please refer to tender
Read more(a)kan-pka-ctr(p)-19.699tkm,(b)kan-pka-trr(p)-15.884tkm,(c)udl-snt(dn line)-trr(p)-18.927tkm,(d)udl-snt(up & dn)-trr(p)-12.1160 tkm,(e)udl-snt(dn)-trr(p)-10.700tkm, (f)udl-snt & udl-stn-ttr(fstwswcmsc)-106sets(1:12-56sets & 1:8.5)-50sets(g)trrp=1.94(km 159.88-161.82 on dn-i line) in kan-asn section, (h) ctrp=1.05 km(km 165.19-166.24 on dn-i line) in kan-asn section, (i)ctrp=0.76 km(km 166.24-167.00) on dn-i line in kan-asn section (j)ctrp=0.59 km(km 127.780-127.930 & 167.560-
For complete deion and other details, please refer to tender
Read moreBalance work of through fitting renewal in patna-gaya section at up line km 3.16-4.98, 17.90-19.20, 65.20-67.394 and dn line km 2.489-4.98 & 5.22-7.40 (total = 9.977 tkm), complete track renewal (ctr/p) work by pqrs between pnbe-gaya section of aden/jhd. up 85.55-86.85 = 1.30 tkm & up: 89.20 - 90.80 = 1.60tkm & through ballast renewal (tbr) work at km 12.80 to 14.30 in up line and km 15.00 to 15.53, km 17.42 to 19.42,km 22.30 to 22.60 km 27.70 to 28.10, km 30.00 to 44.00 & 7
For complete deion and other details, please refer to tender
Read moreAden/hq-ii/jp sub division: ttr & ttsr 1:12 (8 nos) and 1:8.5 (9 nos) in jp yard ,trr (p) total 1.38 km with 60 kg in up main line and in dn line in jp yard , ctr total 1.116 km in gadj -jp section and jp yard, increasing the csr of line no. 2 of jp yard.
For complete deion and other details, please refer to tender
Read more(i) spj (ex) - mfp-hjp(ex) section : through fittings renewal (tfr) = 16.399 km. (ii) spj (ex) - mfp (up) section : trr/p = 0.90 tkm (iii) bju-bca-spj(ex)-mfp section : glued joint renewal with 60 kg. = 79 nos. & (iv) between hajipur (ex) - muzaffarpur (up & dn) section : tbr with deep screening of ballast 300 mm with bcm (total = 16.544 km.) under jurisdiction of sr. den/3/see.
For complete deion and other details, please refer to tender
Read more1) ctr(s) 1.19 tr. km of line no.7 at santaldih station in rukni- bhojudih section 2)trr(s) for 16.121 tkm under den(north)/adra 3) trr(p) manually for km 384.999-385.347(dn) in ksx-bksc and km 313.635-314.189(dn) in bje-vaa for total 0.902 tr km 4) tbr manually for 9.408 tkm under den(north)/adra 5) layout correction of crossover at santaldih,mohuda, sudamdih yard by t-28 machine. 6) casual sleeper renewal- 6934 nos. bksc-rjb, bje-vaa, adra-gmo and rui-bje section.
For complete deion and other details, please refer to tender
Read moreof your Industry type