Tender Details
Particulars | Details |
---|---|
Title |
(A)kan Pka Ctr(p) 19.699 Tkm,(B)kan Pka Trr(p) 15.884 Tkm,(C)udl Snt(dn Line) Trr(p) 18.927 Tkm,(D)udl Snt(up &Amp Dn) Trr(p) 12.1160 Tkm,(E)udl Snt(dn) Trr(p) 10.700 Tkm, (F)udl Snt &Amp Udl Stn Ttr(fstwswcmsc) 106sets(1:12 56 Sets &Amp 1:8.5) 50 Sets(g)trrp=1.94(km 159.88 161.82 On Dn I Line) In Kan Asn Section, (H) Ctrp=1.05 Km(km 165.19 166.24 On Dn I Line) In Kan Asn Section, (I)ctrp=0.76 Km(km 166.24 167.00) On Dn I Line In Kan Asn Section (J)ctrp=0.59 Km(km 127.780 127.930 &Amp 167.560
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 77148449 |
Reference Number |
TRD-WC-T-2024-25-19 |
Tender Fee | 0 |
EMD | 2.35 Lakh |
Tender Value | |
Place | Kolkata |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/102024/77148449/viewNitPdf_4698829.pdf |
Start Date | September 20, 2024 21:58 |
End Date |
22/10/2024 ( Expired 202 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Signalling works in connection with ctr/ttr works under ph-31 for pwp 2023-24 in south section of mumbai division & shifting of neutral section at km 39/320 between klva - mbq section on dn th line.
For complete deion and other details, please refer to tender
Read moreExecution of signaling & telecommunication work in connection with: (1) bilaspur-durg: bilaspur - durg ctr(s) - 13.393 tkm & raipur - lakholi - ctr(s) - 18.659 tkm., (2) bilaspur-durg-ttr(cmsc)- 37 sets, ttr (tws)- 21 set & ttr (cs) - 41 sets, (3) construction of rub (fhs) at km 734/33-735/35a in lieu of manned level crossing no. 373 (belha yard) at km 734/25-27 between belha-dagori section in howrah-mumbai main line on cost sharing basis, (4) construction of rub in lieu of lc no.
For complete deion and other details, please refer to tender
Read moreThrough rail renewal (primary) along with tfr of existing 60 kg 90 uts rails laid on psc-14 sleeper with new 60 kg 90uts/r260 rails (lwr) for barajamda jn - gua - trr(p) - 4.500 tkm, padapahar - bolanikhadan - trr(p) - 5.500 tkm & padapahar - nayagarh - trr(p) - 28.112 tkm. and 1.595 tr. km on up line at km 331.00 - 332.595 between jnk-tabu section under the jurisdiction of sr.den(south)/ckp.
For complete deion and other details, please refer to tender
Read moreSw-i- manmad - mudkhed (up/dn) - cess repair - 86700 cum & akola - purna - cess repair - 40000 cum( irpsm id-11.0.31.24.3.53.010 pb no. 157 of fy 2024-25) sw-ii - nanded division - manmad-mudkhed (up& sl) section : ctr(p) of exg. 60kg/90uts rails on psc6 sleepers 1660nos/km density with new 60kg r260 grade rails (lwr) on new wider psc sleepers 1660 nos./km including recoupment and increasing of ballast cushion to 35 cm. and deep screening of ballast for a total length of 15.317 km. (sa
For complete deion and other details, please refer to tender
Read more1) vpy-wst section up line: ctr (p) -0.853 km & trr (p) on br. no. 10 r & 16 r -0.047 km 2) ctr(p)-vlk-anng -3.616 km with 60kg /psc/1660 nos/km between km. 0-3.616 in single line
For complete deion and other details, please refer to tender
Read moreS&t work in connection with:- (a) mldt division tph-rjl sl trr(p)= 1.29 km & trrp bgp-jmp up 305.112-305.621 = 0.509 km, (b) tinpahar - rajmahal (sl) - tsr(p) - 3.000 tkm, (c) tfr- sl 97.4-114.37=18.97 km in section of mdle-dumka and trr(p) 0.580km in section of bhle-baka, (d) new farakka - malda (up & dn) - tsr(p) - 4.252 tkm, (e) new farakka - malda town (dn) - trr(p) - 0.500 tkm, (f) malda division - ctr(s) - 51.750 tkm, (g) malda division - trr(s) -14.976 tkm, (h) jamalpur - ki
For complete deion and other details, please refer to tender
Read moreSw-i- manmad - mudkhed (up/dn) - cess repair - 86700 cum & akola - purna - cess repair - 40000 cum( irpsm id-11.0.31.24.3.53.010 pb no. 157 of fy 2024-25) sw-ii - nanded division - manmad-mudkhed (up& sl) section : ctr(p) of exg. 60kg/90uts rails on psc6 sleepers 1660nos/km density with new 60kg r260 grade rails (lwr) on new wider psc sleepers 1660 nos./km including recoupment and increasing of ballast cushion to 35 cm. and deep screening of ballast for a total length of 15.317 km. (sa
For complete deion and other details, please refer to tender
Read moreRajkot division- signalling work in connection with engineering work (1)rajkot - okha - ctr(p) - 11.568 tkm, trr (p) - 22.212 tkm and tsr (p) - 26.80 tkm.(2)kanalus-sikka-trr (s)-1.550tkm & rjt-okha-trr(s)-9.131tkm (total-10.681tkm).(3)sunr-rjt(dn)-ctr(p)-9.793tkm, trr(p)-10.614tkm & tsr(p)-3.750 tkm.(4)rjt div-ttr(cscmsc)-19 sets.(5) rjt div-tbr 58.379 tkm(tl),tbr 4.278 tkm(loop line) & tbr of 24 nos (p&c).
For complete deion and other details, please refer to tender
Read moreVarious base depot/site activities in c/w ctr(p) - 26.822 tkm of existing track laid with 52kg rails of psc-5 sleepers (1540/km) with 60kg (90/110 uts) new rails on psc wider seat sleepers 1660 nos./km (lwr) with raising ballast cushion 25cm to 35cm from km.8.00 to km.12.00, km.14.00 to km.18.00 & km.19.89 to km.27.78 on up line and km.75.00 to km.81.432 on suchipind-pathankot section under sr.den-i/fzr.
For complete deion and other details, please refer to tender
Read moreTrr (p) 45.30 km of existing old 52kg rails with 60 kg (90/110 uts) new rails from dn line km. 4.50 to km.12.00, km.14.00 to km 34.30, km.36.40 to km.48.20, km.53.10 to km.55.20 and km.59.20 to km 62.80 on suchipind-pathankot section under sr.den-i/fzr.
For complete deion and other details, please refer to tender
Read moreof your Industry type