Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
1. Periodical Repair Of Road From Twibaklai Malsom To Darjeeling Bari (Link No 025) (L 1.868 Km) During The Year 2023 24
|
Description |
1. Periodical Repair Of Road From Twibaklai Malsom To Darjeeling Bari (Link No 025) (L 1.868 Km) During The Year 2023 24
|
Organisation | Government of Tripura |
Tender Id | 2023_CEPWD_41730_1 |
Reference Number |
97/NIT/SE-III/R/2023-24 |
Tender Fee | 1000 |
EMD | 99239 |
Tender Value | |
Place | O/O the Executive Engineer, PWD, Udaipur Division |
Link | https://tripuratenders.gov.in |
Start Date | September 05, 2023 23:35 |
End Date |
29/09/2023 ( Expired 624 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreConsultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Read moreCa no. cwe/hills/rkt/06 of 2025-2026 special repair of, road to upper kaligadhera pump house, road from helipad to main majkhali, internal road at the kumaon regimental centre, pcc road from mt area to gandhi line between building no p-50 to p-52, in
Ca no. cwe/hills/rkt/06 of 2025-2026 special repair of, road to upper kaligadhera pump house, road from helipad to main majkhali, internal road at the kumaon regimental centre, pcc road from mt area to gandhi line between building no p-50 to p-52, in
Read moreStrengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore-villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu (job no. nh-38-tn-2024-25-1039
Strengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore-villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu (job no. nh-38-tn-2024-25-1039
Read moreDalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Dalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Read moreNagor re- alignment stretch from km. 415.900 to km. 418.300 surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Nagor re- alignment stretch from km. 415.900 to km. 418.300 surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Read moreIndependent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll
Independent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll
Read moreRising of road adjacent to gate no.1 and repair of western approach path in front of main factory building at old s r mint
Rising of road adjacent to gate no.1 and repair of western approach path in front of main factory building at old s r mint
Read moreSurface improvement and road safety work under crif from km 75.50 to 143.40 of state highway no. 32 of late shri geetaram pokhriyal motor road (marchula- saraikhet- baijro- pokhda- satpuli- pauri motor road).
Surface improvement and road safety work under crif from km 75.50 to 143.40 of state highway no. 32 of late shri geetaram pokhriyal motor road (marchula- saraikhet- baijro- pokhda- satpuli- pauri motor road).
Read moreZone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Zone no. 01, ward no. 04, at khaira purani basti (1) construction of rcc drain and toplayer cement concrete road form satish rawat ji house to rajkumar yadav ji house, (2) construction of rcc drain and wbm road from sanchi road to rajendra saket ji..
Read moreof your Industry type