Tender Details

Particulars Details
Title
Rcc Drain Black Toping At Sirasdevi Ratanapur Village In Km 334 00 Gadi To Km 434 00 Manvat And Reconstruction Of Canal Bridge Sawargaon Km 387 700 On Nh61 In The State Of Maharashtra
Description
Rcc Drain Black Toping At Sirasdevi Ratanapur Village In Km 334 00 Gadi To Km 434 00 Manvat And Reconstruction Of Canal Bridge Sawargaon Km 387 700 On Nh61 In The State Of Maharashtra
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 5000
EMD 6.39 Lakh
Tender Value
Place Chhatrapati Sambhajianagar
Link

AAAAAAAAAA

Login to view
Start Date October 10, 2024 14:30
End Date

06/05/2025 ( 14 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rcc drain black toping at sirasdevi ratanapur village in km 334 00 gadi to km 434 00 manvat and reconstruction of canal bridge sawargaon km 387 700 on nh61 in the state of maharashtra

Rcc drain black toping at sirasdevi ratanapur village in km 334 00 gadi to km 434 00 manvat and reconstruction of canal bridge sawargaon km 387 700 on nh61 in the state of maharashtra

Read more
Six laning of surat nashik ahmednagar solapur mh-knt border greenfield stretch package-v from km.146.000 (chehedi khurdh) to km.190.560 (khandalwadi) in the state of maharashtra to be d on hybrid annuity mode under bmp

Six laning of surat nashik ahmednagar solapur mh-knt border greenfield stretch package-v from km.146.000 (chehedi khurdh) to km.190.560 (khandalwadi) in the state of maharashtra to be d on hybrid annuity mode under bmp

Read more
Six laning of surat nashik ahmednagar solapur mh-knt border greenfield stretch package-x from km 370.000 (chinchpur (b) village) to km 415.500 (nagobachiwadi village) in the state of maharashtra on ham under bmp

Six laning of surat nashik ahmednagar solapur mh-knt border greenfield stretch package-x from km 370.000 (chinchpur (b) village) to km 415.500 (nagobachiwadi village) in the state of maharashtra on ham under bmp

Read more
Re construction of 3 lane minor bridge at km. 320.052 on rhs on puintola tangi section of nh 16 in the state of odisha on epc mode

Re construction of 3 lane minor bridge at km. 320.052 on rhs on puintola tangi section of nh 16 in the state of odisha on epc mode

Read more
Widening reconstruction and upgradation to 2 lane with paved shoulder four lane configuration for the work of sautada to shirapur section of nh 561 from design km 86.300 to 125.589 in the state of maharashtra on epc mode. design length 39.289 km

Widening reconstruction and upgradation to 2 lane with paved shoulder four lane configuration for the work of sautada to shirapur section of nh 561 from design km 86.300 to 125.589 in the state of maharashtra on epc mode. design length 39.289 km

Read more
Construction of balance service road at pilukhedi and biaora end alongwith rcc drain and development of median opening and junctions improvement on bpl biaora section nh12 new nh46 from design km 324.00 to km 421.325 in the state of mp

Construction of balance service road at pilukhedi and biaora end alongwith rcc drain and development of median opening and junctions improvement on bpl biaora section nh12 new nh46 from design km 324.00 to km 421.325 in the state of mp

Read more
Construction of minor bridge on chikhal wardha pata pangara road vr-152 in km 3/800 in taluka ghatanji. dist. yavatmal

Construction of minor bridge on chikhal wardha &amp#x0d pata pangara road vr-152 in km 3/800 in taluka &amp#x0d ghatanji. dist. yavatmal

Read more
2nd call construction of rcc drains at various villages towns location from km 28 000 to km 67 600 on dhad bhokardan road section of nh 753m in the state of maharashtra on epc mode

2nd call construction of rcc drains at various villages towns location from km 28 000 to km 67 600 on dhad bhokardan road section of nh 753m in the state of maharashtra on epc mode

Read more
Construction of balance work of rob and pup including slip road, median, rcc drain, footpath etc. from km 441.970 to km443.560 at saundad on nh-53 in the state of maharashtra on epc mode

Construction of balance work of rob and pup including slip road, median, rcc drain, footpath etc. from km 441.970 to km443.560 at saundad on nh-53 in the state of maharashtra on epc mode

Read more
Construction of cc shoulder culvert, drain and damage r/wall and b/wall from km 68.750 to km 75.00 on nh-107(old 109) under annual plan of nh(o) 2023-24 in the state of uttarakhand under epc mode.

Construction of cc shoulder culvert, drain and damage r/wall and b/wall from km 68.750 to km 75.00 on nh-107(old 109) under annual plan of nh(o) 2023-24 in the state of uttarakhand under epc mode.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise